DOCKET NO. 5 - Connecticut Light and Power Company Certificate for a 245-kV transmission line and a 115-kV transmission line between points in New Milford and Bethel. (Brookfield) (Findings of Fact), (Opinion), (Concurring Opinion), and (Decision and Order).
DOCKET NO. 75 - SNET Cellular, Inc. Certificate for cellular telephone facilities in Brookfield (denied) and in Danbury and Newtown. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 134B - Amendment to the Iroquois Gas Transmission System, L.P. Certificate to construct, operate, and maintain an interstate natural gas transmission pipeline from Sherman to Milford and Long Island Sound. (Brookfield) (Findings of Fact), (Opinion), and (Decison and Order).
DOCKET NO. 467 - Homeland Towers, LLC and Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Brookfield Tax Assessor Map E10, Lot 014, 100 Pocono Road, Brookfield, Connecticut. Approved 10/13/16.
DOCKET NO. 468 - The Connecticut Light & Power Company d/b/a Eversource Energy application for a Certificate of Environmental Compatibility and Public Need for the Southwest Connecticut Reliability Project that traverses the municipalities of Bethel, Danbury, and Brookfield, which consists of (a) construction, maintenance and operation of a new 115-kV overhead electric transmission line entirely within existing Eversource right-of-way and associated facilities extending approximately 3.4 miles between Eversource’s existing Plumtree Substation in the Town of Bethel to its existing Brookfield Junction in the Town of Brookfield; (b) reconfiguration of two existing 115-kV double-circuit electric transmission lines at Eversource’s existing Stony Hill Substation in the Town of Brookfield; and (c) related substation modifications. (Findings of Fact), (Opinion), (Decision and Order).
DOCKET NO. 512 - Homeland Towers, LLC and New Cingular Wireless PCS, LLC d/b/a AT&T application for a Infra Towers, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 60 Vale Road, Brookfield, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)
PETITION NO. 9 - Northeast Utilities Service Company petition for relocating and replacing single circuit, double wood pole structures with single circuit, single load monopole structures along sections of an existing 69-kV transmission line near Gray’s Bridge Road, Brookfield and between Route 133 and Silvermine Road. Staff Report. Approved 12/1/72
PETITION NO. 11 - Connecticut Light and Power Company petition for reinsulating existing sections of 69-kV line from Brookfield Junction and from West Brookfield Junction northerly to the Rocky River hydro plant in New Milford. Staff Report. Approved 12/1/72
PETITION NO. 53 - Connecticut Light and Power Company petition for the installation of 115-kV transmission line conductor, line taps, and associated equipment on an existing lattice steel structure located at Stony Hill Substation, Stony Hill Road in Brookfield. Staff Report. Approved 3/13/80
PETITION NO. 191 - Northeast Utilities petition for a proposed modification of a mobile transformer position within the West Brookfield Substation. Staff Report. Approved 10/6/87 Rev. Approv. 3/22/88
PETITION NO. 233 - The Connecticut Light and Power Company petition for an addition to an existing 115-kV Substation on Stony Hill Road in Brookfield. Staff Report. Approved 5/15/89
PETITION NO. 266 - The Connecticut Light and Power Company petition for modifications to the Brookfield Junction to Stony Hill Substation 115-kV line. Staff Report. Approved 3/11/91
PETITION NO. 335 - Department of Public Safety, Division of State Police petition for the proposed replacement of an existing tower at 76 Tower Road in Brookfield. Staff Report. Denied 10/28/94
PETITION NO. 337 - The Connecticut Light and Power Company petition for modifications to existing 115-kV transmission lines at Stony Hill Substation in Brookfield. Staff Report. Approved 2/9/95
PETITION NO. 342 - Arlene Barra petition for a declaratory ruling regarding the Connecticut Siting Council’s acknowledgment of a notice of intent to modify an existing telecommunications tower and associated equipment at 76 Tower Road, Brookfield. Findings of Fact. Opinion. Withdrawn 11/14/95
PETITION NO. 493 - VoiceStream Wireless Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at Park Ridge Road, west of Hope Drive, Brookfield, Connecticut. Staff Report 1. Staff Report 2. Approved 12/14/00. Site plan revisions approved 10/17/01.
PETITION NO. 494 - Springwich Cellular Limited Partnership (SCLP) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric transmission facility located at 763 Federal Road (Route 7), South of Station Road, Brookfield, Connecticut. Staff Report Approved 11/30/00.
