DOCKET NO. 56 – Metro Mobile CTS of New Haven, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of facilities to provide cellular service in New Haven County. (Findings of Fact), (Opinion), (Dissenting Opinion), and (Decision and Order).
DOCKET NO. 56A – Metro Mobile CTS of New Haven, Inc. Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of facilities to provide cellular service in New Haven County; amendment resolution. (Findings of Fact), (Opinion), (Dissenting Opinion), and (Decision and Order).
DOCKET NO. 149 - United Illuminating Certificate to erect a new 115,000/13,800 volt substation located at 260 Railroad Avenue, West Haven, and to modify two existing 115,000 volt overhead transmission lines to connect this substation to UI’s transmission system. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 272 - The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (West Haven) (Findings of Fact), (Appendix A), (Appendix B), (Appendix C), (Opinion), (Decision and Order), (Record).
DOCKET NO. 293 - Omnipoint Communications, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance and operation of a wireless telecommunications facility at one of two locations off of Route 162, West Haven, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 508 – The United Illuminating Company (UI) application for a Certificate of Environmental Compatibility and Public Need for the Milvon to West River Railroad Transmission Line 115-kV Rebuild Project that consists of the relocation and rebuild of its existing 115- kilovolt (kV) electric transmission lines from the railroad catenary structures to new steel monopole structures and related modifications to facilitate interconnection of the rebuilt 115-kV electric transmission lines at UI’s existing Milvon, Woodmont, Allings Crossing, Elmwest and West River substations along approximately 9.5 miles of the Connecticut Department of Transportation’s Metro-North Railroad corridor traversing the municipalities of Milford, Orange, West Haven and New Haven, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
PETITION NO. 115 - United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for reconductoring and reinsulating approximately 11.8 miles of 115-kV line between its West River and Baird Substation, excluding the Mildale Substation to Devon Substation section. Staff Report. Approved 10/9/84
PETITION NO. 438 - United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of transmitters and receivers associated with a remote network meter reading system within UI's service area. Staff Report. Approved 11/9/99
PETITION NO. 660 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed antenna installation on an existing smokestack at 14 Gilbert Street, West Haven, Connecticut. Staff Report. Approved 03/04/04
PETITION NO. 876 - United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Advanced Metering Infrastructure Project located at the proposed substations; Allings Crossing Substation, Frontage Road, West Haven; Ash Creek Substation, Poland Street, Bridgeport; Baird Substation, Stratford Avenue, Stratford, Barnum Substation Barnum Avenue, Stratford; Broadway Substation, Goffe Street, New Haven; Congress Substation, Congress Street, Bridgeport; Devon Tie Substation, Naugatuck Avenue, Milford; East Shore Substation, Waterfront Street, New Haven; Elmwest Substation, Elm Street, West Haven; June St. Substation, Hazell Terrace, Woodbridge; Mill River Substation, Grand Avenue, New Haven; Old Town Substation, Kachele Place, Bridgeport; Pequonnock Substation, Henry Street, Bridgeport; Sackett Substation, State Street, North Haven; and Water Street Substation, Water Street, New Haven. Staff Report. Approved 12/18/08
PETITION NO. 878 - Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut. Staff Report. Approved 02/19/09
PETITION NO. 940 - United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed transmission structure relocation work in connection with the Department of Transportation West Haven Railroad Station project located in West Haven, Connecticut. Staff Report. Approved 0/18/10
PETITION NO. 1094 – United Illuminating declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed upgrades to the Elmwest Substation located at 335 Elm Street, West Haven, Connecticut. Staff Report. Completion Letter. Approved 04/03/14
PETITION NO. 1108 – American Tower Corporation and New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the expansion of an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Filing. Staff Report.Status. Approved 08/21/04
PETITION NO. 1142 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at 2 Ocean Avenue, West Haven, Connecticut. Decision Letter and Staff Report. Remote Radio Head Change 07/10/15. Completion Letter Approved 04/02/15.
