Environmental Monitor

May 2, 2017

  1.   Removal of United Pond Dam and City Pond Dam, Griswold
  2.   Bunker Hill Water Main Extension, Watertown
  3.   NEW! East Side Pressure Zone Improvements, Southington
  4.   NEW! Decommission of  Route 7 Wastewater Treatment Facility and Construction of New Pump Station and Force Main to South St. Wastewater Treatment Facility, Ridgefield
 
     No Post-Scoping Notice was submitted for publication in this edition.
 
  1.   Public Hearings for the EIE for Tree Obstruction Removal at Hartford Brainard Airport
  2.   State Office Building Redevelopment, Hartford
 
     No proposed land transfer has been submitted for publication in this edition.
 
The next edition of the Environmental Monitor will be published on May 16, 2017.
 
Subscribe to e-alerts to receive an e-mail when the Environmental Monitor is published.
 
Notices in the Environmental Monitor are written by the sponsoring agencies and are published unedited. Questions about the content of any notice should be directed to the sponsoring agency.

Scoping Notices

"Scoping" is for projects in the earliest stages of planning.  At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist.  Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study.  Send your comments to the contact person listed for the project by the date indicated.

 The Following Scoping Notice has been submitted for review and comment.

1. Notice of Scoping for United Pond Dam and City Pond Dam Removal
Municipality where proposed project might be located: Griswold

Address of Project Location: Dams are located on the Pachaug River in Jewett City at Slater Road and the intersection of Water Avenue.

Project Description: United Pond Dam (aka Lower Slater Pond) and City Pond Dam (aka Upper Slater Mill Pond) are run of the river dams on the Pachaug River.  United Pond Dam is a concrete dam with concrete face, 120 feet long and 8.8 feet high. The spillway is 78 feet long and 3.2 feet high. City Pond Dam is an earthen embankment dam 200 feet long and 28 feet high with a spillway that is 110 feet long with a stone masonry vertical face.

It is the goal of the Department to remove the dams in order to eliminate a public safety risk and eliminate another migratory barrier to diadromous fish by restoring a stretch of free-flowing river.  Contaminated sediments in the impoundment will be identified and excavated prior to dam removal.

Project objectives include:

  • Eliminate a public safety risk
  • Eliminate a migratory barrier to diadromous fish
  • Remove contaminated sediment from the river to eliminate exposure hazard to recreationalists and downstream residents (in the event of dam failure) and strengthen the long-term resiliency of the aquatic organisms
  • Restore natural riverine functions (e.g. sediment transport, restoration of floodplain functions and values, maintenance of normal thermal regimes, re-establishment of natural riverine vegetative communities).

Project Maps:  View a map of the project location.
                          View pictures of the dams.

Written comments from the public are welcomed and will be accepted until the close of business on:  May 4, 2017.

Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Energy & Environmental Protection will schedule a Public Scoping Meeting.  Such requests must be made by April 17, 2017. 

Written comments and/or requests for a Public Scoping Meeting should be sent to:

Name: Dan Biron
Agency: Department of Energy & Environmental Protection
Water Management and Planning Division
Address: 79 Elm Street
Hartford, CT 06106-5127
Phone: 860-424-3892
Fax: 860-424-4067
E-Mail: dan.biron@ct.gov

If you have questions about a public meeting, or other questions about the project or scoping, contact Mr. Biron as directed above.

The Connecticut Department of Energy and Environmental Protection is an Affirmative Action/Equal Opportunity Employer that is committed to complying with the requirements of the Americans with Disabilities Act.  Any person with a disability who may need a communication aid or service may contact the agency's ADA Coordinator at 860-424-3194 or at deep.hrmed@ct.gov.  Any person with limited proficiency in English, who may need information in another language, may contact the agency's Title VI Coordinator at 860-424-3035 or at deep.aaoffice@ct.gov.  ADA or Title VI discrimination complaints may be filed with DEEP’s EEO Manager at (860) 424-3035 or at deep.aaoffice@ct.gov.


2. Notice of Scoping for Bunker Hill Water Main Extension

Municipality where proposed project might be located: Watertown

Addresses of Possible Project LocationsConcord Drive, Cornwall Drive, Lake Winnemaug, and Farmdale Road & Barnes Road

Project Description: The Town of Watertown is proposing a water main extension project to serve the residential homes located in four areas including the Concord Drive area, the Cornwall Drive area, the Lake Winnemaug area, and the Farmdale and Barnes Road area. The entire project is proposed to be undertaken in four phases. Phase 1 includes the Concord Drive Area as shown in the map accompanying this notice of scoping. This water main extension project is supported in the most recent Water Supply Plan approved by the DPH.

