Town of Harwinton
DOCKET NO. 119 – SNET Cellular, Inc. application for a Certificate of Environmental Compatibility and Public Need for the construction, operation, and maintenance of cellular telephone towers and associated equipment in the Towns of Plymouth, Harwinton, Winchester, and New Milford, Connecticut. Dismissed.
DOCKET NO. 138 – SNET Cellular, Inc. application for a Certificate of Environmental Compatibility and Pubic Need for the construction, maintenance, and operation of cellular facilities in the Towns of Plymouth, Harwinton, Winchester, and New Milford, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
DOCKET NO. 466 – The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line. (Findings of Fact) (Opinion) (Decision and Order)
PETITION NO. 79 – Southern New England Telephone Company petition for the placement of microwave antennas on the roofs of existing buildings at 85 Main Street, Bristol, and 239 Prospect Street, Torrington, and on an existing telecommunications tower located on Wildcat Hill off Wildcat Hill Road in Harwinton. Staff Report Decision Approved 03/1/82
PETITION NO. 146 – Northeast Utilities Service Company petition for the proposed modification of the Canton to Weingart Road Junction 115-kV line in Canton, New Hartford, and Harwinton. Staff Report Approved 12/23/85
PETITION NO. 153 – The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton. Staff Report Approved 04/09/86
PETITION NO. 519 – Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to the Campville Substation to Weingart Road Junction 115-kV transmission line, Harwinton, Connecticut. Staff Report Approved 08/29/01
PETITION NO. 520 – Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconstruction of the Weingart Road Junction to Canton Substation 115-kV transmission line, Harwinton, New Hartford, and Canton, Connecticut. Staff Report Approved 08/29/01
SUB-PETITION NO. 1293-TH-01 (Thomaston-Harwinton) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion
SUB-PETITION NO. 1293 - HC-01 (Harwinton-Canton) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Request and Council Decision Notice of Construction Completion
PETITION NO. 1433 –The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1191 Line Rebuild Project, consisting of the replacement and reconductoring of electric transmission line structures along approximately 10 miles of its existing No. 1191 115-kilovolt (kV) single-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Frost Bridge Substation in Watertown and the existing Campville Substation in Harwinton, Connecticut, traversing Watertown, Thomaston, Litchfield and Harwinton, Connecticut, and related electric transmission line structure improvements. Approved 01/28/21
Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Weingart Rd., Harwinton; Moses Mountain, Danbury; Parker Rd. East Haddam; Guinea Rd., Monroe; Orange St., New Haven; Aspetuck Ave, New Milford; Willard Rd, Norwalk; North St., Plymouth; Valcom Rd., Tolland; Oakdale Ave., Winchester, Connecticut. Complete File
Omnipoint Communications notice of intent to modify an existing telecommunications facility located off of Wildcat Hill Road in Harwinton, Connecticut.
EM-CING-005-023-066-092-162-020711 – SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Barkhamsted, Canton, Harwinton, New Hartford, and Winchester, Connecticut. (150 Weingart Rd., Harwinton)