January 8, 2013
- Responses of the Office of Policy and Management to public comments regarding the Draft State Conservation and Development Policies: A Plan for Connecticut, 2013-2018 (State C & D Plan)
- NEW! Spring Hill Reliability Improvements Project, Norwalk and New Canaan
- NEW! Southern Stoney Brook Transmission Main Renewal, Montville
- NEW! Putnam Water Main Replacement, Putnam
- NEW! State Building Space Needs, Hartford
- Additional Sources of Water Supply for the University of Connecticut, Storrs, with Revised Executive Summary and Extension of Comment Period and Second Public Hearing
- Extension of Public Water System from Middletown to Durham; Middletown, Middlefield, Durham
1. OPM Responses to Public Comments Regarding the Draft Conservation and Development Policies: A Plan for Connecticut, 2013-2018 (State C & D Plan)
The Office of Policy and Management (OPM) has published its responses to the public comments received regarding the draft of Conservation and Development Policies: A Plan for Connecticut, 2013-2018 (the State C&D Plan). They are available at OPM's website.
Once the necessary revisions are complete, OPM will send the plan will be sent to the General Assembly's Continuing Committee on State Planning and Development, which will conduct a public hearing as required by CGS Sec. 16a-30(a).
"Scoping" is for projects in the earliest stages of planning. At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist. Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study. Send your comments to the contact person listed for the project by the date indicated.
1. Notice of Scoping for the Spring Hill Reliability Improvements Project
Municipalities where proposed project might be located: Norwalk and New Canaan
Addresses of Possible Project Locations: Grandview Avenue, Reservoir Street, Dover Street, West Dover Street, Rhodonolia Park, Stevens Street, and Magnolia Avenue in Norwalk and Mill Road in New Canaan.
Project Description: Norwalk First Taxing District (NFTD) proposes to construct/install the following components to maintain adequate water supply at the Norwalk Regional Hospital, Paradigm Healthcare Center (150 bed nursing home), DaVita of Norwalk (dialysis center) and several other medical facilities associated with the regional hospital:
1. A new 1.0 MG elevated storage tank to replace the existing Spring Hill high service area elevated storage tank located adjacent to an existing Spring Hill 3.0 MG storage tank.
2. A new Spring Hill Booster Pump Station to replace the existing booster station located adjacent to an existing Spring Hill 3.0 MG storage tank. The new booster pump station will serve the new 1.0 MG elevated storage tank.
3. Approximately 3,600 linear feet of piping improvements to remedy these water supply deficiencies in the Spring Hill high service area.
4. Replacement of an existing altitude valve that serves the existing Spring Hill 3.0 MG storage tank.
5. Spring Hill Site security enhancements
In addition, NFTD proposes to install tank mixing systems for both the existing Spring Hill 3.0 MG storage tank and new 1.0-MG elevated storage tank.
Project Maps: Click here to view a map of the project area.
Written comments from the public are welcomed and will be accepted until the close of business on: Thursday, February 7, 2013
Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below. If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a Public Scoping Meeting. Such requests must be made by Friday, January 18, 2013.
Written comments and/or requests for a Public Scoping Meeting should be sent to:
Name: | Mr. Eric McPhee |
Agency: | Department of Public Health |
Drinking Water Section | |
Address: | 410 Capitol Avenue, MS #51WAT |
PO Box 340308 | |
Hartford, CT 06134-0308 | |
Fax: | 860-509-7359 |
E-Mail: | Dph.sourceprotection@ct.gov |
If you have questions about the public meeting, or other questions about the scoping for this project, contact:
Name: | Ms. Patricia Bisacky |
Agency: | Department of Public Health |
Drinking Water Section | |
Address: | 410 Capitol Avenue, MS #51WAT |
PO Box 340308 | |
Hartford, CT 06134-0308 | |
Phone: | 860-509-7333 |
Fax: | 860-509-7359 |
E-Mail: | Patricia.bisacky@ct.gov |
1. Post-Scoping Notice for the Southern Stony Brook Transmission Main Renewal Project
Municipality where project will be located: Montville
CEPA Determination: On August 7, 2012 the Department of Public Health (DPH) published a Notice of Scopingto solicit public comments for this project in the Environmental Monitor. Based on the comments provided by the Department of Energy & Environmental Protection (DEEP) on September 5, 2012, it has been determined that the project does not require the preparation of Environmental Impact Evaluation under CEPA. The DPH will coordinate with Norwich Public Utilities to ensure that the recommendations by the DEEP will be implemented.