PETITION NO. 1329 - Doosan Energy Solutions America, Inc. Doosan Fuel Cell America, Incorporated petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 440 kilowatt fuel cell facility to be located at the West Haven Water Pollution Control Authority Complex, 2 Beach Street, West Haven, Connecticut. Approved 11/09/17
PETITION NO. 1450 - ClearCell Power, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the construction, maintenance, and operation of a customer-side 460-kilowatt fuel cell facility and associated equipment to be located at the Best Western Hotel, 490 Saw Mill Road, West Haven, Connecticut. Approved 06/03/21
PETITION NO. 1505– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot United Illuminating Company-owned utility pole that is not used principally for electric distribution service and associated equipment to be located along the public right-of-way on the west side of the Callegari Drive cul-de-sac, West Haven, Connecticut. Approved 06/09/22
PETITION NO. 1511– New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless facility on a new 43-foot AT&T-owned utility pole that is not used principally for electric distribution service and associated equipment located along the public right-of-way near the Metro-North Railroad across from 80 Allings Crossing Road, West Haven, Connecticut. Approved 06/23/22
PETITION NO. 1519- Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 300-kilowatt fuel cell facility and associated equipment to be located at the University of New Haven, 300 Boston Post Road, West Haven, Connecticut. Approved 07/21/22
PETITION NO. 1641 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a small wireless telecommunications facility on the roof of the Best Western Hotel and associated equipment at ground level located at 490 Saw Mill Road, West Haven, Connecticut.Approved 11/21/24
Bell Atlantic NYNEX Mobile - Antenna Upgrades - 24 Rockdale Road, West Haven, Connecticut. November 22, 1995 Antenna Upgrade Filing
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at One Burwell Rd., West Haven.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located on One Burwell Rd., West Haven.
Storer Cable TV of CT, Inc., notice of intent to modify an existing CATV head-end facility located east of Fairfax Ave., West Haven.
EM-NEXTEL-156-990329 - Nextel Communications notice of intent to modify an existing telecommunications facility located off 1 Burwell Road in West Haven.
EM-COMCAST-156-990607 - Comcast Cable Communications, Inc. notice of intent to modify an existing head-end facility at 300 Burwell Hill Road in West Haven.
EM-AT&T-156-990920 - AT&T Wireless PCS notice of intent to modify an existing telecommunications facility located at One Burwell Road in West Haven.
TS-BAM-156-000601 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 85 Plainfield Avenue in West Haven.
EM-VOICESTREAM-156-010530 - VoiceStream Wireless notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut.
EM-CING-084-156-020719 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Milford and West Haven, Connecticut.
EM-AT&T-"UNIVERSAL"-030221 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-VER-002-062-084-101-107-156-040129 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 401 Wakelee Avenue, Ansonia; 265 Benham St., Hamden; 890 Evergreen Avenue, Hamden; West Rock Park, Hamden; 111 Schoolhouse Road, Milford; Universal Drive, North Haven; 117 Washington Avenue, North Haven; Orange Center Road, Orange; Ogg Meadow Road, Orange; 85 Plainfield Avenue, West Haven; 24 Rockdale Road, West Haven, Connecticut. Complete File
EM-CING-078-156-107-101-060717 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1298 Storrs Road, Mansfield; 1 Burwell Road, West Haven; South Orange Center Road, Orange; and 15 (aka 8) Dwight Street, North Haven, Connecticut. Complete File
EM-T-MOBILE-156-151014 - T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision. Completion Letter.
EM-AT&T-156-160222 - AT&T Mobility, LLC notice of intent to modify an existing telecommunications facility located at 204 Burwell Hill Road, West Haven, Connecticut. DecisionExtension Request and CSC Decision2nd Extension Request and CSC Decision 3rd Extension Request and CSC Decision
EM-T-MOBILE-156-160328 - T-Mobile notice of intent to modify an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut. Decision. Completion Letter.
EM-T-MOBILE-156-160627 - T-Mobile notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. Decision.Completion Letter
EM-T-MOBILE-156-160721 - T-Mobile notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. DecisionCompletion Letter
EM-AT&T-156-161220 - AT&T notice of intent to modify an existing telecommunications facility located at 204 Burwell Hill Road, West Haven, Connecticut. Decision.
