- Notice of Scoping for 80 South Road, Farmington.
- Notice of Scoping for The Camelot Flats and Lofts, West Hartford.
- Notice of Scoping for Wall Street Place, Norwalk.
- Notice of Scoping for New School of Nursing Building at the University of Connecticut, Mansfield.
- Notice of Scoping for MLK Apartments, Hartford.
- Notice of Scoping for Business Park North, Norwich.
- Notice of Scoping for 85 Tremont Street, Meriden.
Scoping Notice - Post-Scoping Notice (Need More Time)
No Post Scoping (Need More Time) Notice has been submitted for publication in this edition
- NEW! Post-Scoping Notice for Southeastern Connecticut Water Authority’s Interconnection of Montville and Seven Oaks Divisions, Montville.
- NEW! Post-Scoping Notice for Craigmoor Water Main Interconnection, Ridgefield.
- NEW! Post-Scoping Notice for Cedar Heights Water Main Interconnection, Brookfield and Danbury.
Environmental Impact Evaluation (EIE)
No Environmental Impact Evaluation has been submitted for publication in this edition.
No Record of Decision Notice has been submitted for publication in this edition.
No Determination of Adequacy Notice has been submitted for publication in this edition.
No State Land Transfer Notice has been submitted for publication in this edition.
The next edition of the Environmental Monitor will be published on September 19, 2023.
Subscribe to e-alerts to receive an e-mail when the Environmental Monitor is published.
Notices in the Environmental Monitor are written and formatted by the sponsoring agencies and are published unedited. Questions about the content of any notice should be directed to the sponsoring agency.
Inquiries and requests to view or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency.
Scoping Notice
"Scoping" is for projects in the earliest stages of planning. At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist. Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study. Send your comments to the contact person listed for the project by the date indicated. Read More
1. Notice of Scoping for 80 South Road
Address of possible location: 80 South Road, Farmington, CT
Municipality where proposed action might be located: Farmington
Project Description: 80 South Road is a proposed 65-unit affordable multifamily development located on South Road in Farmington, CT. 15 of these 65 units will qualify as supportive housing units, set aside for adults with developmental disabilities. The site of the proposed development is 2.92 acres and was assembled from three former parcels - 62 South Road (0.48 acres), 8864 South Road (1.04 acres), and 8880 South Road (1.408 acres). 62 South Road was previously occupied by a single-family home constructed in 1965 that was demolished in the late winter of 2022. Both 8864 and 8880 South Road were formerly vacant land. There are, however, wetlands located on the 8864 and 8880 South Road parcels. A watercourse located on the western portion of 8880 South Road drains north to south through the study area. A forested wetland was delineated on the eastern portion of 8864 South Road that drains into the watercourse via a rill. The site was studied for vernal pool habitats, of which there were none. The proposed development will be comprised of (2) buildings. The first, Building A, will feature (36) units, community recreation space (both interior and exterior), an office for our social service provider and will be serviced by an elevator. The second, Building B, will feature (29) units and a leasing office. Across the development there will be a total of (6) studio apartments, (20) one-bedroom apartments, and (39) two-bedroom apartments. (15) of these apartments will be designated for use by our supportive population. Building A will occupy a building footprint of approximately 11,360 sf including 3,600 sf of outdoor amenity space and Building B will occupy a building footprint of approximately 10,400 sf. In addition to utilizing biofiltration and bioretention systems, the buildings landscape plan features all native plant species and minimizes use of turf grass to reduce outdoor water usage. Porous pavement has also been utilized in both parking areas and the buildings proposed amenity space.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: 8 September 2023.
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: 18 August 2023.
