DEEP headquarters at 79 Elm Street in Hartford is currently closed due to recent water damage impacting multiple areas of the building. We are working to remediate the situation and get the building back open to staff and the public as soon as possible. While the building is closed, Staff continue to work either remotely or in alternate locations. We continue to be able to receive documents via U.S. Mail or courier service, and our electronic file submittal protocols remain unchanged. For updates, please click here

Proposed Individual Permits

The public notices in this section are provided as a convenience to the public. The official legal notice has been published in accordance with the requirements of all applicable laws.

When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.

If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.

Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.

Page 11 of 12

  • Hillandale Farms Conn LLC, Franklin

    Notice of tentative determination to approve an application for a permit renewal submitted by Hillandale Farms to discharge a maximum of 20,000 gallons per day of wastewater generated from cleaning disinfecting, and packaging chicken eggs to the groundwaters in the Beaver Brook watershed from operations at the company’s three egg washing facilities located in Bozarh, Lebanon, and Franklin. Written comments due by January 2, 2025.

    Date Posted: 12/2/2024

  • Town of East Windsor

    Notice of tentative determination to approve an application submitted by Town of East Windsor for a Dam Safety Permit . Intent to waive public hearing. Written comment due by December 27, 2024.

    Date Posted: 11/27/2024

  • Town of Guilford Public Schools

    Notice of tentative determination to approve an application for a permit renewal submitted by The Town of Guilford Public Schools to discharge a maximum of 4700 gallons per day of treated domestic sewage to the groundwater in the West River watershed from the operations of an elementary school. Written comments due by December 26, 2024.

    Date Posted: 11/26/2024

  • Sprague Operating Resources, LLC, Bridgeport, CT

    Notice of tentative determination to approve an application submitted by Sprague Operating Resources, LLC for a Title V permit renewal at the Bridgeport Terminal. Written comments are due by December 15, 2024.

    Date Posted: 11/15/2024

  • Robert A. Glass, Westbrook

    Notice of tentative determination to approve an application submitted by Robert Glass for proposed activity that includes modifying an existing and authorized dock to the final configuration of a 221.2’ long x 3’ wide fixed wooden pier, 24’ long x 3’ wide aluminum ramp, and a 28’ x 6’ floating dock for residential boating use. This activity will affect coastal resources and tidal wetlands. Written comments due by December 24, 2024.

    Date Posted: 11/14/2024

  • John M. Ciuffo, Stamford

    Notice of tentative determination to approve an application submitted by John M. Cuiffo for proposed activity that includes modifying an existing dock. This activity will affect coastal resources. Written comments due by December 14, 2024.

    Date Posted: 11/14/2024

  • University of Connecticut, Mansfield

    Notice of tentative determination to approve an application submitted by University of Connecticut for a Dam Safety permit. Intent to waive public hearing. Written comments due by December 7, 2024.

    Date Posted: 11/7/2024

  • Christopher Errato, Milford

    Notice of tentative determination to approve an application submitted by Christopher Errato for proposed activity that includes constructing a shared residential dock. This activity will affect tidal wetlands. Written comments due by December 10, 2024.

    Date Posted: 10/31/2024

  • David Jerel and Jean Ann Green, Branford

    Notice of tentative determination to approve an application submitted by David Jerel and Jean Ann Green for proposed activity that includes installation of a dock and boat lift. This activity will affect coastal resources and tidal wetlands. Written comments due by December 9, 2024.

    Date Posted: 10/30/2024

  • Gino C. Bottino, Norwalk

    Notice of tentative determination to approve an application submitted by Gino C. Bottino for proposed activity that includes removal of existing structures and installation of a dock. This activity will affect coastal resources, aquatic resources, and tidal wetlands. Written comments due by December 9, 2024.

    Date Posted: 10/29/2024

  • Flanders Run Association Inc., East Lyme

    Notice of tentative determination to approve an application for a permit renewal submitted by Flanders Run Association, Inc. to discharge a maximum of 10,800 gallons per day of treated domestic sewage to the ground water in the Pattagansett River Watershed from a condominium complex. Written comments due by September 2, 2024.

    Date Posted: 8/2/2024

  • Reworld Bristol, Inc.

    Notice of tentative determination for combined Waste and Air applications submitted by ReWorld Bristol, Inc. for a modification and renewal of permit to operate and establishment of a Biomedical Waste Treatment Facility and minor modifications to New Source Review permits for MWC Unit #1 and Unit #2. Written comments are due on August 4, 2024.

    Date Posted: 7/5/2024

  • Connecticut Light and Power d/b/a Eversource Energy, Norwalk

    Notice of public hearing for an application submitted by Connecticut Light and Power Company d/b/a Eversource Energy. A virtual public hearing will be held on May 29, 2024 at 6:30 PM via Zoom. Written comments are due by June 5, 2024.

    Date Posted: 4/26/2024

  • The Connecticut Light and Power Company, d/b/a Eversource Energy, Norwalk

    Notice of tentative determination to approve an application submitted by The Connecticut Light and Power Company d/b/a Eversource Energy for proposed activity that includes relocation of twin 115kV transmission lines from monopoles and catenaries on the Norwalk Walk Bridge into two parallel conduits beneath the Norwalk River to be constructed using horizontal directional drilling. This activity may affect coastal and aquatic resources and tidal wetlands. Written comments due by April 15, 2024.

    Date Posted: 3/6/2024

  • Iain Gillespie, Stratford

    Notice of tentative determination to approve an application submitted by Iain Gillespie for proposed activity that includes constructing a residential dock consisting of a 4’ x 348’-8” pier supported by (48) 8” piles and (12) 12” piles, a 3’ x 38’ gangway, a 6’ x 21’ float, a 5’ x 6’ landing float, and (4) 12” float restraint piles. This activity will affect coastal resources and tidal wetlands. Written comments due by July 13, 2023.

    Date Posted: 6/13/2023