Scoping Notices
Environmental Impact Evaluations available for review and comment
Scoping Notices
EIE Notices
1. Notice of EIE for Rentschler Field Infrastructure Improvements
Municipality where project is proposed: East Hartford
Address of Possible Project Location: Rentschler Field
Project Description: The Connecticut Department of Economic and Community Development (DECD) has prepared an Environmental Impact Evaluation (EIE) in accordance with the Connecticut Environmental Policy Act (CEPA). The Proposed Action is the award of State funding for the following activities associated with the redevelopment of Rentschler Field in East Hartford, Connecticut.
- Construction of long term transportation improvements at the Roberts Street/Silver Lane/proposed East Hartford Boulevard North intersection;
- Construction of long term transportation improvements at the I-84 westbound off ramp at Roberts Street;
- Design and Construction of long term transportation improvements in the Route 2/Brewer/Main/ High Streets/ East Hartford Boulevard South area;
- Development of existing United Technologies Corporation (UTC) land as permanent Stadium parking areas; and
- Construction of an access road leading to the new East Hartford-Glastonbury Elementary Magnet School (EHGEMS).
These proposed activities are depicted in Figure ES-1. The EIE presents the potential environmental impacts of these direct actions as well as the indirect action of redeveloping Rentschler Field with approximately 5.7 million square feet of mixed use development.
Project Map: click here to view a map of the project area
Comments on this EIE will be accepted from October 6, 2006 until the close of business on November 20, 2006.
The public can view a copy of this EIE which will be available from October 6, 2006 at:
-
City Clerk’s Office, 740 Main Street, East Hartford, CT 06108
-
Raymond Library, 840 Main Street, East Hartford, CT 06108
-
East Hartford Community Cultural Center, 50 Chapman Place, East Hartford, CT 06108
-
DECD, 505 Hudson Street, Hartford, CT 06106
There is a public hearing scheduled for this EIE on:
DATE: November 9, 2006
TIME: 6:30 PM
PLACE: Town Council Chamber, 740 Main Street, East Hartford, CT 06108
Additional information about this project can be found online at: https://www.ct.gov/ecd
Send your comments about this EIE to:
Name: | Peter Simmons, P.E. |
Agency: | Department of Economic and Community Development |
Address: | 505 Hudson Street |
Hartford, CT 06106-7106 | |
E-Mail: | peter.simmons@po.state.ct.us |
If you have questions about the public hearing, or where you can review this EIE, or similar matters, please contact :
Name: | Maya Loewenberg, M.S. |
Agency: | Department of Economic and Community Development |
Address: | 505 Hudson Street, Hartford, CT 06106-7106 |
E-Mail: | maya.loewenberg@po.state.ct.us |
2. Notice of EIE for New Milford Wastewater Treatment Facility Upgrade
Municipality where project is proposed
: New Milford
Project Description: The Town of New Milford has proposed modifications to its wastewater treatment facility in accordance with the facilities planning document prepared by Earth Tech, “Wastewater Facilities Plan, Town of New Milford, Connecticut, October 15, 2001,” with revisions dated May 2005 and March 2006. Specifically, the proposed work will include modifications to the headworks, raw pumps, primary tanks, and aeration tanks; addition of aeration tankage; expansion of secondary clarification; modifications for nitrogen removal; replacement of the chlorination/dechlorination disinfection system with ultraviolet disinfection; flow monitoring modifications; odor control improvements; and sludge handling and thickening improvements, as recommended in the report.
The proposed expansion of average daily design capacity from 1 to 2 million gallons per day and treatment upgrade work is to satisfy service area growth issues and the need to provide advanced wastewater treatment for nutrient removal. There are significant expansions of the sewer system being constructed along Route 7 south to the Brookfield town line. Significant connections have recently been made causing flows and loads to the wastewater treatment facility to increase to near capacity. The project will result in improved plant efficiency and reliability as well as positive environmental benefits of improved water quality to the Housatonic River and Long Island Sound.
Project Map: Click here to view a map of the project area.