Written comments and/or requests for a public scoping meeting should be sent to:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
2. Notice of Scoping for The Camelot Flats and Lofts
Address of possible location: 900 Farmington Avenue, West Hartford, Connecticut
Municipality where proposed action might be located: West Hartford
Project Description: The site consists of a 0.67-acre parcel of land with an approximately 8,000 square foot shuttered restaurant, an operating 22,000 square foot hotel, and two levels of structured parking, which will be turned into mixed income affordable housing of total 44 units (20 new construction units and 24 rehabilitation units). It is located on the northern side of Farmington Avenue, 135 feet east of the intersection of Farmington Avenue and Trout Brook Drive in a general business district of West Hartford, Connecticut. The on-site buildings, paved driveway, and landscaping cover the entire site. The restaurant building is currently vacant, and the West Hartford Inn occupies the hotel building. The site is connected to public water, sewer, and electric, and is heated with natural gas. The site has soil issues as well as lead, and asbestos in the existing buildings. The project will include the demolition of the restaurant, adaptive reuse of the hotel building, new construction, soil remediation and abatement of hazardous materials.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: 8 September 2023
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: 18 August 2023
Written comments and/or requests for a public scoping meeting should be sent to
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
3. Notice of Scoping for Wall Street Place
Addresses of possible location: 61 Wall Street & 17 Isaacs Street, Norwalk, CT 06850
Municipality where proposed action might be located: Norwalk
Project Description: Wall Street Place, to be developed by JHM Group of Companies with support from the City of Norwalk, will restart a stalled development from 2015. The mixed-use project, which covers 2.08 total acres and two separate buildings, will include 151 new, mixed-income dwelling units and ground floor retail in the heart of the Wall Street neighborhood which once stood as a prominent downtown, central business district for Norwalk. 61 Wall Street was partial built before construction halted in 2015. This site will ultimately contain 101 rental units, 10,000+ square feet of retail and community space, and 40 surface-level parking spaces.
17 Isaacs Street was the site of a former movie theater that has since been demolished. 17 Isaacs will contain 50 rental units and 157 structured, parking spaces. All environmental concerns for both properties were addressed prior to each property being demolished. 61 Wall Street was demolished in the early-mid 2010's prior to the construction of the basement and podium. 17 Isaacs Street's was abated in late 2022 prior to demolition. The project site is not in any storm surge inundation zones, floodzones and aquifer protection area. There is no critical habitat in the project area. 17 Isaacs Street received a January 2023 letter from the State Historic Preservation Office (SHPO) evidencing that the proposed development of the subject property will have no adverse effect to historic resources. Alternatively, SHPO determined that the proposed redevelopment at Norwalk's 61-63 Wall Street poses an adverse effect for which mitigation measures have been recommended.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: September 8, 2023
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: August 18, 2023
Written comments and/or requests for a public scoping meeting should be sent to:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
4. Notice of Scoping for New School of Nursing Building at the University of Connecticut
Address of possible location: Alethia Drive
Municipality where proposed action might be located: Mansfield
Project Description: The University of Connecticut (UConn) is planning to construct a new School of Nursing building on Alethia Drive within its South Campus in Storrs. Currently the School of Nursing entirely resides in Storrs Hall on the north side of campus. The new School of Nursing building would be strategically located between existing clinical, academic, and research space, and align with the long-term development plan outlined in the 2015-2035 Campus Master Plan.
The Proposed Action to be assessed under the Connecticut Environmental Policy Act (CEPA) would construct up to a 4-story building approximately 70,000-80,000 gross square feet (gsf) in size. The building program would include:
- Instructional spaces, including a lecture hall and classrooms
- A Simulation Lab Suite
- A Human Behavioral Research Lab
- A Wet Lab
- A Student Academic Center
- Offices and support spaces
Accessible parking and service and loading zones would also be provided on-site, as well as usable open space around the building.
The purpose of this project is to accommodate increased enrollment for the School of Nursing that in turn will help address the shortage of nurses, the changing nature of healthcare, and the increasing disparity in health outcomes regionally and nationally. Storrs Hall cannot fulfill that purpose or adequately satisfy future requirements in terms of size and spatial configuration. The new School of Nursing building would support new teaching modes by educating nurses through patient-centered practice, interdisciplinary research, and technology-based innovations.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until 5:00 PM EST on: Friday, September 8, 2023
There will be a public scoping meeting for this proposed action:
DATE: Wednesday, August 30, 2023
TIME: 6:00 PM EST
PLACE: Online
NOTES: Participants MUST REGISTER IN ADVANCE through the following link:
https://us06web.zoom.us/webinar/register/WN_CGqGZiYORruXFnnD9488iA
After registering, you will receive a confirmation email containing information about joining the meeting (including an option to join by phone).
Additional information regarding the project, as well as a link to a recording of the meeting and meeting materials, will be posted at: https://updc.uconn.edu/nursing.
