1. Notice of Scoping for Seaview Avenue Corridor Improvements

Municipality where proposed project might be located: Bridgeport, Connecticut

Project Location: Along Seaview Avenue beginning at Barnum Avenue and extending approximately 2,500 feet north to Boston Avenue (US Route 1), then continuing northerly along a new alignment just west of, and parallel to Bond Street from Boston Avenue approximately 2,250 feet north to Stewart Street, and then extending approximately 600 feet to the west from Stewart Street.   

Project Description: The City of Bridgeport, with technical and financial assistance from the Connecticut Department of Transportation (CTDOT) and the Federal Highway Administration (FHWA), proposes reconstruction, streetscape enhancements, and a new transportation corridor centered upon Seaview Avenue in Bridgeport. The project will reconstruct and provide streetscape enhancements on Seaview Avenue and construct a new arterial roadway which will provide access to the planned Lake Success Business Park (LSBP), as well as the new Harding High School which is to be located at 379 Bond Street and is scheduled to open in Fall 2017.   

Improvements on Seaview Avenue from Barnum Avenue to US Route 1 are anticipated to include pavement rehabilitation, replacement and upgrade of traffic signal equipment, new sidewalks, streetscape enhancements, transit service features, and relocation of above ground utilities to below grade.  The intersection at US Route 1 will be realigned to accommodate a "normalized" four-way intersection with Seaview Avenue and Bond Street, thus eliminating the current offset alignment of the north/south legs.  The new proposed arterial roadway is adjacent to the existing Bond Street alignment north of US Route 1 to the intersection with Stewart Street, and would continue westerly from the present Stewart Street alignment to provide access to the proposed LSBP.  Based on the final preliminary engineering determination of the most suitable access point for the proposed LSBP, a new structure may also be proposed spanning the Yellow Mill Channel.     

Project Maps:  Click here to view a location map and an aerial view of the project area.

Written comments from the public are welcomed and will be accepted until the close of business on:  Friday May 7, 2015

Any person can ask the sponsoring agency to hold a Public Scoping Meeting by sending such a request to the address below.  If a meeting is requested by 25 or more individuals, or by an association that represents 25 or more members, the sponsoring agency shall schedule a Public Scoping Meeting.  Such requests must be made by Thursday April 17, 2015.

Written comments and/or requests for a Public Scoping Meeting should be sent to:

Name:
Mr. Mark W. Alexander, Transportation Assistant Planning Director
Agency:
Connecticut Department of Transportation
Bureau of Policy and Planning
Address: 2800 Berlin Turnpike
Newington, CT 06131
Fax: 860-594-3028
E-Mail:

If you have questions about the public meeting, or other questions about the scoping for this project, contact:

Name: Mr. Jonathan M. Dean, Project Engineer
Agency: Connecticut Department of Transportation
Bureau of Engineering and Construction
Address: 2800 Berlin Turnpike
Newington, CT 06131
Phone: 860-594-3211
E-Mail: