OLD SAYBROOK
DOCKET NO. 1 - Connecticut Light and Power Company Certificate for the construction of a 115-kV overhead power line between Branford and Old Saybrook, Connecticut. (Decision and Order). First Amendment - (Decision and Order). Second Amendment - (Opinion) and (Decision and Order). Third Amendment - (Decision and Order).
DOCKET NO. 20 - National Railroad Passenger Corporation Certificate for three, one hundred-foot antenna poles on railroad property in Guilford, New London, and Old Saybrook, Connecticut. Application returned.
DOCKET NO. 51 - Southern New England Telephone Company Certificate for a tower to provide cellular telephone service off Ingham Hill Road, Old Saybrook. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 69 - Metro Mobile CTS of Hartford, Inc. Certificate for facilities to provide cellular service in Killingworth, Middletown, and off Middlesex Turnpike in Old Saybrook. (Findings of Fact), (Opinion), (Consenting/Dissenting Opinions), and (Decision and Order).
DOCKET NO. 411 - SRR Towers, LLC New Cingular Wireless PCS, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance and management of a telecommunications facility located at 1363 Boston Post Road, Old Saybrook, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order).
PETITION NO. 25 - Connecticut Light and Power Company petition for an overhead transmission line between Branford and Old Saybrook. Denied-Application to modify Cert. reqired. 12/13/73
PETITION NO. 47 - National Passenger Corporation (Amtrak) petition for four 100-foot high steel monopole telecommunications towers within Amtrak’s right-of-way located off Hallock Avenue, New Haven; off Whitfield Street, Guilford, east of the Boston Post Road overpass, Old Saybrook; and near Hamilton Street and Smith Street, New London. Denied 11/30/79
PETITION NO. 327 - Metro Mobile CTS of Hartford, Inc. petition for proposed installation of cellular antennas and associated equipment on an existing chimney stack at 2 Ferry Place, Old Saybrook. Staff Report. Approved 8/9/94
PETITION NO. 498 - Springwich Cellular Limited Partnership petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modifications to an existing Connecticut Light and Power Company electric line structure located at Ferry Road, Old Saybrook, Connecticut. Staff Report. Acknowledged 3/1/01.
PETITION NO. 551 - Omnipoint Communications, Inc. petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing communications tower located off Route 1 between River Street and Ford Drive, Old Saybrook, Connecticut. Staff Report. Approved 04/25/02.
PETITION NO. 601 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the replacement and relocation of an existing telecommunications facility located at 130 Ingham Hill Road, Old Saybrook, Connecticut. Staff Report. Approved 01/08/03.
PE1133-VER-20150611 – Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 1363 Boston Post Road, Old Saybrook, Connecticut. Decision Letter. Partial Completion/Notice Not to Complete Remaining Modifications
PETITION NO. 1191 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing industrial building located at 8 Custom Drive, Old Saybrook, Connecticut. Decision Letter and Staff Report. Approved 11/12/15.
PETITION NO. 1206 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing commercial building located at the Old Saybrook Shopping Center, 665 Boston Post Road, Old Saybrook, Connecticut. Staff Report and Decision Letter Will Not Construct Approved 01/21/16.
SUB-PETITION NO. 1293-(HCDREOS) (Haddam, Chester, Deep River, Essex and Old Saybrook) - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Amendment and Council Decision Extension Request and Council Decision 3rd Extension Request and Council Decision Completion Letter
SUB-PETITION NO. 1293-HCDREOS-02 (Haddam, Chester, Deep River, Essex and Old Saybrook)– Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Amendment Council Decision on Amendment Extension Request and Council Decision Construction Complete
PETITION NO. 1336 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed modifications to an existing wireless telecommunications facility located at 8 Custom Drive, Old Saybrook, Connecticut. Approved 12/21/2017
PETITION NO. 1344 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of approximately 11 miles of its existing No. 1342 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between the existing Green Hill Substation located at 775 Green Hill Road in Madison and the existing Bokum Substation located at 49 Bokum Road in Old Saybrook, Connecticut, traversing Madison, Killingworth, Clinton, Westbrook, Essex and Old Saybrook, and related electric transmission line structure improvements. Approved 7/19/18
PETITION NO. 1529 – American Tower Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Approved 9/15/22
SNET Cellular, Inc. - Notice Pursuant to Regulations of State Agencies 16-50j-73 of Intent to Modify Exempt Towers and Associated Equipment operated by SNET Cellular, Inc., located on Aspetuck Ave., New Milford; off Fairfield Dr., Newtown; 405 Brushy Plain Rd., Branford; 4 Hoffmann Rd., Canton; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; 170 Ingham Hill Rd., Old Saybrook; 391 Niederwerfer Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr., Waterbury; Miner La., Waterford; 180A Bayberry La., Westport, Connecticut.
Bell Atlantic NYNEX Mobile - Antenna Upgrades - 2 Clark Street, Old Saybrook East, Connecticut. November 22, 1995 Antenna Upgrade Filing
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located off Ingham Hill Rd., Old Saybrook.
EM-SCLP-106-980709 - Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 170 Ingham Hill Road in Old Saybrook.
TS-VOICESTREAM-106-000808 - VoiceStream Wireless request for an order to approve tower sharing at an existing telecommunications tower located off Middlesex Turnpike (Route 9), Old Saybrook, Connecticut.
EM-BAM-106-000818 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 2 Ferry Place, Old Saybrook, Connecticut.
EM-AT&T-106-020319 - AT&T Wireless notice of intent to modify an existing telecommunications facility located at 40-3 River Street, Old Saybrook, Connecticut.
EM-CING-026-027-045-076-106-152-020702 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Chester, Clinton, East Lyme, Madison, Old Saybrook, and Waterford.