The agency’s conclusion is documented in a Memorandum of Findings and Determination and an Environmental Assessment Checklist.
If you have questions about the project, you can contact the agency at:
Name: |
Mr. Eric McPhee |
Agency: |
Department of Public Health |
Drinking Water Section | |
Address: |
450 Capitol Avenue, MS #51WAT |
P O Box 340308 | |
Hartford, CT 06134-0308 | |
Phone: |
860-509-7333 |
Fax: |
860-509-7359 |
E-Mail: |
dph.sourceprotection@ct.gov |
What happens next: The DPH expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
2. Post-Scoping Notice for the Putnam Water Main Replacement
Municipality where project will be located: Putnam
CEPA Determination: On August 21, 2012 the Department of Public Health (DPH) published a Notice of Scopingto solicit public comments for this project in the Environmental Monitor.
Based on the comments provided by the Department of Energy & Environmental Protection (DEEP) on September 20, 2012, it has been determined that the project does not require the preparation of Environmental Impact Evaluation under CEPA. The DPH will coordinate with the Putnam Water Pollution Control Authority to ensure that the recommendations by the DEEP will be implemented.
The agency’s conclusion is documented in a Memorandum of Findings and Determination and an Environmental Assessment Checklist.
If you have questions about the project, you can contact the agency at:
Name: |
Mr. Eric McPhee |
Agency: |
Department of Public Health |
Drinking Water Section | |
Address: |
450 Capitol Avenue, MS #51WAT |
P O Box 340308 | |
Hartford, CT 06134-0308 | |
Phone: |
860-509-7333 |
Fax: |
860-509-7359 |
E-Mail: |
dph.sourceprotection@ct.gov |
What happens next: The DPH expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.
3. Post-Scoping Notice for State Buildings Space Needs in Hartford (Project No. BI-2B-358)
Municipality where project will be located: Hartford
CEPA Determination: On October 2, 2012 the Departments of Administrative Services (DAS) and Construction Services (DCS) published a Notice of Scoping to solicit public comments for this project in the Environmental Monitor.
The agencies have taken those comments into consideration and has concluded that the project does not require the preparation of Environmental Impact Evaluation under CEPA.
The agency's conclusion is documented in the Record of Environmental Consideration and Initial Environmental Review.
If you have questions about the project, you can contact the agency at:
Name: |
Shane Mallory, RPA, Administrator, Leasing and Property Transfer |
Agency: |
Department of Administrative Services |
Address: |
165 Capitol Avenue, Room G-1 |
Hartford, Connecticut 06106 | |
Phone: |
860-713-5682 |
Fax: |
860-713-7355 |
E-Mail: |
shane.mallory@ct.gov |
What happens next: The agencies expect the proposed action to go forward. This is expected to be the final notice of the proposed action to be published in the Environmental Monitor.
1. Notice of Environmental Impact Evaluation for Additional Source(s) of Water Supply for the University of Connecticut, Storrs, with revised Executive Summary, Extended Comment Period and 2nd Public Hearing
Municipalities where project is proposed: Mansfield and potentially Windham, Coventry, Tolland, Bolton, Manchester, East Hartford, South Windsor, and Vernon.
