May 7, 2024
- Notice of Scoping for Middlebury Commons Interconnection with Connecticut Water Company Naugatuck Region - Central System, Middlebury.
- Revised Notice of Scoping for Removal of Traffic Signals on Route 9, Middletown. (Additional Information)
- NEW! Notice of Scoping for 10 Liberty Street, New Haven.
Scoping Notice - Post-Scoping Notice (Need More Time)
- Notice of Time Extension for Post-Scoping Notice for The Camelot Flats and Lofts, West Hartford.
- Post-Scoping Notice for 85 Tremont Street, Meriden.
- NEW! Post-Scoping Notice for Nathan Hale System Main Extension to Plains Road, Coventry.
- NEW! Post-Scoping Notice for New School of Nursing Building at the University of Connecticut, Mansfield.
- NEW! Post-Scoping Notice for Return to the Riverbend, Middletown.
- NEW! Post-Scoping Notice for MLK Tyler, New Haven.
Environmental Impact Evaluation (EIE)
No EIE Notice has been submitted for publication in this edition.
No Record of Decision Notice has been submitted for publication in this edition.
No Determination of Adequacy Notice has been submitted for publication in this edition.
No State Land Transfer Notice has been submitted for publication in this edition.
The next edition of the Environmental Monitor will be published on May 21, 2024.
Subscribe to e-alerts to receive an e-mail when the Environmental Monitor is published.
Notices in the Environmental Monitor are written and formatted by the sponsoring agencies and are published unedited. Questions about the content of any notice should be directed to the sponsoring agency.
Inquiries and requests to view or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency.
Scoping Notice
"Scoping" is for projects in the earliest stages of planning. At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist. Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study. Send your comments to the contact person listed for the project by the date indicated. Read More
The following Scoping Notices have been submitted for publication in this edition.
1. Notice of Scoping for Middlebury Commons Interconnection with Connecticut Water Company Naugatuck Region - Central System
Address of possible location: Nutmeg Road into Middlebury Commons Condominium Complex
Municipality where proposed action might be located: Middlebury
Project Description: The work to be performed under this project includes abandoning the drinking water wells at Middlebury Commons and consolidating their small public water system with Connecticut Water Company's Naugatuck Region - Central System. The current infrastructure that provides water to Middlebury Commons is aged and lacks redundancy that is causing increasing risk of extended periods without potable water to residents of the condominium community. The project would require installing approximately 460 feet of 6” water main (8” if a fire hydrant is needed) from Connecticut Water Company's existing water main on Nutmeg Road, providing an easement to Connecticut Water Company, connecting each building to the water main, and abandoning the existing drinking water wells.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: May 16, 2024.
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: April 26, 2024.
Written comments and/or requests for a public scoping meeting should be sent to:
Name: Eric McPhee
Agency: Department of Public Health, Drinking Water Section
Address: 410 Capitol Avenue, MS #12DWS, PO Box 340308, Hartford, CT 06134-0308
E-Mail: dph.sourceprotection@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Agency: Department of Public Health, Hearing Office
Address: 410 Capitol Avenue, MS #13PHO Hartford, CT 06134-0308
E-Mail: DPH.foi@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
2. Notice of Scoping for Removal of Traffic Signals on Route 9 and Associated Improvements
Address of possible location: Route 9 between log miles 22.9 and 25.4. At the southern limit, the proposed project begins near the Eastern Drive interchange (Exit 22) and extends to the north and terminates near the Route 99 interchange (Exit 25).
Municipality where proposed action might be located: Middletown, Connecticut
Project Description: Route 9 is a major north/south route connecting Old Saybrook and West Hartford. Through the downtown Middletown area, it is flanked by the Connecticut River to the east and an active Providence and Worcester Railroad line to the west.
The purpose of the project is to improve safety and reduce congestion. The presence of two traffic signals on Route 9 leads to crash rates substantially higher than adjacent segments of freeway. To remove the traffic signal on Route 9 at the Washington Street interchange (Exit 23C), a new off-ramp from Route 9 Northbound is proposed to provide access to River Road, approximately 3,500 feet south of Washington Street. Access to Washington Street is proposed to be removed from Route 9. The interchange will encompass the existing Providence and Worcester rail line and will provide access to Route 9 Southbound. An acceleration lane to Route 9 Southbound will provide access from Washington Street prior to Route 17 (Exit 23A). The existing access from Route 9 Southbound to Washington Street will be removed and motorists will be directed towards the previous exit for access to Route 66.