Comments on this EIE will be accepted until the close of business on: October 20, 2006
The public can view a copy of this EIE at:
Department of Environmental Protection
Water Protection & Land Reuse Bureau
Municipal Facilities Section (2nd Floor)
79 Elm Street, Hartford, CT 06106
or at the office of the
New Milford Town Clerk
Town Hall
10 Main St.
New Milford, CT 06776
A link to the EIE can also be found online at the DEP website: http://dep.state.ct.us/eie/index.htm
Any person can ask the sponsoring agency to hold a Public Hearing on this EIE by sending such a request to the address below by September 15, 2006. If a hearing is requested by 25 or more individuals, or by an association that represents 25 or more members, the Department of Environmental Protection must schedule a Public Hearing.
Send your comments about this EIE to:
Name: | Rowland C. Denny |
Agency: | Department of Environmental Protection |
Water Protection & Land Reuse Bureau | |
Address: | 79 Elm St. |
Hartford, CT 06106 | |
E-Mail: | rowland.denny@po.state.ct.us |
Phone: | (860) 424-3749 |
Fax: | (860) 424-4067 |
If you have questions about a public hearing, or where you can review this EIE, or similar matters, please contact Rowland Denny as directed above.
Municipality where project is proposed: New Haven
Project Description: On
The proposed project consists of the construction and consolidation of Gateway Community College to Downtown New Haven. The preferred site for the proposed project is at 2 and 20 Church Street on two parcels formerly known respectively as Macy’s and Malley’s. The proposed site is bounded by Crown Street, Church Street, North Frontage Road, and Temple Street. The proposed project involves the construction of approximately 360,000 gross square feet of building space for the College, including a garage for approximately 600 spaces to be located on site; however, it is not expected to accommodate the Automotive Technology program due to cost constraints.
In addition to the on-site parking garage, a minimum of 600 spaces would be provided by the City of New Haven in the adjacent Temple Street Garage.
The proposed facility is expected to accommodate classrooms, laboratories, academic and administrative offices, a library, study areas, general use areas (e.g. dining, bookstore, day care, student activities), and support services (e.g. storage, mailroom, media production, etc.). During pre-design, it was determined that implementation of the plan for total consolidation immediately may not be feasible due to cost constraints. Therefore, the Automotive Technology program and some associated classes/programs will remain at the North Haven Campus for the short-term future. Any long-term solution will be assessed by the Board of Trustees for the Connecticut Community-Technical Colleges (BOT-CTC) in terms of its applicability to potential environmental affects.
Project Location Map: Click here to view the existing locations of GCC and to view the proposed project location.
Comments on this Amended EIE will be accepted until the close of business on:
The public can view a copy of this Amended EIE at:
GCC’s Long Wharf Campus Library, 60 Sargent Drive, New Haven |
GCC’s North Haven Campus Library, 88 Basset Road, North Haven |
GCC’s web site: www.gwcc.commnet.edu |
New Haven City Clerk’s Office, 200 Orange Street, New Haven |
New Haven Main Branch Free Public Library, 133 Elm Street, New Haven |
North Haven Town Clerk’s Office, 18 Church Street, North Haven |
North Haven Memorial Library, 17 Elm Street, North Haven |
· BBOT-CTC, 61 Woodland Street, Hartford |
Connecticut Department of Public Works, 165 Capitol Avenue, Room 275, Hartford |
There is one (1) public hearing scheduled for this Amended EIE on:
DATE:
TIME: 7:00 pm (the hearing will conclude at the end of public comments)
PLACE: GCC – Long Wharf Campus, Room 160, 60 Sargent Drive, New Haven
NOTES: Doors open at 6:30 pm
DIRECTIONS: http://www.gwcc.commnet.edu/directions.html
Send your comments about this Amended EIE to:
Name: |
Ms. Lenell Kittlitz, Director of Facilities Planning |
Agency: |
Board of Trustees of Connecticut Community-Technical Colleges |
Address: |
61 Woodland Street |
|
Hartford, Connecticut 06105 |
Fax: |
(860) 566-6624 |
E-Mail: |
If you have questions about the public hearing, where you can review this Amended EIE, or similar matters, please contact:
Name: |
Emilio Pizzoferrato, Project Manager |
Agency: |
Department of Public Works |
Address: |
165 Capitol Avenue, Room 460 |
E-Mail: |
|
Phone: |
(860) 713-5943 |
Additional project information can be found here: http://www.gwcc.commnet.edu/gateway_site/index.html
Download the free Acrobat Reader!
Access.Adobe is a tool that allows blind and visually impaired users to read any documents in Adobe PDF format. For more information, go to Welcome to Access.Adobe.Com
Copyright 2006, Connecticut Council on Environmental Quality