A number of private wells in the project area were identified in the Preliminary Engineering Report (PER) as having drinking water that contains E. Coli., coliform bacteria, and traces of Methyl Teriary Butyl Ether. In addition, the levels of turbidity, color, pH, iron and hardness of the well water do not conform to the acceptable limits established in State Drinking Water Quality Standards. Records provided by the Torrington Area Health District (TAHD) indicate that numerous houses have Leaking Underground Storage Tanks. There are several wells located around the Lake Winnemaug area that do not conform to the sanitary separation distances to probable sources of contamination  established in Section 19-13-B51d of the Public Health Code. In response to inquiries by Watertown Water and Sewer staff, area residents reported water quantity issues during the summer of 2016 including low recharge rates and periods of loss of water.  As noted in the letter dated July 14, 2014  from the TAHD, the proposed water main extension is being supported by the health district.

This water quality deterioration has been attributed to substandard septic systems installed on small lots with shallow bedrock, poor quality soils and seasonal high ground water as documented by TAHD.  The recommended action in the PER is to extend a water main to the project area to provide a safe and adequate drinking water supply and allow the homeowners to properly abandon the on-site private wells. The Town is also extending its existing sewer system to serve the project area.  The DEEP published a Notice of Scoping for the first phase of the sewer expansion on February 7, 2017.  The DPH has been communicating with the DEEP in regards to coordinating the two projects.

The PER identifies several options to resolve the water quality and quantity issues that include redevelopment of existing wells (hydrofracking), deepening of wells, individual treatment installation (point of use), and installation of a stand-alone community water system. Because of the area’s proximity to centralized public water infrastructure, the alternative of extending public water mains and abandoning the on-site drinking water wells was determined to be the most economical action to achieve the desired public health benefit.

Watertown is currently seeking financial assistance under the Drinking Water State Revolving Fund (DWSRF) program to cover the project cost for the extension of water main to serve Concord Drive area. Approximately 89 residential homes currently served by private wells with water quality and quantity issues will receive safe and adequate drinking water.  The proposed Concord Drive area water main extension project will comprise of installation of new water main that will be connected to the existing distribution main of the Watertown Water and Sewer Authority located near the intersection of Bunker Hill Road and Davis Street Extension. The new main will run southwest along Bunker Hill Road and branch to Revere Drive and Mystic Lane. The 12-inch diameter pipe will be installed along Bunker Hill Road while 8-inch diameter pipe will be used along the secondary roads (Revere Drive, Mystic Lane, Concord Drive, and Lexington Drive). The water main has been minimally sized to provide adequate domestic water supply and satisfy fire protection requirements specified by the Town Fire Marshall for all 4 phases of the project.

Project Map:  Click here to view a map of the project area.

Written comments from the public are welcomed and will be accepted until the close of business on:  May 5, 2017.

Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a Public Scoping Meeting.  Such requests must be made by April 14, 2017.

Written comments and/or requests for a Public Scoping Meeting should be sent to

  Mr. Eric McPhee

Department of Public Health
Drinking Water Section

  

410 Capitol Avenue, MS #12DWS
PO Box 340308
Hartford, CT 06134-0308

Fax: 860-509-7359
E-Mail: DPH.SourceProtection@ct.gov

If you have questions about the public meeting, or other questions about the scoping for this project, contact:

Patricia Bisacky
Department of Public Health
Drinking Water Section
  

410 Capitol Avenue, MS #12DWS
PO Box 340308
Hartford, CT 06134-0308

Phone: 860-509-7333
Fax: 860-509-7359
E-Mail: Patricia.Bisacky@ct.gov

 
3. Notice of Scoping for East Side Pressure Zone Improvements
Municipality where proposed project might be located: Southington

Address of Possible Project Location: Flanders Road

Project Description:  The Southington Water Department (SWD) proposes to install 1,350 feet of 12 inch water main in Flanders Road and Pattonwood Drive as part of the first phase of a pipe looping project proposed as additional work to the East Side Storage Tank and Pump Station project.  The Scoping Notice for the East Side Storage Tank and Pump Station Project was originally published in the Environmental Monitor on January 20, 2015 and a Post-Scoping Notice was published on March 17, 2015. This looping project, when completed, will eliminate a dead-end water main on Flanders Road. 

