Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Please be advised that the Connecticut Siting Council will not be accepting any hard copy filings for any matter after 12 PM on Wednesday, December 24, 2025. Regular file processing will resume at 8:30 AM on Friday, December 26, 2025. Thank you for your consideration.

PETITION NO. 1344 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of approximately 11 miles of its existing No. 1342 115-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right of way between the existing Green Hill Substation located at 775 Green Hill Road in Madison and the existing Bokum Substation located at 49 Bokum Road in Old Saybrook, Connecticut, traversing Madison, Killingworth, Clinton, Westbrook, Essex and Old Saybrook, and related electric transmission line structure improvements.

 

Petition Filing, (received 5/10/18)

 

PROCEDURAL CORRESPONDENCE
DECISION