The traffic signal on Route 9 at the Route 17 interchange onto Hartford Avenue (Exit 24) will be removed by elevating the southbound direction of Route 9. The grade separation will allow for free flow acceleration from Hartford Avenue to Route 9 Northbound, crossing under Route 9 Southbound. This acceleration lane will be constructed in the existing median of Route 9 and will serve as an additional through lane for Route 9 Northbound until Exit 25 for Route 99 in Cromwell. The existing access to Hartford Avenue from Route 9 Northbound will be relocated south. Access to and from Hartford Avenue from Route 9 Southbound will be maintained with full length deceleration and acceleration lanes.
A 200-foot right turn lane is proposed on Rapallo Avenue at Main Street. The additional lane requires approximately five feet of widening within the street right of way. This requires the removal of seven parking spaces, with sidewalks maintained on both sides of the road.
Project Map: Click here to view a map of the project area. Project Plans: Click here to view project conceptual plans.
Written comments from the public are welcomed and will be accepted until the close of business on: Thursday, May 16, 2024.
There will be a public scoping meeting for this proposed action:
DATE: Tuesday April 30, 2024
TIME: 5:00 p.m. Open House, 7:00 p.m. formal presentation
PLACE: Wesleyan University - Beckham Hall - 45 Wyllys Avenue, Middletown, CT 06459
NOTES: The meeting location is ADA accessible. Language assistance, including American Sign Language, may be requested by contacting CTDOT's Language Assistance Call Line at (860) 594-2109. Requests should be made at least 5 business days prior to the meeting. Language assistance is provided at no cost to the public and efforts will be made to respond to timely requests for assistance. Persons with hearing and/or speech disabilities may dial 711 for Telecommunications Relay Services (TRS).
Closed captioning and non-English translation options will be available for the presentation posted on CTDOT's YouTube Virtual Public Information Meeting playlist: https://portal.ct.gov/ctdotvpimarchive.
Persons with limited internet access may also request that project information be mailed to them by contacting Stephen Hall, Project Manager, at Stephen.Hall@ct.gov or 860-594-2591.
Additional information can be found here: https://portal.ct.gov/DOT/Projects/0082-0318-Route9-Middletown-Home.
A previous alternative for the project was scoped in the Enviornmental Monitor on March 6, 2018, and a public scoping meeting was held on March 22, 2018. The design proposed at that time was met unfavorably by the public as there would be substantial impacts to the adjacent neighborhood, therefore, that alternative was removed from consideration and CTDOT issued a post scoping notice on April 5, 2022, to reflect this and close out the CEPA scoping process under the previous project scope. Since this time, CTDOT performed a detailed traffic analysis and has met with the city several times to develop the alternative under the current public scoping notice. Furthermore, CTDOT held public workshops on February 21, 2024, and February 22, 2024, to engage the public prior to the formal CEPA scoping process. Feedback from the public workshops was positive overall.
Comments/ questions about the public meeting, or comments/ questions about the project should be sent to (email preferred):
Name: Mr. Stephen Hall, Project Manager
Agency: Connecticut Department of Transportation, Bureau of Engineering and Construction
Address: 2800 Berlin Turnpike, Newington, CT 06131
E-Mail: DOT.Rte9Middletown@ct.gov
Phone: 860-594-2591
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Ms. Alice M. Sexton
Agency: Connecticut Department of Transportation, Office of Legal Services
Address: 2800 Berlin Turnpike, Newington, CT 06131
E-Mail: Alice.Sexton@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
3. Notice of Scoping for 10 Liberty Street
Address of possible location: 10-30 Liberty Street/45 Spring Street, New Haven, CT 06519
Municipality where proposed action might be located: New Haven
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: May 17, 2024.
Written comments and/or requests for a public scoping meeting should be sent to
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
Scoping Notice - Post-Scoping Notice (Need More Time)
If an agency is unable to publish a Post-Scoping Notice within six months after the comment period for scoping, the agency will publish an update with an action status and an estimate as to when a Post-Scoping Notice will be published. Such an update will be published by the agency at six-month intervals until the Post-Scoping Notice is published. Read More
The following notice for additional time has been submitted for publication in this edition.
