PETITION NO. 622A – T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling pursuant to Connecticut General Statues §4-176 and §16-50k for the proposed relocation of an existing T-Mobile facility attached to an Eversource electric transmission line structure (#826) onto an approved replacement electric transmission line structure (#826) within the existing Eversource right-of-way located at 1975 Huntington Road, Stratford, Connecticut.
Procedural Correspondence