train passing wetlands

ENVIRONMENTAL MONITOR
The official site for project information under
the Connecticut Environmental Policy Act

July 8, 2008
Scoping Notices
   1. Danbury Branch Rail Line Alternatives Analysis, Fairfield and
       Litchfield Counties
Environmental Impact Evaluations
   1. NEW! Branford Shore Line East Railroad Station
   2. Improvements to the New Haven Rail Yard Maintenance Facility
   
State Land Transfers

   There are no state land transfers posted for public notice or comment in this edition.

The next issue will be published on July 22, 2008.
Subscribe to e-alerts to receive an e-mail when The Environmental Monitor is published.

Scoping Notices
Scoping Notices have been issued for the following state projects.  These projects are in the earliest stages of planning.  At the scoping stage, detailed information on a project's design, alternatives, and environmental impacts does not yet exist.  Sponsoring agencies are asking for comments from other agencies and from the public as to the scope of alternatives and environmental impacts that should be considered for further study.  Send your comments to the contact person listed for the project by the date indicated.

 1. Notice of Scoping - Danbury Branch Rail Line Alternatives Analysis

Municipalities where proposed project will be located: New Milford, Brookfield, Danbury, Bethel, Redding, Ridgefield , Wilton, Norwalk

Project Description: The project is for proposed improvements to the Danbury Branch of the New Haven Rail Line, an existing single-track railroad between South Norwalk and Danbury, approximately 23.6 miles in length, which is owned by the Connecticut Department of Transportation, and the possible extension of passenger service on about 14.3 miles of existing single track railroad between Danbury and New Milford , which is owned by the Housatonic Railroad Company, Inc. The study will occur in the counties of Fairfield and Litchfield.

Project Map Click here to view a map of the project area.

Written comments from the public are welcomed and will be accepted until the close of business on:July 25, 2008.

Public Scoping Meetings for this study have been scheduled as follows:

  •      June 17, 2008: New Milford Town Hall (Paul Martin Conference. Room), 10 Main Street New Milford, CT.
  •      June 18, 2008: Wilton Town Hall (Annex Building Meeting Room A), 238 Danbury Road , Wilton, CT 
  •      June 19, 2008: Ridgefield Town Hall (Large Conference Room), 400 Main Street, Ridgefield, CT.

The study team will be available at 6:00 p.m., at each of these public meetings, with a brief presentation beginning at 7:00 p.m.

Written comments may be addressed to:

Name: Mr. Carmine P. Trotta
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike
Newington, CT 06131
Tel:

860-594-2157

If you have questions about the public meeting, wish to review additional information, or have other questions about the scoping for this project, contact:

Name: Mr. Andrew Davis
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike
Newington, CT 06131
Phone:

860-594-2157

Fax: 860-594-3028
E-Mail: Andrew.H.Davis@po.state.ct.us

The agency expects to release a Draft Environmental Impact Evaluation for this project, for public review and comment, in July, 2011.


EIE Notices
The following Environmental Impact Evaluations (EIEs) have been completed by state agencies and are available for review and comment. 

1. Notice of EIE for the Branford Shore Line East Railroad Station

Municipality where project is proposed: Branford, CT

Address of Possible Project Location: 39 Maple Street Branford, CT

Project Description: Infrastructure improvements to the Branford Shore Line East Railroad Station including a new north-side high level rail platform, a new pedestrian bridge over the active rail line connecting the north-side and south-side platforms and new, expanded surface parking.   

Project Map:   Click here to view a schematic of the station site plan.

                     Click here to view a schematic of the parking facility.

Comments on this EIE will be accepted until the close of business on : August 21, 2008

The public can view a copy of this EIE at: The Branford Town Clerk's Office - 1019 Main Street Branford, CT 06405, The James Blackstone Memorial Library - 758 Main Street  Branford, CT, 06405, The Connecticut Department of Transportation - 2800 Berlin Turnpike, Room 2155, Newington, CT 06131, The South Central Regional Council of Governments - 127 Washington Avenue, 4th floor west, North Haven, CT 06473-1715.  

There is a public hearing scheduled for this EIE on:

DATE:   Thursday August 7, 2008 

TIME:   7:00 pm

PLACE: James Blackstone Memorial Library Auditorium

Send your comments about this EIE to:

Name: Edgar Hurle - Transportation Planning Director
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike, Newington, CT 06131
E-Mail: Edgar.Hurle@po.state.ct.us

If you have questions about the public hearing, where you can review this EIE, or similar matters, please contact :

Name: Jessica DiLuca - Transportation Planner II
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike, Newington, CT 06131
E-Mail: Jessica.DiLuca@po.state.ct.us
Phone: 860-594-2135


2. Notice of EIE for Improvements to the New Haven Rail Maintenance Facility

Municipality where project is proposed: New Haven

Address of Possible Project Location: The site of the current rail maintenance facility south of Union Avenue and north of Cedar and Hallock Streets.

Project Description: The project consists of the construction of new facilities at the New Haven Yard Maintenance Facility to serve the existing and future fleet of rail cars for the Metro-North Commuter Railroad.  Individual projects are: Construction of new storage yard tracks, component change-out shop with support facilities, service and inspection shop, wheel true shop, maintenance-of-way building, material distribution warehouse, rail car wash facility, heavy repair/paint shop and parking structure. Rehabilitation to: existing storage yards, electrical multiple unit shop, car shop/critical systems repair and diesel shop.  The overall project also includes the removal of the existing stores building, diesel tanks and water treatment/dewatering facility as well as the replacement of the propane tank and wheel true mill.       

Project Maps:  Click here to view a site location map of the project area.

                       Click Here to view a map of the project.

Comments on this EIE will be accepted until the close of business on : July 9, 2008

The public can view a copy of this EIE at: The New Haven City Clerks Office - 200 Orange Street, New Haven CT 06510, The New Haven Free Public Library -  133 Elm Street, New Haven, CT 06510, The South Central Regional Council of Governments - 127 Washington Avenue, 4th Floor, North Haven, CT 06473, The Connecticut Department of Transportation - 2800 Berlin Turnpike, Room 2155, Newington, CT 06131

There is a public hearing scheduled for this EIE on:

DATE: Wednesday June 25, 2008

TIME: 7:00 pm

PLACE: Gateway Community College - 60 Sargent Drive, New Haven, CT (Room 160)

Additional information about this project can be found online at:

Send your comments about this EIE to:

Name: Mr. Edgar T. Hurle - Transportation Planning Director
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike Newington , CT 06051
E-Mail: Edgar.Hurle@po.state.ct.us

If you have questions about the public hearing, or where you can review this EIE, or similar matters, please contact :

Name: Mr. Keith T. Hall - Transportation Supervising Planner
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike Newington , CT 06051
E-Mail: Keith.Hall@po.state.ct.us
Phone: 860-594-2926


  
State Land Transfer Notices

There are no state land transfers posted for public notice or comment in this edition.

 
The Adobe Reader is necessary to view and print Adobe Acrobat documents, including some of the maps and illustrations that are linked to this publication. If you have an outdated version of Adobe Reader, it might cause pictures to display incompletely. To download up-to-date versions of the free software, click on the Get Acrobat button, below. This link will also provide information and instructions for downloading and installing the reader.

Button - Get Adobe Reader Download the free Acrobat Reader!
 

Access.Adobe is a tool that allows blind and visually impaired users to read any documents in Adobe PDF format.  For more information, go to Welcome to Access.Adobe.Com

Copyright 2006, Connecticut Council on Environmental Quality