1. Notice of Time Extension for Post-Scoping Notice for The Camelot Flats and Lofts
Address of Possible Project Location: 900 Farmington Avenue, West Hartford, Connecticut
Municipality where proposed action would be located: West Hartford
Connecticut Environmental Policy Act (CEPA) Determination: On August 8, 2023, the Department of Housing published a Notice of Scoping to solicit public comments for this action in the Environmental Monitor. The DOH is unable to publish its determination regarding this action at this time.
Action Status: Evaluating comments.
Estimated Publication Date: The DOH estimates that a Post-Scoping Notice will be published in the Environmental Monitor on or before June 10, 2024.
If you have questions about the proposed action, contact:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
Phone: 860-270-8230
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The DOH will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the CEPA. A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
Post-Scoping Notice
A Post-Scoping Notice is the determination by a sponsoring agency, after publication of a Scoping Notice and consideration of comments received, whether an Environmental Impact Evaluation (EIE) needs to be prepared for a proposed State action. Read More
The following Post Scoping Notices have been submitted for publication in this edition.
1. Post-Scoping Notice for 85 Tremont Street
Address of Possible Project Location: 85 Tremont Street, Meriden, CT 06450
Municipality where it would be located: Meriden
Connecticut Environmental Policy Act (CEPA) Determination: On August 22nd, 2023, the Department of Housing published a Notice of Scoping to solicit public comments for this proposed adaptive reuse in the Environmental Monitor.
Agency contact:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
Phone: 860-270-8230
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
Phone: 860-270-8230
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The DOH expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
2. Post-Scoping Notice for Nathan Hale System Main Extension to Plains Road
Addresses of Possible Project Location: South Street Extension, Coventry from approximately the intersection of Upton Drive to Plains Road. The routing of the water main proposes to run adjacent to the South Street Extension Right of Way (ROW) immediately east of the Nathan Hale Subdivision due to the wetland complex within the ROW.
Municipality where it would be located: Coventry
Connecticut Environmental Policy Act (CEPA) Determination: On January 16, 2024, the Department of Public Health (DPH) published a Notice of Scoping to solicit public comments for this proposed project in the Environmental Monitor.
Comments were received from the Department of Energy and Environmental Protection on February 15, 2024, and the Office of Policy and Management on February 16, 2024, (collectively Agency Comments) during the comment period. The Town of Coventry provided Response to Agency Comments on February 23, 2024. DPH has reviewed the Agency Comments and the Town of Coventry’s responses (Town Responses). DPH’s assessment of Agency Comments and Town Responses are included in the Environmental Review Checklist.
Agency contact:
Name: Mr. Eric McPhee
Agency: Department of Public Health – Drinking Water Section
Address:410 Capitol Avenue, MS #12DWS, PO Box 340308, Hartford, CT 06134-0308
Phone: 860-509-7333
E-Mail: eric.mcphee@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Agency: Department of Public Health, Hearing Office
Address: 410 Capitol Avenue, MS #13PHO, Hartford, CT 06134-0308
Phone: 860-566-5682
E-Mail: DPH.foi@ct.gov
What Happens Next: DPH expects the project to go forward. This is anticipated to be the final notice of the project to be published in the Environmental Monitor.
3. Post-Scoping Notice for New School of Nursing Building at the University of Connecticut
Address of Possible Project Location: Alethia Drive & Bolton Road
Municipality where it would be located: Mansfield
Connecticut Environmental Policy Act (CEPA) Determination: On August 8, 2023, the University of Connecticut (UConn) published a Notice of Scoping to solicit public comments for this action in the Environmental Monitor. A public scoping meeting was held on August 30, 2023, and comments were received during the meeting and the public comment period that concluded on September 8, 2023. On March 5, 2024, UConn published a Notice of Time Extension for Post-Scoping.
After consideration of the comments received, UConn has determined the project does not require the preparation of an Environmental Impact Evaluation (EIE) under the CEPA. UConn's conclusion is documented in a Memo of Findings and Determination and an Environmental Review Checklist which includes responses to comments received.