Written comments and/or questions regarding the public scoping meeting and/or the scoping for this project should be sent to:
Name: Antoaneta Fedeles, AIA, PMP, LEED AP
Agency: University Planning, Design and Construction
Address: 3 Discovery Drive, U-6038, Storrs, CT 06269-6038
E-Mail: antoaneta.fedeles@uconn.edu
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to https://publicrecords.uconn.edu/make-a-request/
What Happens Next: UConn will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
5. Notice of Scoping for MLK Apartments Hartford
Address of possible location: 79-107 Van Block Avenue, Hartford, CT
Municipality where proposed action might be located: Hartford
Project Description: The low-income residential apartment buildings located at 79-107 Van Block Avenue are proposed for demolition and redevelopment. The planned activities include the demolition of the existing residential apartment buildings (eight residential apartment buildings consisting of eight apartment units; each consisting of six 3-bedroom units and two 2-bedroom units built circa 1966 and a community building built 2004). The redevelopment of the site will consist of low-income housing to include fifteen buildings and 161 residential apartment units (70 1-bedroom units, 72 2-bedroom units, and 19 3-bedroom units). The redevelopment will not increase the project sites footprint or impact any adjacent properties. MLK Apartments is a 64-unit apartment community located on Van Block Avenue in Hartford’s Sheldon/Charter Oak neighborhood. The complex was built in 1970 as affordable housing for families displaced by urban renewal. To attract residents of a mix of incomes, while ensuring no displacement of current residents, the proposed unit mix consists of both market rate and affordable flats and townhouses. The newly transformed community will include 70 one-bedroom units, 63 two-bedroom units, and 22 three-bedroom units. Sheldon/Charter Oak, Hartford's oldest neighborhood, has recently seen investment through the re-purposing of historic buildings, including Colt Gateway and Capewell Lofts. The neighborhood has riverfront access, a soccer stadium, and a newly designated National Historical Park encompassing the Colt Factory and Samuel and Elizabeth Colt's mansion. The building heights and exteriors of the re-envisioned MLK Apartments will reflect the scale and design palate of the surrounding historic neighborhood. The property is within walking distance of Hartford's downtown, and also benefits from multiple bus stops in the immediate vicinity. The MLK apartments in Hartford are not in any storm surge zone, floodzones. The location does not have any critical habitat. State Historic Preservation Office found no adverse impact with this project and Tribal consultation was done also.
Written comments from the public are welcomed and will be accepted until the close of business on: September 8, 2023
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: August 18, 2023
Written comments and/or requests for a public scoping meeting should be sent to
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
6. Notice of Scoping for Business Park North
Addresses of possible location: 83, 97, 105, 111 Taftville-Occum Road; Taftville-Occum Road (Map 19, Block 45, Lot 45); 431, 432, 439, 461 Canterbury Turnpike; 431 Rear Canterbury Turnpike; 180, 207, 253 Lawler Lane; 18 School Avenue; 527 Scotland Road (off) Lawler Lane Rear; Bromley Lane
Municipality where proposed action might be located: Norwich
Project Description: The Business Park North Roadway Project (the “Project”) involves the construction of a new 7,532± linear foot (LF) roadway within a proposed 60-foot-wide right-of-way (ROW) that will connect Taftville-Occum Road (Route 97) to Lawler Lane in the City of Norwich. The roadway, which will include a 10-foot-wide multi-use trail along its entire length, is proposed to service a planned 184-acre industrial park (Business Park North) in an area where significant undeveloped acreage currently exists, attracting manufacturing, assembling, transportation, logistics, work-force development, fire/safety facilities and flex-space opportunities.
The typical roadway section consists of two 11-foot travel lanes, two 4-foot paved shoulders, two 3-foot gravel strips, and a 10-foot wide, permeable paved multi-use trail. Grass swales will also be constructed outboard of the paved roadway and trail surfaces. The new roadway will involve modification of the existing I-395 southbound on-and-off ramps and includes a round-about to allow for safe and efficient access to Route 97 and the new Business Park North Roadway from I-395 as shown on the site plan included with this scoping notice. The new roadway will also include round-abouts at Canterbury Turnpike and Lawler Lane. Construction of the roadway would entail four (4) box culvert crossings of existing wetlands/drainageways as well as a bridge that would span Byron Brook and associated riparian wetlands. The roadway is anticipated to be constructed in phases that will progress depending upon user demand within Business Park North.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: September 7, 2023.
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: August 17, 2023.
