Proposed General Permits
When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.
If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.
Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.
Page 1 of 1
-
General Permit for the Discharge of Swimming Pool Wastewater to Waters of the State
Notice of Tentative Decision Intent to Reissue a General Permit for the discharge of Swimming Pool Wastewater to the Waters of the State. Written comments due by March 10, 2024.
Date Posted: 2/10/2024
-
Notice of Public Listening Session for the General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems. Virtual public listening session will be held on January 25, 2024. Written comments due by February 24, 2024.
Date Posted: 12/21/2023
-
Notice of tentative determination to reissue the General Permit of Stormwater from Connecticut Department of Transportation Separate Storm Sewer Systems. Written comments due by January 21, 2024.
Date Posted: 12/21/2023
-
Public Listening Session for the General Permit for Discharges from Miscellaneous Industrial Users
Notice of Public Listening Session for the General Permit for Discharges from Miscellaneous Industrial Users. Virtual public listening session will be held on January 16, 2024. Written comments due by February 15, 2024.
Date Posted: 12/6/2023
-
Notice of Public Listening Session for the General Permit for the Discharge of Wastewaters from Significant Industrial Users. Virtual public listening session will be held on January 10, 2023. Written comments due by February 9, 2023.
Date Posted: 12/6/2023
-
Notice of Intent to Renew the General Permit for a Municipal Transfer Station
Date Posted: 12/1/2022