PETITION NO. 507 - Northeast Utilities Service Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for proposed installation of a 115-kV capacitor bank and associated equipment at the existing Connecticut Light and Power Company Stony Hill Substation, located on Stony Hill Road, Brookfield, Connecticut. Staff Report. Approved 5/10/01.
PETITION NO. 540 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of an existing Iroquois Pipeline by the Addition of a Natural Gas Compressor Station, located off High Meadow Road, Brookfield, CT. Approved 09/25/02. Decision. Opinion. Findings of Fact.
PETITION NO. 555 - Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing Iroquois Pipeline by Additions to a Natural Gas Compressor Station, located off High Meadow Road, Brookfield, Connecticut. Approved 09/25/02. (See Petition No. 540 above to view Findings of Fact, Opinion, and Decision and Order.)
PETITION NO. 580 – Sprint Spectrum L.P. d/b/a Sprint PCS Petition for a Declaratory Ruling that No Certificate of Environmental Compatibility and Public Need for the proposed modifications to a telecommunications facility located at 761 Federal Road in Brookfield, Connecticut. Staff Report. Approved 09/25/02.
PETITION NO. 588 - Sprint Spectrum L.P. d/b/a Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power (CL&P) transmission facility on Vale Road, Brookfield, Connecticut. Staff Report. Approved 10/23/02.
PETITION NO. 615E - Northeast Utilities, as agent for Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Stony Hill Substation, Brookfield, Connecticut. Staff Report. Approved 03/11/03.
PETITION NO. 616T - AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed construction of a telecommunications facility at 2 Huckleberry Hill Road, Brookfield, Connecticut. Staff Report. Approved 04/09/03.
PETITION NO. 645 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to re-establish CL&P’s access to structure number 2688, Brookfield Substation to Brookfield Junction 115-kV Line off Laurel Hill Road, Brookfield, Connecticut. Staff Report. Approved 10/14/03.
PETITION NO. 793 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light & Power Company 115-kV transmission line, Brookfield, Connecticut. Staff Report.Decision Letter. Approved 2/6/07.
PETITION NO. 815 – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling that the Connecticut Siting Council has an advisory role to the Federal Energy Regulatory Commission regarding Iroquois’s 08/09 expansion project in Brookfield, Newtown, and Milford, Connecticut. Findings of Fact.Opinion/Recommendations. Decided 11/29/07.
PETITION NO. 894 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing six CL&P Substations located at Tomac Avenue, Greenwich; 7 Prange Road, Brookfield; 52 Peaceable Street, Redding; 85 ½ Weston Road, Weston; 164 North Eagleville Road, Mansfield; and Roosevelt Avenue, Preston, Connecticut. Staff Report. Approved 05/07/09.
PETITION NO. 1230 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Stony Hill Substation including the installation of a new access road to the substation on Eversource’s property located at 49 Stony Hill Road, Brookfield, Connecticut. Approved 06/23/16.
PETITION NO. 1286 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed West Brookfield Reliability Project that includes reconductoring of approximately 1.4 miles of its existing No. 1887 115-kilovolt (kV) electric transmission line within existing Eversource electric transmission line right of way between the existing West Brookfield Substation located at 83 Prange Road and the existing West Brookfield Junction near Pocono Road in Brookfield, Connecticut, installation of two 14.4 Megavolt Ampere Reactive (MVAR) capacitor banks at the West Brookfield Substation located at 83 Prange Road, Brookfield, Connecticut and related substation and transmission line structure improvements. Approved 03/16/17.
SUB-PETITION NO. 1293-BS-02 (Brookfield-Southbury) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Completion
SUB-PETITION NO. 1293-BR-03 (Brookfield) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Extension Approval Request for Project Change and Council Project Change Decision Request for Additional Extension of Construction Time Request for Project Change and Council Project Change Decision Notice of Construction Completion
PETITION NO. 1399 – Iroquois Gas Transmission System, L.P. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and 16-50k, that modifications to its existing natural gas compressor stations located in the Towns of Brookfield and Milford, Connecticut (“Enhancement by Compression Project”) are under the exclusive jurisdiction of the Federal Energy Regulatory Commission.