EM-AT&T-156-170113 – AT&T notice of intent to modify an existing telecommunications facility located at 204 Burwell Road, West Haven, Connecticut. Incomplete Letter. DecisionCompletion letter
EM-T-MOBILE-156-170420 – T-Mobile notice of intent to modify an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut. DecisionCompletion Letter
EM-T-MOBILE-156-170822 - T-Mobile notice of intent to install a temporary telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. Decision
EM-SPRINT-156-170921 - Sprint notice of intent to modify an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut Decision Completion Letter
EM-VER-156-180405 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. DecisionExtension Request and Council Decision Notice of Completion
EM-SPRINT-156-180821 – Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Incomplete Letter Decision - Denial
EM-SPRINT-156-180913 – Sprint Spectrum Realty Company, LP notice of intent to modify an existing telecommunications facility located at 250 Derby Avenue, West Haven, Connecticut. Decision Completion Letter Construction Complete
EM-ATC-156-190111 - American Tower Corporation, Inc. (ATC) notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision Notice of Completion
EM-T-MOBILE-156-190226 - T-Mobile notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Incomplete LetterResponse to Incomplete and Council Acknowledgement Decision
EM-SPRINT-156-190308 - Sprint notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Incomplete Letter Response and 2nd Incomplete Letter Denial Letter
EM-CING-156-190318 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision
EM-VER-156-190329 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. Decision Completion Letter
EM-SPRINT-156-190517 - Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision Will Not Complete Letter
EM-T-MOBILE-156-190828 - T-Mobile notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision
TS-VER-156-190729– Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located 204 Burwell Road, West Haven, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Project Cancellation Letter
EM-VER-156-191113 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located 668 Jones Hill Road, West Haven, Connecticut. Decision Will Not Complete Letter
EM-CING-156-200124 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision Notice of Cancellation
EM-UI-156a-200402e - The United Illuminating Company (UI) notice of intent to modify an existing energy facility located at 260 Frontage Road, West Haven, Connecticut. Decision Extension Request and Council Approval Notice of Completion
EM-UI-156b-200402e - The United Illuminating Company (UI) notice of intent to modify an existing energy facility located 335 Elm Street, West Haven, Connecticut. Decision Completion Letter
EM-T-MOBILE-156-200831 - T-MOBILE notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision Start of Construction Notice of Completion
EM-T-MOBILE-156-200918 – T-Mobile notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. Decision Notice of Construction Start Notice of Completion
EM-VER-156-210419 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located 24 Rockdale Road, West Haven, Connecticut. Decision Notice of Completion Notice of Commencement of Construction
EM-T-MOBILE-156-210430 - T-Mobile notice of intent to modify an existing telecommunications facility located at 250 Derby Avenue, West Haven, Connecticut. Decision Notice of Completion
EM-CING-156-210603 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Decision Notice of Completion
EM-VER-156-210730 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Approval Notice of Construction Commencement Notice of Construction Completion
EM-T-MOBILE-156-211012 – T-Mobile notice of intent to modify an existing telecommunications facility located at 250 Derby Avenue, West Haven, Connecticut. Decision Notice of Completion
EM-VER-156-211105 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 85 Plainfield Road, West Haven, Connecticut. Mount Analysis Decision Extension Request and Council Approval Notice of Construction Commencement Notice of Construction Completion
TS-DISH-156-211112 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Town Letter Decision Notice of Completion
TS-DISH-156-220407 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 204 Burwell Road, West Haven, Connecticut. Town Letter Decision Notice of Completion
EM-AT&T-156-220531 - AT&T notice of intent to modify an existing telecommunications facility located at 668 Jones Hill Road, West Haven, Connecticut. Structural Analysis Mount Analysis Decision Notice of Completion Condition Submission
EM-T-MOBILE-156-220622 - T-Mobile notice of intent to modify an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut. Decision Notice of Completion
EM-AT&T-156-220725 – AT&T notice of intent to modify an existing telecommunications facility located at 204 Burwell Road, West Haven, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Completion and Outstanding Condition Letter Condition Submission
EM-T-MOBILE-156-220801 – T-Mobile notice of intent to modify an existing telecommunications facility located at 85 Plainfield Avenue, West Haven, Connecticut. Decision Notice of Construction Completion
EM-VER-156-241129 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 24 Rockdale Road, West Haven, Connecticut. Decision