Project Description: The
Project Maps:
Click here to view maps of potential interconnection alternatives
Written comments on this EIE will be accepted until the close of business on:
December 21, 2012 EXTENDED TO JANUARY 4, 2013 EXTENDED TO JANUARY 31, 2013
The public can view a copy of this EIE at the following locations:
Office of the Town Clerk Office of the Town Clerk Office of the Town Clerk
Office of the Town Clerk Town Clerk’s Office Office of the Town Clerk
41 Center Street 4 South Eagleville Road 21 Tolland Green
Office of the Town Clerk Office of the Town Clerk
The EIE can also be viewed on line by clicking on the sections below:
1.0 EXECUTIVE SUMMARY - REVISED 11-16-12
2.0 CONSULTATION AND COORDINATION
5.0 ALTERNATIVE #1 – NO ACTION OR NO-BUILD
6.0 ALTERNATIVE #2 – REPLACEMENT OF WELL A AT THE FENTON RIVER WELLFIELD
7.0 ALTERNATIVE #3 – INTERCONNECTION WITH THE CONNECTICUT WATER COMPANY
8.0 ALTERNATIVE #4 – INTERCONNECTION WITH THE METROPOLITAN DISTRICT COMMISSION
9.0 ALTERNATIVE #5 – INTERCONNECTION WITH WINDHAM WATER WORKS
10.0 ALTERNATIVE #6 - NEW WELLFIELD ALONG THE WILLIMANTIC RIVER
11.0 ALTERNATIVE #7 - NEW WELLFIELD NEARBY MANSFIELD HOLLOW LAKE
12.0 SELECTION OF PREFERRED ALTERNATIVE
Appendix A Scoping Notices & Public Outreach
A public hearing was held on this EIE on:
DATE: Tuesday, December 11, 2012
TIME: 7:00 p.m.
PLACE: Room 146, UConn Bishop Center; One Bishop Circle; Storrs, CT
A second public hearing will be held on this EIE on:
DATE: Tuesday, January 22, 2013
TIME: 7:00 p.m.
PLACE: Human Resources Training Room, UConn Health Center Munson Building; 16 Munson Road; Farmington, CT, 06032
Written comments should be sent to:
Name: Jason M. Coite
Agency:
Address:
Phone: 860-486-9305
Fax: 860-486-5477
Email: jason.coite@uconn.edu
If you have questions about the public hearing, or other questions about the EIE, contact Mr. Coite as directed above.
2. Notice of EIE for Extension of Public Water System from Middletown to Durham
Municipalities where project is proposed: Middletown, Durham and Middlefield
Project Description: The Department of Energy and Environmental Protection (DEEP), in association with the Town of Durham, proposes to extend public water service from the City of Middletown into areas of the Town of Durham to address groundwater contaminated by the Durham Meadows Superfund site and other contaminated areas in the vicinity of the Superfund site. There are several homes in Durham with contaminated drinking water wells that are currently using in-home filter systems to remove the contaminants. The proposed permanent solution is to extend Middletown’s water supply transmission piping and interconnections along Route 17 into Durham. The action also includes installation of a water storage tank at Cherry Hill in the City of Middletown and the provision of fire protection to areas of Durham.
Project Map(s): Click here to view a map depicting the route of the water line and potential areas to be served.
Comments on this EIE will be accepted until the close of business on: February 1, 2013.
The public can view a copy of this EIE at:
Town Clerk's Office
Durham Town Hall
30 Town House Road
Durham, Connecticut 06422
or
Durham Public Library
7 Maple Ave.
Durham, CT 06422
The EIE can also be found online at the DEEP website by clicking here.
Any person can ask the sponsoring agency to hold a Public Hearing on this EIE by sending such a request to the address below by December 28, 2012. If a hearing is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Energy & Environmental Protection must schedule a Public Hearing.
Send your comments about this EIE to:
Name: |
Jing Chen |
Agency: | Department of Energy & Environmental Protection |
Remediation Division |
|
Address: | 79 Elm Street |
Hartford, CT 06106-5127 | |
Phone: | 860-424-3391 |
Fax: | 860-424-4057 |
E-Mail: | jing.chen@ct.gov |
If you have questions about a public hearing, or where you can review this EIE, or similar matters, please contact Ms. Chen as directed above.
The Department of Energy and Environmental Protection is an affirmative action/equal opportunity employer and service provider. In conformance with the Americans with Disabilities Act, DEP makes every effort to provide equally effective services for persons with disabilities. Individuals with disabilities who need this information in an alternative format, to allow them to benefit and/or participate in the agency’s programs and services, should call 860-424-3035 or e-mail the ADA Coordinator, at DEEP.aaoffice@CT.Gov. Persons who are hearing impaired should call the State of Connecticut relay number 711.
Download the free Acrobat Reader!
Access.Adobe is a tool that allows blind and visually impaired users to read any documents in Adobe PDF format. For more information, read the product overview at Adobe.com .
Copyright 2012, Connecticut Council on Environmental Quality