1) Notice of Scoping for Ramp Widening of I-95 NB Exit 27A to Route 8 NB

Municipality where proposed action might be located: Bridgeport

Project Description: A study along the corridor of Interstate 95 (I-95) west of New Haven investigated the feasibility of constructing an additional through lane in each direction from Greenwich to Bridgeport. As a result of the study, it was determined that several smaller projects with independent utility can be initiated to improve conditions at several locations along the corridor.

The purpose of this project is to relieve traffic congestion and minimize crashes on I-95 NB by increasing the exiting capacity of Exit 27A through the addition of an auxiliary lane. Currently, the vehicle queue lengths for the Exit 27A off-ramp extend upstream past the Exit 27 off-ramp to Myrtle Ave. Exit 27A has a single lane that is approximately one mile in length and opens up to two lanes once beyond the gore area of the exit. Average Traffic Daily (ADT) volumes from 2019 indicate 26,400 daily vehicles exiting I-95 NB via Exit 27A.

The project proposes to provide an additional exit lane from I-95 NB to Exit 27A. This will require the widening of Bridge No. 03532, which carries Exit 27A from I-95 NB to Route 8 over Warren street and South Frontage Road.  Since Bridge No. 03532 ties into the same western abutment as Bridge No. 00107 (I-95 NB over Warren Street)  and due to the complexity of the existing design, a portion of Bridge No. 00107 will also require steel framing and concrete deck modifications.

 

The Maintenance and Protection of Traffic and Construction Sequencing are anticipated to include an extended road closure of South Frontage Road and Warren Street at the project location to facilitate widening of Bridge No. 03532. Traffic detours are expected (see link to proposed plans) along with traffic alterations of adjacent local roads. Traffic on the I-95 NB Exit 27A off-ramp will require lane shifts to accommodate bridge work, but a long duration ramp closure is not anticipated.


Project Maps: Click here to view a locus map and aerial of the project area.

Click here to view the proposed project plans.

 

Written comments from the public are welcomed and will be accepted until the close of business on: November 10, 2020

There will be a virtual Public Scoping Meeting for this proposed action:

DATE: Tuesday October 27, 2020

TIME7:00 p.m.

PLACE: Virtual Meeting

NOTES: The meeting will be live streamed via Microsoft Teams Live Event and YouTube Live. A Question and Answer session will immediately follow the presentation.  A link to join the virtual meeting will be available at the following location:  https://portal.ct.gov/DOTBridgeport15-382


Individuals with limited internet access may request that project information be mailed to them by contacting Ryan D. Martin by email at Ryan.Martin@ct.gov or by phone at (860) 594-3205. Allow one week for processing and delivery.

Individuals with limited internet access can listen to the meeting by calling 800-369-2192 and entering the Participant Code: 6929067 when prompted.

Persons with hearing and/or speech disabilities may dial 711 for Telecommunications Relay Services (TRS).  Language assistance may be requested by contacting the CTDOT's Language Assistance Call Line (860) 594-2109.  Requests should be made at least 5 business days prior to the meeting. Language assistance is provided at no cost to the public and efforts will be made to respond to timely requests for assistance.

The MS Teams Live Event offers closed-captioning for the hearing impaired and non-English translation options.  A recording of the formal presentation will be posted to YouTube following the meeting and closed-captioning (including non-English translation options) will be available at that time.  The recording of the presentation will also be posted within 7 days on CTDOT's virtual public meetings website at the following location: https://portal.ct.gov/dot/general/CTDOT-VPIM-Library

Comments and questions about the meeting or project (email preferred) should be sent to:

Name: Ryan D. Martin, Project Engineer

Agency: Connecticut Department of Transportation, Bureau of Engineering and Construction

Address: 2800 Berlin Turnpike, Newington, CT 06131

E-Mail: DOTProject0015-0382@ct.gov


Individuals may also leave a voicemail question or comment by calling (860) 944-1111. Please reference Project No. 15-382 in your voicemail.


Inquiries and requests to view and or copy documents, pursuant to the Freedom of Information Act, must be submitted to the sponsoring state agency:

Name: Ms. Alice M. Sexton

Agency: Connecticut Department of Transportation, Office of Legal Services

Address: 2800 Berlin Turnpike, Newington, CT 06131

E-Mail: Alice.Sexton@ct.gov


What Happens Next: The Connecticut Department of Transportation will make a determination whether to proceed with preparation of an Environmental Impact Evaluation (EIE) or that the project does not require the preparation of an EIE under the Connecticut Environmental Policy Act (CEPA). A Post-Scoping Notice of its decision will appear in a future edition of the Environmental Monitor.