Replacement of Bridge No. 02866 - Route 275 over Willimantic River


2. Post-Scoping Notice for  Replacement of Bridge No. 02866 - Route 275 over Willimantic River

Municipalities where project will be located: Coventry and Mansfield


CEPA Determination:  On March 17, 2015 the Connecticut Department of Transportation (Department) published a Notice of Scoping to solicit public comments for this project in the Environmental Monitor.  During the scoping period, the Department received comments from the Mansfield Department of Public Works, the Willimantic River Alliance, Inc., the Office of Policy and Management, the Connecticut Department of Energy and Environmental Protection, and the Department of Public Health. The Department has taken all comments into consideration and has concluded that the project does not require the preparation of Environmental Impact Evaluation under CEPA.


The Department's conclusion is documented in an Environmental Assessment Checklist and a Memo of Findings and Determination.

If you have questions about the project, you can contact the agency at:

Name:

Mr. Mark W. Alexander, Transportation Assistant Planning Director

Agency:

Connecticut Department of Transportation
Bureau of Policy and Planning

Address:

2800 Berlin Turnpike
Newington, Connecticut 06131

Phone:

860-594-2931

E-Mail:

What happens next: The Department expects the project to go forward. This is expected to be the final notice of the project to be published in the Environmental Monitor.