Southington is proposing to construct 4,800 feet of new water main in phases to create a loop to connect the Flanders Road main to the main on Shuttle Meadow Road.  This loop would connect the East Side Pressure Zone to the West Queen Street pressure zone.  The loop would improve Southington’s water system in the following ways:

  • Eliminate the dead end and associated water quality concerns on Flanders Road by allowing water to cycle back down to the West Queen Street pressure Zone
  • Eliminate the need for flushing at the end of Flanders Road
  • Provide redundancy to backfeed the West Queen Street pressure zone from the East Side Pressure Zone in the event of a water main break or other emergency

Project Map:  Click here to view a map of the project area.

Written comments from the public are welcomed and will be accepted until the close of business on:  June 2, 2017.
 
 
Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a Public Scoping Meeting.  Such requests must be made by May 12, 2017.
 
 
Written comments and/or requests for a Public Scoping Meeting should be sent to

 

Mr. Eric McPhee
Department of Public Health
Drinking Water Section
  
410 Capitol Avenue, MS #12DWS
PO Box 340308
Hartford, CT 06134-0308
Fax: 860-509-7359
E-Mail: DPH.SourceProtection@ct.gov
 
If you have questions about the public meeting, or other questions about the scoping for this project, contact:

 

Ms. Patricia Bisacky
Department of Public Health
Drinking Water Section
 
410 Capitol Avenue, MS #12DWS
PO Box 340308
Hartford, CT 06134-0308
Phone: 860-509-7333
Fax: 860-509-7359
E-Mail: Patricia.Bisacky@ct.gov

 4. Notice of Scoping for Ridgefield Route 7 Wastewater Treatment Facility Decommission and Construction of new Pump Station & Force Main to South Street Wastewater Treatment Facility

Municipality where proposed project would be located: Ridgefield, CT

Address of Project Location:  South Street Plant: 22 South Street.  Route 7 Plant:  9101 Ethan Allen Highway (Route 7).

Project Description: The Phase 1 and Phase 2 Wastewater Facilities Plan for the Town of Ridgefield, Connecticut proposes reconfiguration of the town’s wastewater treatment infrastructure.  The project is being undertaken to address aging and worn equipment and structures at the Town’s two treatment facilities that are reaching the end of their service life, as well as new, more stringent effluent limits.  The Town is proposing to decommission the smaller of two wastewater treatment facilities (Route 7 Wastewater Treatment Facility) and consolidate treatment operations to the other larger facility (South Street Wastewater Treatment Facility). This involves the demolition of the decommissioned facility, and installation of a force main and pump station to convey flow from the smaller facility to the larger facility.  The facilities plan also includes the potential to expand the South Street WWTF sewer service area by approximately 90 acres and approximately 126 parcels based on an assessment of potential future sewer needs to address public health concerns with two areas of existing development.  The South Street facility treatment processes would be upgraded to comply with the anticipated facility effluent limits, as well as to handle the flow from the decommissioned facility and potential additional sewered areas.  The anticipated effluent limits for the upgraded facility are based on the facilities existing NPDES permit and direction from the CT DEEP that some effluent limits will be more stringent to account for the additional flow.

Ridgefield is currently seeking financial assistance under the Clean Water Fund (CWF) program to cover the project cost for the pump station and force main. The Route 7 Pump Station and force main would qualify for the 20% water pollution control grant for eligible cost since they can be viewed as treatment elements due to the fact that they are an alternative to upgrading the Route 7 WWTF. This would result in improved treatment of the wastewater from Sewer District No. 2 as the South Street WWTF would produce an effluent of higher quality.

Two force main alternatives between the new Route 7 Pump Station to the South Street WWTF were developed and evaluated. The proposed alternative routes are: Alternative 1- Existing Route 7 WWTF Force Main, Cross Country by the Water Tank, Route 35 “Route 35 Route”, and Alternative 2- Route 7, Haviland Road, Limekiln Road, Lee Road, Farmingville Road Route “Local Road Route”. The final route has yet to chosen and is still under review. Construction is anticipated to begin in the Spring 2019 and be complete by Fall of 2021. Due to the increased hydraulic capacity to the South Street WWTF, an EIE is warranted and is currently in the process of being drafted.

Project Map:  View a location map of the Force Main Alternatives.  View a site plan of the Proposed Route 7 Pump Station.

