New Haven-Hartford-Springfield

1. Notice of Scoping for the  New Haven-Hartford-Springfield Commuter Rail Improvements

Municipalities where proposed project might be located: New Haven, North Haven, Wallingford, Meriden, Berlin, Newington, Hartford, Windsor, Windsor Locks, Enfield, Longmeadow, MA, and Springfield, MA.

Project Description: The proposed improvements include a Start Up Service as proposed in the Final Report of the New Haven-Hartford-Springfield Commuter Rail Implementation Study, June 2005 and a Full Build Alternative.  The Start-up Service would include the following:

Service would operate bi-directionally, Monday through Friday on a 30 minute peak hour schedule (at least 14 one-way trips).

Service would be between New Haven and Springfield.

A minimum of 18 miles of extended double track sections will be added to improve reliability and provide 30 minute headways meeting critical times in New Haven, Hartford and Springfield.

Service would supplement existing Amtrak service on the corridor. Adjustments to Amtrak’s schedule would be attempted when possible in conjunction with operating agreements with Amtrak.

Along with the existing nine passenger stations being served along this corridor, four additional stations would be added at North Haven, Newington, Hartford (Flatbush Avenue), and Enfield.

The existing Windsor Locks station would be enhanced to provide facilities to accommodate a waiting area and transfers between the train and the shuttle bus to Bradley Airport.

Local bus service will be modified to provide appropriate service to the stations.

All stations would have high level platforms and grade-separated pedestrian facilities, considered to be necessary from an operational standpoint.

All stations would include high-level platforms, pedestrian amenities with grade separated crossings, bicycle storage and racks, and any additional parking required to accommodate projected ridership.

The Full Build Alternative would include:

Double-track the remaining 20.6 miles of single track sections to improve reliability and allow service at least as frequent as every 15 minutes.

Construct second high-level platforms and grade-separated pedestrian facilities at Wallingford , Berlin and Windsor Locks Stations. It is of note that these stations were on single-track segments in the start-up service and therefore only one platform and no grade-separated pedestrian facilities were necessary. With the additional double-tracking of the entire line, these elements would be necessary.

Construct an additional station in the Wharton Brook area on the former Pratt and Whitney property as development takes place.

Provide new commuter rail parking in the new Meriden parking structure to be constructed with downtown development plans in Meriden.

Project MapClick here to view a map of the project area.

Written comments from the public are welcomed and will be accepted until the close of business on:Thursday, January 15, 2009.

There will be four public scoping meetings for this project as follows:

DATE : Monday, December 8, 2008.

TIME : 6:00 PM

PLACE : TD Banknorth Conference Center , 1441 Main Street, Springfield, MA.

DATE : Tuesday, December 9, 2008.

TIME : 6:00 PM

PLACE : Hartford Union Station, One Union Place, Hartford, CT.  

DATE : Thursday, December 11, 2008.

TIME : 6:00 PM

PLACE : Windsor Town Hall, 275 Broad Street, Windsor, CT.   

DATE : Tuesday, December 16, 2008.

TIME : 6:00 PM

PLACE : North Haven Memorial Library, 17 Elm Street, North Haven, CT.  

The Implementation Study, which is the basis for the EA/EIE may be viewed in person at the Connecticut Department of Transportation Headquarters in Newington, CT. or by clicking on the following link: http://www.nhhsrail.com/

Written comments throughout the scoping process should be sent to:

Name: Mr. Edgar T. Hurle - Transportation Planning Director
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike
Newington, CT 06131
Fax: 860-594-3377
E-Mail: Edgar.Hurle@po.state.ct.us

If you have questions about the public meetings, or other questions about the scoping for this project, contact:

Name: Mr. Stephen V. Delpapa - Transportation Supervising Planner
Agency: State of Connecticut Department of Transportation
Address: 2800 Berlin Turnpike
Newington, CT 06131
Phone: 860-594-2941
Fax: 860-594-3028
E-Mail: Stephen.Delpapa@po.state.ct.us

The agency expects to release an Draft Environmental Impact Evaluation for this project, for public review and comment, in the Fall of 2009.