THOMASTON

DOCKET NO. 92 - Envirite Corporation application for modifications to a hazardous waste facility located in Thomaston. Withdrawn

DOCKET NO. 466 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Frost Bridge to Campville 115-kilovolt (kV) electric transmission line project that traverses the municipalities of Watertown, Thomaston, Litchfield, and Harwinton, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 10.4 miles between Eversource’s existing Frost Bridge Substation in the Town of Watertown and existing Campville Substation in the Town of Harwinton; (b) related modifications to Frost Bridge Substation and Campville Substation; and (c) reconfiguration of a 0.4 mile segment of two existing 115-kV electric transmission lines across the Naugatuck River in the Towns of Litchfield and Harwinton within the same existing right-of-way as the new 115-kV electric transmission line. (Findings of Fact), (Opinion), (Decision and Order)

PETITION NO. 153 - The Connecticut Light and Power Company petition for modification of the Frost Bridge-Campville 115-kV line in Watertown, Thomaston, Litchfield, and Harwinton. Staff Report.  Approved 4/9/86

PETITION NO. 156HW - Envirite Corporation petition to place new tanks and new equipment, construct new waste pits and add temporary container storage. Staff Report.  Partial Approval 4/9/86

PETITION NO. 181HW - Envirite Corporation petition for proposed addition of a new pump, five new tanks, and an increase in floor space. Staff Report.  Approved 5/13/87

PETITION NO. 186 - Connecticut Light and Power Company petition for proposed modifications to the Thomaston 2B Substation. Staff Report.  Approved 6/19/87

PETITION NO. 277 - The Connecticut Light and Power Company petition for the removal of unused 69-kV lattice steel towers along nine miles of right-of-way in Thomaston and Litchfield. Staff Report.  Approved 11/20/91

PETITION NO. 332HW - Envirite Corporation petition for certain changes at its existing facility located at 187 Old Waterbury Road in Thomaston. Staff Report.  Approved 11/1/94

SUBPETITION NO. 1293-TH-01 (Thomaston-Harwinton) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. DecisionCompletion Letter

SUBPETITION NO. 1293-TH-02 (Thomaston) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Completion Letter

SUB-PETITION NO. 1293-TPB-01 (Thomaston-Plymouth-Bristol) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. DecisionCompletion

PETITION NO. 1433 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1191 Line Rebuild Project, consisting of the replacement and reconductoring of electric transmission line structures along approximately 10 miles of its existing No. 1191 115-kilovolt (kV) single-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Frost Bridge Substation in Watertown and the existing Campville Substation in Harwinton, Connecticut, traversing Watertown, Thomaston, Litchfield and Harwinton, Connecticut, and related electric transmission line structure improvements.  Approved 01/28/21

PETITION NO. 1577 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Frost Bridge to Noera Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 5 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1163 and 1550 Lines between Frost Bridge Substation in Watertown to Noera Substation in Waterbury, traversing the municipalities of Watertown, Thomaston, Plymouth and Waterbury,Connecticut, and related electric transmission line and substation improvements. Approved 08/31/23

TS-SPRINT-140-030409 - Sprint Spectrum, L.P. d/b/a Sprint PCS request for an order to approve tower sharing for the replacement of an existing facility located on Chapel Street, Thomaston, Connecticut.

EM-VER-140-031105 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street in Thomaston, Connecticut.
EM-CING-140-051019 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.
 
EM-VER-140-080207 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.
 
EM-POCKET-140-090108 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.
 
EM-VER-140-120919 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.
 
EM-CING-140-121213 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.

 

EM-SPRINT-140-130724 – Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 583 Chapel Street, Thomaston, Connecticut.

 

EM-VER-140-140619Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.  Decision.

 

EM-T-MOBILE-140-141015 – T-Mobile notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.     DecisionCompletion Letter.

  

EM-SPRINT-140-141027Sprint PCS notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.  Decision.  Status Letter and CSC Response.

 

EM-AT&T-140-161028 - AT&T notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. DecisionCompletion

 

EM-SPRINT-140-170929 – Sprint notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. DecisionCompletion Letter

 

EM-AT&T-140-190123 - AT&T notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Decision  Completion Letter

 

EM-VER-140-190222 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Decision Notice of Completion

EM-T-MOBILE-140-200626 – T-Mobile notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Decision  Completion Letter

 

EM-CING-140-210304 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.  Decision Notice of Completion

 

TS-DISH-140-211015 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Town Letter  Decision  Notice of Completion

 

EM-T-MOBILE-140-211206 - T-Mobile notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut.  Decision  Notice of Completion

 

EM-AT&T-140-220525AT&T notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Decision  Notice of Completion

 

EM-VER-140-220801 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 580 Chapel Street, Thomaston, Connecticut. Incomplete Letter  Response to Incomplete and Council Acknowledgement Decision Notice of Cancellation