April 11, 2003
TO: Council Members
FROM: S. Derek Phelps, Executive Director
RE: PETITION NO. 617E - Waterside Power, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary 69.2 MW peaking project in Stamford, Connecticut.
The Connecticut Siting Council (Council) has scheduled a field review of this petition on Monday, April 21, 2003, beginning at 2:00 p.m. The Council will meet at the Waterside Project site at 2:00 p.m. A detailed map and driving directions are enclosed for the site and for the hearing which will begin at 3:00 p.m. and reconvene at 7:00 p.m. at the Stamford Senior Center, located within the Stamford Government Center, 888 Washington Boulevard, Stamford, Connecticut.
Directions to the Field Review from I-95
Directions from Site to Hearing
Circle around to find a place. It may be necessary to go up one or two floors. If so, after parking, go to garage elevator to the ground level. Enter building, sign in at reception desk and take the inside building elevator to the second floor. Walk toward railing and then left to enter the Senior Center reception area and auditorium.