EM-NEXTEL-106-027031 - Nextel Communications, Inc. notice of intent to modify an existing telecommunications facility located at 40-3 River Road, Old Saybrook, Connecticut.
EM-T-MOBILE-"UNIVERSAL"-020830 - Omnipoint Facilities Network 2., L.L.C. and Omnipoint Communications, Inc., subsidiaries of T-Mobile USA, Inc. notice of intent to modify existing telecommunications facilities throughout Connecticut.
EM-VER-106-050428 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 170 Ingham Hill Road, Old Saybrook, Connecticut.
EM-CING-034-015-083-106-060828 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 36 Sugar Hollow Road, Danbury; 1875 Noble Avenue, Bridgeport; 90 Industrial Park Road, Middletown; 430 Middlesex Turnpike, Old Saybrook; and 130 Inham Hill Road, Old Saybrook, Connecticut.
EM-CING-043-059-076-089-089-106-070703 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1455 Forbes Street, East Hartford; 68 Groton Long Point Road, Groton; 8 Old Route 79, Madison; 167 Lester Street, New Britain; 200 Stanley Street, New Britain and 170 Ingham Hill Road, Old Saybrook, Connecticut.
EM-VER-106-150108 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 170 Ingham Hill Road, Old Saybrook, Connecticut. Decision.Extension Request and CSC Approval. Completion Letter.
EM-T-MOBILE-106-161123 - T-Mobile notice of intent to modify an existing telecommunications facility located at 170 Ingham Hill Road, Old Saybrook, Connecticut. DecisionCompletion Letter
EM-AT&T-106-161206 - AT&T notice of intent to modify an existing telecommunications facility located at 226 Ferry Road, Old Saybrook, Connecticut. DecisionCompletion Letter
EM-T-MOBILE-106-200609 – T-Mobile notice of intent to modify an existing telecommunications facility located at 170 Ingham Hill Road, Old Saybrook, Connecticut. Decision Notice of Completion
EM-CING-106-201201 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at Ingham Hill Road (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Decision Notice of Completion
TS-DISH-106-210621 - DISH Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 430 Middlesex Turnpike, Old Saybrook, Connecticut. Town Letter Incomplete Notice Extension Request and Council Extension Approval Mount Analysis 2nd Incomplete Letter Request for Extension and Council Approval 2nd Request for Extension and Council Approval 3rd Request for Extension and Council Approval Decision - Denied
EM-T-MOBILE-106-210810 - T-Mobile notice of intent to modify an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Decision Notice of Completion
EM-AT&T-106-210922 - AT&T notice of intent to modify an existing telecommunications facility located at 226 Ferry Road, Old Saybrook, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Extension Approval Additional Extension Request and Council Extension Approval
EM-VER-106-210927 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 19 Main Street, Old Saybrook, Connecticut. Incomplete Letter Structural Analysis Council Acknowledgement Town Comment Decision Notice of Completion
TS-DISH-106-211022 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 1363 Boston Post Road, Old Saybrook, Connecticut. Town Letter Incomplete Letter Extension Request and Council Decision Response to Incomplete and Council Acknowledgement Decision
EM-VER-106-211118 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Town Comment Decision Extension Letter and Council Approval
TS-DISH-106-211119 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Town Letter Town Comment Supplemental Submission Decision Notice of Completion
EM-T-MOBILE-106-211217 – T-Mobile notice of intent to modify an existing telecommunications facility located at Middlesex Turnpike (a/k/a 156 Bokum Road), Old Saybrook, Connecticut. Decision Extension Request and Council Extension Approval Notice of Construction Commencement Notice of Construction Completion
TS-DISH-106-220106 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 430 Middlesex Turnpike, Old Saybrook, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Completion
EM-T-MOBILE-106-220110 - T-Mobile notice of intent to modify an existing telecommunications facility located at Middlesex Turnpike (a/k/a 156 Bokum Road), Old Saybrook, Connecticut. Decision Notice of Completion
EM-VER-106-220114 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Ingham Hill Road (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Decision
EM-T-MOBILE-106-220318 - T-Mobile notice of intent to modify an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Decision Notice of Completion
EM-CING-106-220329 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at Ingham Hill Road (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Decision Notice of Completion
EM-VER-106-221005 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1363 Boston Post Road, Old Saybrook, Connecticut. Decision Condition 2 and 3 Submission Updated RF Report Notice of Construction Cancellation
EM-T-MOBILE-106-230526 – T-Mobile notice of intent to modify an existing telecommunications facility located at Ingham Hill Road (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Decision Notice of Construction Completion
EM-EVER-106-230627e – Eversource Energy notice of intent to modify an existing energy facility located at 49 Bokum Road, Old Saybrook, Connecticut. Decision Request for Temporary Project Change and Council Decision Extension Request and Council Extension Approval
TS-ATT-106-230713 – AT&T request for an order to approve tower sharing at an existing telecommunications facility located at 40 River Street, Old Saybrook, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Extension Approval Notice of Construction Completion
EM-T-MOBILE-106-230913 - T-Mobile notice of intent to modify an existing telecommunications facility located at 44 Ford Drive, Old Saybrook, Connecticut. Decision
EM-VER-106-231003 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 77 Springbrook Road, Old Saybrook, Connecticut. Incomplete Letter Response to Incomplete Council Acknowledgement Decision Notice of Construction Commencement Notice of Construction Completion
EM-VER-106-240416 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at Ingham Hill Road (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Commencement
EM-VER-106-240419 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 19 Main Street, Old Saybrook, Connecticut. Decision Notice of Construction Commencement
EM-T-MOBILE-106-240515 - T-Mobile notice of intent to modify an existing telecommunications facility located at Ingham Hill Road, (a/k/a 170 Ingham Hill Road), Old Saybrook, Connecticut. Decision