2. Notice of Scoping for New Hartford Wastewater Treatment Facility Upgrade

Municipality where proposed project would be located: New Hartford

Project Description: The Town of New Hartford is conducting a wastewater facilities planning study for an upgrade of its wastewater treatment system.  The study is being conducted because the wastewater treatment plant’s average flow has exceeded ninety percent of its design capacity, the facilities that were built in 1968 have exceeded their design life, and projected growth patterns are extending into previously unsewered areas.  The study area, depicted in the linked figure, includes the treatment facility, the proposed development corridor along Route 44 and streets adjacent to public water supply wells.  The study also includes an infiltration and inflow evaluation of the existing sewers.

Project Map:  Click here to view a map of the study area.

Written comments from the public are welcomed and will be accepted until the close of business on:  November 5, 2004

Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members by October 15, 2004, the Department of Environmental Protection will schedule a Public Scoping Meeting.

Additional information about the project can be viewed in person at:

Department of Environmental Protection
Bureau of Water Management
Municipal Facilities Section (2nd Floor)
79 Elm Street, Hartford, CT 06106

Written comments, requests for a Public Scoping Meeting, or questions about the scoping for this project should be directed to:

Name: Stacy Pappano, Sanitary Engineer
Agency: Department of Environmental Protection
Bureau of Water Management
Address: 79 Elm St.
Hartford, CT 06106
Phone: (860) 424-3362
Fax: (860) 424-4067
E-Mail: stacy.pappano@po.state.ct.us