PETITION NO. 1573 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Brookfield Junction to Bates Rock Substation Upgrade Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 6.7 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1887, 1268, and 1485 Lines between Brookfield Junction in Brookfield and Shepaug Substation in Newtown, and along approximately 0.5 mile of its existing electric transmission line right-of-way shared by its existing 115-kV Nos. 1622 and 1485 Lines between Shepaug Substation and Bates Rock Substation in Southbury, Connecticut traversing the municipalities of Brookfield, Newtown and Southbury, and related electric transmission line and substation improvements. Approved 08/03/23
BANM notice of intent to modify an existing telecommunications facility located off Carmen Hill Rd., Brookfield.
Charter Communications/Western Connecticut System notice of intent to modify an existing telecommunications facility located off Carmen Hill Rd., Brookfield.
The Dept. of Public Safety, Div. of State Police notice of intent to modify an existing telecommunications facility located at 76 Tower Rd., Brookfield.
EM-AT&T-005-018-031-055-068-092-111-125-153-162-168-011121 - Edwards and Kelcey on behalf of AT&T Wireless notice of intent to modify existing telecommunications facilities located at twelve sites throughout the State of Connecticut. (33 1/2 Carmen Hill Road, Brookfield)
EM-NEXTEL-018-020510 - Nextel Communications, Inc. notice of intent to modify an existing telecommunications facility located at 39 Carmen Hill Road, Brookfield, Connecticut. Withdrawn
EM-AT&T-"UNIVERSAL"-030221 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-VER-018-040524 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut.
EM-CING-138-126-103-018-051025 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 155 Harvest Ridge Road, Stratford; 17 Daybreak Lane, Shelton; 219 Nell’s Rock Road, Shelton; 10 Willard Road, Norwalk; and on Route 7, Brookfield, Connecticut.
EM-SPRINT-NEXTEL-018-071119 - Sprint Nextel Corporation notice of intent to modify an existing telecommunications facility located at 39 Carmen Hill Road, Brookfield, Connecticut. Decision.
EM-VER-018-080717 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut.
EM-T-MOBILE-018-100819 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 20 Vale Road, Brookfield, Connecticut.
EM-SPRINT-018-180430 – Sprint notice of intent to modify an existing telecommunications facility located at 761 Federal Road, Brookfield, Connecticut. Incomplete LetterResponse to Incomplete and Council AcknowledgementDecision Construction Complete
EM-T-MOBILE-018-180927 - T-Mobile notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. DecisionCompletion Letter
EM-SPRINT-018-181121 - Sprint notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. Incomplete LetterExtension LetterResponse to Incomplete and Council Acknowledgement Decision Construction Complete
EM-T-MOBILE-018-190606 – T-Mobile notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Completion
EM-SPRINT-018-191008 – Sprint notice of intent to modify an existing telecommunications facility located at 101A Park Ridge Road, Brookfield, Connecticut. Decision Will Not Complete
EM-SPRINT-018-191015 - Sprint notice of intent to modify an existing telecommunications facility located at 761 Federal Road, Brookfield, Connecticut. Decision Will Not Complete
EM-VER-018-200323 - Cellco Partnership d/b/a/ Verizon Wireless notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. Decision Notice of Completion
EM-T-MOBILE-018-200902 – T-Mobile notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement 2nd Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Start Notice of Completion
EM-CING-018-210511 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 2 Huckleberry Hill Road, Brookfield, Connecticut. Decision Notice of Completion
EM-VER-018-210624 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 100 Pocono Road, Brookfield, Connecticut. Decision Notice of Construction Commencement Notice of Completion
EM-T-MOBILE-018-211019 - T-Mobile notice of intent to modify an existing telecommunications facility located at 101 Park Ridge Road (a/k/a Vale Road), Brookfield, Connecticut. Decision Notice of Completion
TS-DISH-018-211207 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 39 Carmen Hill Road, Brookfield, Connecticut. Town Letter Incomplete Letter Mount Analysis Council Acknowledgement of Submission Decision Notice of Construction Completion
TS-DISH-018-220427 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 100 Pocono Road, Brookfield, Connecticut. Town Letter Decision Notice of Completion
EM-T-MOBILE-018-230123 – T-Mobile notice of intent to modify an existing telecommunications facility located at 761 Federal Road, Brookfield, Connecticut. Decision Temporary Configuration Request and Council Decision Extension Request and Council Extension Approval Notice of Construction Completion
EM-VER-018-230925 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 100 Pocono Road, Brookfield, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-VER-018-240214 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 37 Carmen Hill Road, Brookfield, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
EM-ATT-018-240315 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 761 Federal Road, Brookfield, Connecticut. Decision Request for Project Change and Council Revision Decision