Written comments and/or requests for a public scoping meeting should be sent to:
Name: Melinda Wilson, Assistant Director, Community Investment Fund 2030
Agency: Department of Economic and Community Development
Address: 450 Columbus Blvd, Suite 5, Hartford CT 06103
E-Mail: Melinda.Wilson@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Melinda Wilson, Assistant Director, Community Investment Fund 2030
Agency: Department of Economic and Community Development
Address: 450 Columbus Blvd, Suite 5, Hartford CT 06103
E-Mail: Melinda.Wilson@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
7. Notice of Scoping for 85 Tremont Street, Meriden
Address of possible location: 85 Tremont Street, Meriden, CT
Municipality where proposed action might be located: Meriden
Project Description: Trinity Financial (“Trinity”) plans to transform the historic 123,000 square-foot Aeolian Company building in Meriden into 82 units of mixed-income rental housing. Trinity’s proposed adaptive reuse project, which is located at 85 Tremont Street, will breathe new life into a historic asset, remediate a Brownfields site, and provide new rental housing at four income tiers. 85 Tremont Street is located within Meriden’s recently established Adaptive Reuse Overlay District, which was implemented to catalyze the redevelopment of vacant and underutilized historic industrial buildings. The Aeolian Company building sits on a parcel of land that is roughly 2.2 acres. The plans for 85 Tremont call for a total of 82 mixed-income apartments, including one- and two-bedroom units, at up to 30%, 50%, 60%, and 80% of area median income (AMI), as well as unrestricted, market-rate units. Eleven of the units at 30% of AMI will be project-based HUD Section 811 units. The subject site is considered an ‘Establishment’ pursuant to section 22a-1a-134. Phase I, II, III Environmental Site Assessments were done, and Remedial Action Plan (RAP) will be prepared this Fall. The project location is not in any floodzone, wetland, and storm surge zone. There is no critical habitat identified in the project area. The location is not in any nationwide important farmland soil. The CT State Historic Preservation Office (SHPO) has reviewed the Part 1 application, “Determination of Historic Structure Status,” for the above-listed building and has determined that the project is likely be listed in the National Register of Historic Places. Tribal consultation requests were also made on August 10th, 2023.
Project Map: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: September 22, 2023
Any person may ask the sponsoring agency to hold a public scoping meeting by sending such a request to the address below. If a public scoping meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a public scoping meeting. Such requests must be made by: September 1, 2023
Written comments and/or requests for a public scoping meeting should be sent to
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:
Name: Mithila Chakraborty
Agency: Department of Housing
Address: 505 Hudson Street, Hartford, CT 06106-7106
E-Mail: mithila.chakraborty@ct.gov
What Happens Next: The sponsoring agency will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.
If an agency is unable to publish a Post-Scoping Notice within six months after the comment period for scoping, the agency will publish an update with an action status and an estimate as to when a Post-Scoping Notice will be published. Such an update will be published by the agency at six-month intervals until the Post-Scoping Notice is published. Read More
No Notice for additional time has been submitted for publication in this edition.
Post-Scoping Notice
A Post-Scoping Notice is the determination by a sponsoring agency, after publication of a Scoping Notice and consideration of comments received, whether an Environmental Impact Evaluation (EIE) needs to be prepared for a proposed State action. Read More
1. Post-Scoping Notice for Southeastern Connecticut Water Authority’s Interconnection of Montville and Seven Oaks Divisions
Addresses of Possible Project Location: Hunters Run and Old Colchester Rd.
Municipality where it would be located: Montville
Connecticut Environmental Policy Act (CEPA) Determination: On March 7, 2023, the CT Department of Public Health (CT DPH) published a Notice of Scoping to solicit public comments for this proposed project in the Environmental Monitor.
Comments were received from the Department of Energy and Environmental Protection (DEEP) during the comment period on April 5, 2023, as well as a Diversion Permit Need Determination on July 13, 2023. The DPH review of all comments and responses are included in the Environmental Review Checklist.
Agency contact:
Name: Eric McPhee
Agency: Department of Public Health, Drinking Water Section
Address: 410 Capitol Avenue, MS #12DWS, PO Box 340308, Hartford, CT 06134-0308
Phone: 860-509-7333
E-Mail: dph.sourceprotection@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring State agency:
Agency: Department of Public Health, Hearing Office
Address: 410 Capitol Avenue, MS #13PHO Hartford, CT 06134-0308
Phone: 860-566-5682
E-Mail: DPH.foi@ct.gov
What Happens Next: The Department of Public Health will provide funding for the project and expects it to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
2. Post-Scoping Notice for Craigmoor Water Main Interconnection
Address of Possible Project Location: Barlow Mountain Road, North Salem Road (Route 116) and Craigmoor Road
Municipality where it would be located: Ridgefield
Connecticut Environmental Policy Act (CEPA) Determination:
On March 7, 2023, the CT Department of Public Health (DPH) published a Notice of Scoping to solicit public comments for this proposed project in the Environmental Monitor.