Written comments from the public are welcomed and will be accepted until the close of business on:  June 1, 2017.

Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Environmental Protection will schedule a Public Scoping Meeting. Such requests must be made by May 12, 2017.

Written comments and/or requests for a Public Scoping Meeting should be sent to:

Maxwell Fan
Department of Energy & Environmental Protection
Bureau of Water Protection and Land Reuse
Address: 79 Elm St. Hartford CT 06106-5127
Phone:
(860) 424-3670
Fax: (860) 424-4067
E-Mail: maxwell.fan@ct.gov

If you have questions about a public meeting, or other questions about the scoping for this project, contact Mr. Fan as directed above. 

The agency expects to release an Environmental Impact Evaluation for this project, for public review and comment later this year.


 
Post-Scoping Notices: Environmental Impact Evaluation Not Required
 
This category is required by the October 2010 revision of the Generic Environmental Classification Document for State Agencies. A notice is published here if the sponsoring agency, after publication of a scoping notice and consideration of comments received, has determined that an Environmental Impact Evaluation (EIE) does not need to be prepared for the proposed project.

 


No Post-Scoping Notices have been submitted for publication in this edition.


 

After Scoping, an agency that wishes to undertake an action that could significantly affect the environment must produce, for public review and comment, a detailed written evaluation of the expected environmental impacts. This is called an Environmental Impact Evaluation (EIE).

 


The Following EIE Notices have been submitted for publication in this edition.

1. Notice of Public Hearings for
Environmental Impact Evaluation and Environmental Assessment
Re: Tree Obstruction Removal at Hartford-Brainard Airport

Municipality where project is proposed: The Harford-Brainard Airport is located in the City of Hartford approximately two miles southeast of Downtown Hartford, CT.

Address of possible Project Location: The Airport office is located at 251 Maxim Road, just east of Interstate 91 and west of the Connecticut River.

Project DescriptionPreparation of National Environmental Policy Act (NEPA) and Connecticut Environmental Policy Act (CEPA) environmental documents as required to evaluate the potential impacts associated with tree obstruction removal in areas on, as well as north, south, east and west of the Hartford-Brainard Airport. The evaluation addresses obstruction removals associated with Federally-defined airspace surfaces surrounding the airport needed for the continued safe operation of aircraft.  Objects that penetrate these surfaces are classified as obstructions, and should be removed to safely accommodate approaching and departing aircraft.

The project sponsoring agencies, the Connecticut Airport Authority (CAA) and the Federal Aviation Administration (FAA), have identified that trees penetrate the airspace at the Airport, including locations beyond the southern airport property boundary.  Per FAA and CAA practice, review of off-airport obstruction removal should be evaluated and documented via a NEPA Environmental Assessment (EA) and State CEPA Environmental Impact Evaluation (EIE). This project includes the identification of each affected property owner and associated parcels (both public and private) with anticipated obstruction removals.

The Connecticut Airport Authority (CAA) will be holding three (3) Public Hearings on the Hartford-Brainard Airport draft Federal Environmental Assessment (EA) and State Environmental Impact Evaluation (EIE) for Tree Clearing. At these meetings, information on the overall project and the study’s findings, including the Preferred Alternative, will be presented. The doors for all meetings will open at 6:30 PM with each public hearing beginning at 7:00 PM.

Public Hearings will be held at the following locations on the specified dates:

Meeting 1- Hartford:

Tuesday, April 18, 2017

Bulkeley High School (300 Wethersfield Ave., Hartford, CT 06114)

Meeting 2- Glastonbury:

Wednesday, April 19, 2017

Glastonbury Town Hall, Council Chambers (2155 Main St., Glastonbury, CT 06033)

Meeting 3-Wethersfield:

Thursday, April 27, 2017

Wethersfield Town Hall (505 Silas Deane Hwy., Wethersfield, CT 06109)

NOTES:  Free language assistance or sign interpretation may be requested by contacting Colin Goegel at the address below at least five (5) business days prior to the meeting. Efforts will be made to respond to requests for assistance.

