Weatherization Documentation Archives

Connecticut Weatherization Assistance Program Archived Materials

The following documents have been superseded and are being provided here for reference only. If you have any questions or issues or would like copies of this documentation or any other previous editions, please email: DEEP.Weatherization@ct.gov

Program Plans (PY 2025)
Manuals and Guides (PY 2018 - PY2025)
Energy Model Updates (PY 2025)
  • NEAT Libraries (2025)
    • Community Renewal Team (CRT)
    • Center for EcoTechnology (CET)
  • MHEA Libraries (2025)
    • Center for EcoTechnology (CET
    • Community Renewal Team (CRT)
State Specific Guidance (PY2012 - PY 2025)
  1. Primary and Storm Window and Door Replacements
  2. Weatherization of Multi-Family Dwellings
  3. Implementation of DOE Lead-Safe Weatherization and EPA's Lead Renovation and Repair Policy (LRRP)
  4. Insulation Certificate for Clients and Dates
  5. Compliance With DOE Historic Preservation
  6. Compliance With SHPO-CTWAP-OPM Historic Preservation Agreement
  7. Use of Sidewall Insulation Waiver
  8. Landlord Contribution to CT WAP Weatherization
  9. Audit and Completion Timeline for Weatherization Work
  10. Payments to Subcontractors for Weatherization Work
  11. Verification of Eligibility Status
  12. Thermostat Installation
  13. Audit Input Into NEAT/MHEA Audit Tool Software
  14. Audit Preparation Dates
  15. Inspection Requirements and "Go-Backs"
  16. Use of Standard Quote Form for Heating System Replacement
  17. Inputting Vacant and Ineligible Multi-Family Units Into Audit Tool Software
  18. Air Sealing and How to Calculate the MVG
  19. The Use of the Individual SIR in the CT WAP Program
  20. Installation of Smoke and Carbon Monoxide Detectors
  21. Primary Heating Systems, Domestic Hot Water Systems, and Deliverable Fuel Tanks
  22. Written Response to Corrective Actions in Monitoring Reports
  23. Desk Monitoring of BWR's and Potential for Temporary Disallowances
  24. Communication of Hazard and Work Site Flow
  25. Communication of Hazard and Work Site Flow (Alternative)
  26. Completion Certificates for Clients
  27. Updated Guidance on EPA LRRP
  28. Reallocation of Program Support Credits to Materials Budget Category
  29. Updated Primary Heating Systems, Domestic Hot Water Systems, and Deliverable Fuels
  30. Client Intake for WAP
  31. Debarment Checks in CT WAP
  32. Waitlist and Priorities
  33. Energy Star Rated Appliance Replacement Policy Update
  34. ASHRAE 62.2-2016 DOE WAP Compliance
  35. Wi-Fi Enabled Devices
  36. Notification of Quality Control Inspection Policy
  37. Self-Certification and Proof of Eligibility
  38. Health and Safety Intake Survey for CT WAP
  39. Reimbursement for Heating System Replacements
  40. Radon Disclaimer (2018)
  41. Site-Specific Assessment Regarding Excessive Storage Conditions
  42. Policy and Procedure When Using WAv8.9 Audit Tool
  43. Policy and Procedure for Audit Tool Quality Assurance and Quality Control Inspections
  44. Classifications and Definitions of Building Space
  45. Inspection and Assessment of Inoperable Heating Systems
  46. Policy and Procedure on Daily Test-In and Test-Out 
  47. Planning for Statewide Emergencies
  48. Policy and Procedure Regarding WAP Communications
  49. Policy and Procedure Regarding Approved Setup Libraries in WAv8.9 Audit Tool
  50. Policy and Procedure Regarding Utilizing WAv8.8 Audit Tool
  51. Policy and Procedure Regarding Specifications for HVAC Replacement
  52. Policy and Procedure Regarding Quality Assurance and Quality Control Inspections
  53. Updated Policy and Procedure Regarding ASHRAE 62.2 - 2016 
  54. Policy and Procedure Regarding Clothes Dryer Appliance Exhaust Ventilation
  55. Updated Policy Regarding Window and Door Repair and Replacements
COVID-19 Updates and Documents (PY 2021 - 2022)
  1. Health and Safety Protocols for Weatherization Programs
  2. Updated Health and Safety Protocols for Weatherization Programs
  3. Health and Safety Guidelines - Phase 2
  4. WAP COVID - "Back To Work" - FAQ
  5. Updated Work Clothing Advisory
State Specific Forms and Documents (PY 2012 - 2025)
  1. Air Sealing Work Order
  2. ASHRAE 62.2 - 2013 Whole Home Ventilation Calculator
  3. Burner Combustion Efficiency Report
  4. Carbon Monoxide Disclaimer
  5. Connecticut Combustion Appliance Safety Inspections and Testing
    1. Worst-Case CAZ
  6. Data Collection Form
    1. Steps to a Good Energy Audit
  7. CT WAP Electrical Inspection Form
  8. Input Sheet / Work Order
  9. ASHRAE 62.2 - 2013 Checklist
  10. Health and Safety Disclaimer
  11. Sample Renovation Record Keeping Checklist
  12. Moisture / Mold Assessment Action Plan Steps
  13. Mold Disclaimer
    1. EPA Guide to Mold, Moisture, and Your Home
  14. Notice of Postponement of Services
  15. EPA Lead-Safe Certified Guide to Renovate Right
  16. Sidewall Insulation Waiver
  17. Smoke / CO Detector Disclaimer
  18. OSHA Quick Card: Protect Yourself from Carbon Monoxide Poisoning
  19. Weatherization Agreement
  20. Weatherization Waiver Request
  21. Weatherization Field Visit Form
  22. Waiver and Release of Liability and Indemnity Agreement
  23. Insulation Certificate
  24. Energy Audit Data Collection Form
  25. Historic Preservation Compliance Chart
  26. Sample Pre-Renovation Form
  27. United Inch Best Practices
  28. Weatherization Heating System Standard Quote Form
  29. Weatherization Heating System Standard Quote Form (Alternative)
  30. Training and Technical Assistance Retention Agreement
  31. OSHA Fact Sheet: Confined Spaces in Construction: Crawl Spaces and Attics
  32. Weatherization Client File Checklist
  33. QCI Final Inspection Form 
  34. QCI Inspection Report
  35. Weatherization SHPO Agreement (2030) (PA with Attachments)
  36. Weatherization Pre-Entry Hazard Assessment
  37. Confined Space Entry Program Template
  38. Confined Space Entry Program Template (Alternative)
  39. Weatherization Intake Form
  40. Weatherization Client Health and Safety Intake Survey
  41. Radon Disclaimer
  42. EPA's "A Citizen's Guide to Radon"
  43. Certification of Zero Income Form
  44. QCI Final Inspection Checklist
  45. Weatherization Daily Test-In and Test-Out Form
  46. Weatherization Quality Assurance Inspection Report
  47. Weatherization State Monitoring Form
US Department of Energy Notices and Memorandums

Link to DOE documentation page

National Association for Community Services Programs (NASCSP)

Link to NASCSP documentation page

 

 

Updated March 2026