PETITION NO. 869
- Algonquin Gas Transmission, LLC petition for declaratory
ruling that no Certificate of Environmental Compatibility and Public Need is
required for the proposed interconnection of Algonquin’s existing W-System with
the Kleen Energy Generating facility off River Road in Middletown, Connecticut.
ADDITIONAL CORRESPONDENCE
Revised Pipeline Route 05/13/09 (full-size map-unable to scan)
DECISION