Agency contact:
Name: Antoaneta Fedeles, AIA, PMP, LEED AP
Agency: University Planning, Design and Construction
Address: 3 Discovery Drive, U-6038, Storrs, CT 06269-6038
E-Mail: antoaneta.fedeles@uconn.edu
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to: https://publicrecords.uconn.edu/make-a-request/
What Happens Next: UConn anticipates the project will move forward and this is expected to be its final notice published in the Environmental Monitor.
4. Post-Scoping Notice for Return to the Riverbend
Addresses of possible locations: 22 River Road, 44 River Road, 110 River Road, and 225 River Road
Municipality where proposed action might be located: City of Middletown
Connecticut Environmental Policy Act (CEPA) Determination: On October 3, 2023, the Department of Economic and Community Development (DECD) published a Notice of Scoping to solicit public comments for this proposed Return to the Riverbend project in the Environmental Monitor.
No public scoping meeting was held.
Comments were received from the Connecticut Department of Energy and Environmental Protection (DEEP) during the public comment period. No other comments were received from the public. The DECD’s responses to the comments received are in the Environmental Review Checklist.
After consideration of the comments received, the DECD has determined the project does not require the preparation of an Environmental Impact Evaluation (EIE) under the CEPA. The agency’s conclusion is documented in a Memo of Findings and Determination and an Environmental Review Checklist.
Agency contact:
Name: William Wallach
Agency: Department of Economic and Community Development
Address: 450 Columbus Boulevard, Suite 5, Hartford, CT 06103
E-Mail: William.wallach@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring State agency:
Name: Mark Burno
Agency: Department of Economic and Community Development
Address: 450 Columbus Boulevard, Suite 5, Hartford, CT 06103
E-Mail: mark.burno@ct.gov
What Happens Next: The DECD expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
5. Post-Scoping Notice for MLK Tyler
Address of Possible Project Location: 16 Miller Street, New Haven, CT
Municipality where it would be located: New Haven
Connecticut Environmental Policy Act (CEPA) Determination: On September 19, 2023, the Department of Housing (DOH) published a Notice of Scoping to solicit public comments for this proposed redevelopment project in the Environmental Monitor.
Agency contact:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
Phone: 860-270-8230
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty, Ph.D.
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
Phone: 860-270-8230
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The DOH expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
EIE Notice
After Scoping, an agency that wishes to undertake an action that could significantly affect the environment must produce, for public review and comment, a detailed written evaluation of the expected environmental impacts. This is called an Environmental Impact Evaluation (EIE). Read More
No EIE Notice has been submitted for publication in this edition.
Agency Record of Decision
After an Environmental Impact Evaluation (EIE) is developed, an agency will prepare a concise public record of decision, which takes into consideration the agency’s findings in the EIE, and any comments received on that evaluation. Read More
No Record of Decision Notice has been submitted for publication in this edition.
OPM's Determination of Adequacy
After an Environmental Impact Evaluation (EIE) and record of decision are developed, the Office of Policy and Management (OPM) will determine if the EIE and the associated process are adequate. If not, OPM will specify the areas of inadequacy with reference to CEPA or the CEPA regulations and specify the corrective action required. Read More
No Determination of Adequacy Notice has been submitted for publication in this edition.
State Land Transfer Notice
Connecticut General Statutes Section 4b-47 requires public notice of most proposed sales and transfers of state-owned lands. The public has an opportunity to comment on any such proposed transfer. Each notice includes an address where comments should be sent. Read more about the process.
No State Land Transfer Notice has been submitted for publication in this edition.
CEPA Project Inventory
The Office of Policy and Management (OPM) maintains a list of projects that have entered the CEPA process. It shows each project's status. The inventory can be found here.
CEQ Contact Information
All inquiries and requests of the Council should be sent electronically to: ceq@ct.gov.
The Adobe Reader might be necessary to view and print Adobe Acrobat documents, including some of the maps and illustrations that are linked to ;this publication. Acrobat Reader also provides several preferences that make the reading of PDFs more accessible for visually impaired and motion-impaired users. If you have an outdated version of Adobe Reader, it might cause pictures to display incompletely. To download up-to-date versions of the free Reader, click on Download the free Acrobat Reader. This link will also provide information and instructions for downloading and installing the Reader.