Proposed General Permits
When available, supporting documents (draft permits, etc.) are formatted as Adobe PDF files and can be read online or downloaded for printing.
If there are no public notices currently available in a proposed action category (SIP Revisions, General Permits, Individual Permits, Miscellaneous, Adjacent States) that category will not display.
Note: Notices of Proposed Regulations can be viewed on the Connecticut eRegulations website.
Page 2 of 4
-
Notice of Public Listening Session for the General Permit for the Discharge of Stormwater and Dewatering Wastewaters from Construction Activities. Public listening Session will take place on January 9, 2025. Written comments by January 23, 2025.
Date Posted: 12/10/2024
-
General Permit for In Situ Groundwater Remediation Chemical Oxidation Renewal
Notice of tentative determination has been reached to renew the General Permit for In Situ Groundwater Remediation: Chemical Oxidation. Written comments are due by December 19, 2024.
Date Posted: 11/19/2024
-
Notice of tentative determination has been reached to issue a General Permit to Act as a Contractor to Contain or Remove or Otherwise Mitigate the Effects of Certain Releases. Written comments due by December 14, 2024.
Date Posted: 11/14/2024
-
Notice of Public Listening Session for the General Permit for Discharges from Miscellaneous Industrial Users. Public Listening session will be held on December 4, 2024. Written comments by December 31, 2024.
Date Posted: 10/29/2024
-
Public Listening Session for the Significant Industrial User General Permit
Notice of Public Listening Session for the Significant Industrial User General Permit for Discharges to Publicly Owned Treatment Works. Public listening session held on November 21, 2024. Written comments due by December 12, 2024.
Date Posted: 10/17/2024
-
Comprehensive General Permit for Discharges to Surface and Groundwater
Notice of tentative determination of intent to reissue the Comprehensive General Permit for Discharges to Surface and Ground Water. Written comments are due by October 18, 2024.
Date Posted: 9/18/2024
-
General Permit for the Discharge of Dewatering and Remediation Wastewaters
Notice of Tentative Determination of Intent to Reissue the General Permit for the Discharge of Dewatering and Remediation Wastewaters. Written comments are due by September 28, 2024.
Date Posted: 8/28/2024
-
Notice of Informational Public Hearing for Point Source Discharges to Waters of the State from the Application of Pesticides. Informational Public Hearing will be held on July 16, 2024. Written comments due by July 23, 2024.
Date Posted: 6/10/2024
-
General Permit for Point Source Discharges to Waters of the State from the Application of Pesticides
Notice of tentative determination to reissue a General Permit for Point Source Discharges to Waters of the State from the Application of Pesticides. Written comments due by May 19, 2024.
Date Posted: 4/19/2024
-
General Permit for Water Resources Construction Activities, Statewide
Notice of intent to reissue and modify the General Permit for Water Resources Construction Activities. This general permit is limited to any proposed regulated activity conducted by any department, agency, or instrumentality of the state, except any local or regional board of education. Written comments are due by May 11, 2024.
Date Posted: 4/11/2024
-
General Permit for the Discharge of Stormwater Associated with Industrial Activities
Notice of tentative determination of intent to Reissue the General Permit for the Discharge of Stormwater Associated with Industrial Activities. Written comments due by May 10, 2024.
Date Posted: 3/26/2024
-
Notice of Public Listening Session for the General Permit for the Discharge of Dewatering and Remediation Wastewaters to Surface Waters. Written comments due by May 25, 2024.
Date Posted: 3/21/2024
-
General Permit for the Discharge of Swimming Pool Wastewater to Waters of the State
Notice of Tentative Decision Intent to Reissue a General Permit for the discharge of Swimming Pool Wastewater to the Waters of the State. Written comments due by March 10, 2024.
Date Posted: 2/10/2024
-
Notice of Public Listening Session for the General Permit for the Discharge of Stormwater from Small Municipal Separate Storm Sewer Systems. Virtual public listening session will be held on January 25, 2024. Written comments due by February 24, 2024.
Date Posted: 12/21/2023
-
Notice of tentative determination to reissue the General Permit of Stormwater from Connecticut Department of Transportation Separate Storm Sewer Systems. Written comments due by January 21, 2024.
Date Posted: 12/21/2023