Comments were received from the Department of Energy and Environmental Protection (DEEP) during the comment period. The applicant provided a Memorandum, dated May 19, 2023, that provided DPH with a response to the DEEP comments that were considered by DPH in DPH's responses to DEEP's comments. The Memorandum includes DEEP's submitted comments for reference. The DPH review of all comments and DPH's responses, including the acceptance of the information in the applicant's Memorandum, are included in the Environmental Review Checklist.
After consideration of the comments received, the Department of Public Health has determined that the project is not one that may significantly affect the environment and therefore, it does not require the preparation of an Environmental Impact Evaluation (EIE) under CEPA. The Department’s conclusion is documented in an Environmental Review Checklist and Memorandum of Findings.
Agency contact:
Name: Eric McPhee
Agency: Department of Public Health, Drinking Water Section
Address: 410 Capitol Avenue, MS #12DWS, PO Box 340308, Hartford, CT 06134-0308
Phone: 860-509-7333
E-Mail: dph.sourceprotection@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring State agency:
Agency: Department of Public Health, Hearing Office
Address: 410 Capitol Avenue, MS #13PHO Hartford, CT 06134-0308
Phone: 860-566-5682
E-Mail: DPH.foi@ct.gov
What Happens Next:
The Department of Public Health will provide funding for the project and expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
3. Post-Scoping Notice for Cedar Heights Water Main Interconnection
Addresses of Possible Project Location: Nabby Road in Brookfield, CT; N Nabby Road and Forty Acres Mountain Road in Danbury, CT
Municipalities where it would be located: Brookfield, Danbury
Connecticut Environmental Policy Act (CEPA) Determination: On March 7, 2023, the CT Department of Public Health (CT DPH) published a Notice of Scoping to solicit public comments for this proposed project in the Environmental Monitor.
Agency contact:
Name: Eric McPhee
Agency: Department of Public Health, Drinking Water Section
Address: 410 Capitol Avenue, MS #12DWS, PO Box 340308, Hartford, CT 06134-0308
Phone: 860-509-7333
E-Mail: DPH.sourceprotection@ct.gov
Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring State agency:
Agency: Department of Public Health, Hearing Office
Address: 410 Capitol Avenue, MS #13PHO Hartford, CT 06134-0308
Phone: 860-566-5682
E-Mail: DPH.foi@ct.gov
What Happens Next: The Department of Public Health will provide funding for the project and expects it to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
After Scoping, an agency that wishes to undertake an action that could significantly affect the environment must produce, for public review and comment, a detailed written evaluation of the expected environmental impacts. This is called an Environmental Impact Evaluation (EIE). Read More
No EIE Notice has been submitted for publication in this edition.
Agency Record of Decision
After an Environmental Impact Evaluation (EIE) is developed, an agency will prepare a concise public record of decision, which takes into consideration the agency’s findings in the EIE, and any comments received on that evaluation. Read More
OPM's Determination of Adequacy
After an Environmental Impact Evaluation (EIE) and record of decision are developed, the Office of Policy and Management (OPM) will determine if the EIE and the associated process are adequate. If not, OPM will specify the areas of inadequacy with reference to CEPA or the CEPA regulations and specify the corrective action required. Read More
State Land Transfer Notice
Connecticut General Statutes Section 4b-47 requires public notice of most proposed sales and transfers of state-owned lands. The public has an opportunity to comment on any such proposed transfer. Each notice includes an address where comments should be sent. Read more about the process.
CEPA Project Inventory
The Office of Policy and Management (OPM) maintains a list of projects that have entered the CEPA process. It shows each project's status. The inventory can be found here.
CEQ Contact Information
All inquiries and requests of the Council should be sent electronically to: ceq@ct.gov.
The Adobe Reader might be necessary to view and print Adobe Acrobat documents, including some of the maps and illustrations that are linked to ;this publication. Acrobat Reader also provides several preferences that make the reading of PDFs more accessible for visually impaired and motion-impaired users. If you have an outdated version of Adobe Reader, it might cause pictures to display incompletely. To download up-to-date versions of the free Reader, click on Download the free Acrobat Reader. This link will also provide information and instructions for downloading and installing the Reader.