The public can view a copy of the draft EIE/EA on the project website at:  http://hartfordairport.caa-analysis.com/, and at the following locations:

Hartford Public Library

500 Main Street

Hartford, CT  06103

Wethersfield Public Library

515 Silas Deane Hwy

Wethersfield, CT  06109

East Hartford Public Library

840 Main Street

East Hartford, CT  06108

Welles-Turner Memorial Library

2407 Main Street

Glastonbury, CT  06033

Send your comments or questions about the draft EIE/EA: 1) via the project website listed above, or 2) to Mr. Colin Goegel at the mailing address or e-mail below:

Name:      Mr. Colin Goegel, Supervising Engineer

Agency:    Connecticut Airport Authority

                  334 Ella Grasso Turnpike, Suite 160

                  Windsor Locks, CT  06096

Phone:      (860) 254-5628

E-Mail:     cgoegel@ctairports.org

Comments on the draft EIE/EA will be accepted until the close of business on:

Monday, May 22, 2017.


2. Notice of EIE forState Office Building Redevelopment (BI-2B-381)

Municipality where project is proposed: Hartford

Address of Possible Project Location(s): 165 Capitol Avenue and 309 Buckingham Street, Hartford

Project Description: The Proposed Action is related to the long range planning strategy aimed at reducing the quantity of leased office facilities for State employees by maximizing the utilization of State owned properties.  The Proposed Action encompasses the following elements:
  • A complete interior renovation of the existing 321,493 gross square foot State Office Building (SOB) which was built in 1931, restoration and renovation of the building exterior, renovation of the central exterior courtyard, and reconfiguration of the existing building entrances.   Site work includes the creation of a landscaped plaza, redevelopment of existing perimeter streetscape and redevelopment of the existing surface parking lot.  The renovation would support a similar number of employees (approximately 900) as the current use.
  • Demolition of the existing 450-car parking structure and the 309 Buckingham Trade ("maintenance") Shop located at the corner of Washington and Buckingham Streets,* with construction of an approximate new 1,050-space parking structure.  An option under consideration is to provide retail space along Washington Street as part of the overall parking structure.  The remaining green space at the corner of Washington and Buckingham Streets would be a landscaped park-like area.
* Note: a separate Initial Environmental Review (3/1/2017) was prepared for the demolition of the maintenance building and the parking garage and subsequently a Record of Environmental Consideration (3/2/2017) was prepared for the demolition portions of the project, since it was determined that these actions did not warrant further CEPA review and have been eliminated from further study in the EIE per CEPA Regulation Section 22a-1a-7(c).

Project Map(s):  Click here to view the general location (1.1 MB).  Click here to view a figure of the project area (6.1 MB). Click here to view the site plan(213 KB)

Comments on this EIE will be accepted until the close of business on: June 2, 2017

The public can view a copy of this EIE at: online by clicking here; or view a hard copy at the following locations: Hartford Public Library (500 Main Street, Hartford); Hartford Town and City Clerk’s Office (550 Main Street, Hartford); and DAS (450 Columbus Blvd. Suite 1305, Hartford, CT).

No public hearing is scheduled for this EIE.  A public hearing request must be made by twenty-five persons or an association having not less than twenty-five persons.  Such requests must be made by the close of business on and no later than April 28, 2017 by 5:00 pm.

Send your comments about this EIE to:

Name: Jeff Bolton, Supervising Environmental Analyst
Agency: Department of Administrative Services
Address: 450 Columbus Blvd., Suite 1305, Hartford, Connecticut 06103
E-Mail: Jeffrey.bolton@ct.gov
If you have questions about requesting a public hearing, or where you can review this EIE, or similar matters, please contact:
Name: Jeff Bolton, Supervising Environmental Analyst
Agency: Department of Administrative Services
Address: 450 Columbus Blvd., Suite 1305, Hartford, Connecticut 06103
E-Mail: Jeffrey.bolton@ct.gov
Phone: 860-713-5706

State Land Transfer Notices
 
Connecticut General Statutes Section 4b-47 requires public notice of most proposed sales and transfers of state-owned lands. The public has an opportunity to comment on any such proposed transfer. Each notice includes an address where comments should be sent. Read more about the process.

 


No Land Transfer Notice has been submitted for publication in this edition.


 
The Adobe Reader is necessary to view and print Adobe Acrobat documents, including some of the maps and illustrations that are linked to this publication. If you have an outdated version of Adobe Reader, it might cause pictures to display incompletely. To download up-to-date versions of the free software, click on the Get Acrobat button, below. This link will also provide information and instructions for downloading and installing the reader.

Button - Get Adobe Reader Download the free Acrobat Reader!Access.Adobe is a tool that allows blind and visually impaired users to read any documents in Adobe PDF format.  For more information, read the product overview at Adobe.com.