City of New London
DOCKET NO. 20 – National Railroad Passenger Corporation Certificate for three one hundred-foot antenna poles on railroad property in Guilford, New London, and Old Saybrook. Application returned.
DOCKET NO. 439 – Message Center Management and New Cingular Wireless PCS, LLC MCM Acquisition 2017, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Bates Woods Park, New London, Connecticut. (Record) (Findings of Fact) (Opinion) (Decision and Order)
PETITION NO. 47 – National Passenger Corporation (Amtrak) petition for four 100-foot high steel monopole telecommunications towers within Amtrak’s right-of-way located off Hallock Avenue, New Haven; off Whitfield Street, Guilford, east o the Boston Post Road overpass, Old Saybrook; and near Hamilton Street and Smith Street, New London. Staff Report Approved 01/11/80
PETITION NO. 759 – Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modification of a Connecticut Light & Power Company electric transmission structure located at 61 Hawthorne Drive North, New London, Connecticut. Staff Report Approved 03/08/06
PETITION NO. 966 – The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Williams Substation located at 469 Williams Street, New London, Connecticut. Staff Report Approved 11/05/10
PETITION NO. 1068 – BE 2012 A LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the location and construction of a Customer-Side 400 kW Fuel Cell to be located at AT&T, 26 Washington Street, New London, Connecticut. Record Staff Report Status Update - Constructed Approved 10/31/13
PETITION NO. 1254 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility to be attached to the existing sign structure on the roof of the Kingdom Alliance Corp. building located at 327 Huntington Street, New London, Connecticut. Approved 11/10/16
PETITION NO. 1307 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing banquet center building located at Ocean Beach Park, 98 Neptune Avenue, New London, Connecticut. Approved 07/20/17
PETITION NO. 1311 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a wireless telecommunications facility on the roof of the existing Yarnall Athletic Center and Bookstore at Mitchell College located at 40 Debiasi Drive, New London, Connecticut. Approved 08/31/17
PETITION NO. 1365 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1.2-megawatt fuel cell facility and associated equipment to be located at Connecticut College, 5 Reservoir Street, New London, Connecticut. Approved 05/09/19
PETITION NO. 1390 – Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility and associated equipment on the roof of an existing commercial building located at 951 Bank Street, New London, Connecticut. Approved 01/17/20
PETITION NO. 1441 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 1,750-kilowatt fuel cell facility and associated equipment to be located at Yale New Haven/Lawrence & Memorial Hospital, 412 Ocean Avenue, New London, Connecticut. Approved 05/06/21
PETITION NO. 1607 – Hanwha Q Cells America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC battery energy storage facility located at Parcel No. 95-F10-247-5 and 95-F10-247-5A, 163 State Pier Road, New London, Connecticut, and associated electrical interconnection. Denied 11/07/24
PETITION NO. 1607A– Hanwha Q Cells America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.0-megawatt AC battery energy storage facility located at Parcel No. 95-F10-247-5 and 95-F10-247-5A, 163 State Pier Road, New London, Connecticut, and associated electrical interconnection. Reopening of this Petition based on changed conditions pursuant to Connecticut General Statutes §4-181a(b). (Link to PETITION NO. 1607)
BANM notice of intent to modify an existing telecommunications facility located at 59 Westwood Ave., New London. November 22, 1995 Antenna Upgrade Filing
Eastern Connecticut Cable Television, Inc. notice of intent to modify an existing telecommunications facility located at 59 Westwood Ave., New London.
Springwich Cellular Ltd. Partnership notice of intent to modify an existing telecommunications facility located at 26 Washington St., New London.
Sprint PCS notice of intent to modify an existing telecommunications facility located on Washington Street in New London.
EM-VER-095-020222 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 59 Westwood Avenue, New London, Connecticut.
EM-CING-041-068-082-095-115-154-021212 – Southwestern Bell Mobile Systems. LLC d/b/a Cingular Wireless notice of intent to modify existing telecommunications facilities located in East Haddam, Kent, Middlefield, New London, Prospect, and Westbrook, Connecticut. (26 Washington St., New London)