Resilience Improvement Plan
CTDOT is currently in the process of creating a Resilience Improvement Plan (RIP) with a Vulnerability Assessment of State-owned assets. This plan is expected to be completed in 2024 and will be posted to this page after review from FHWA.
A Resilience Improvement Plan is a voluntary, risk-based assessment of vulnerable transportation assets in immediate and long-term transportation planning that demonstrates a systemic approach to surface transportation system resilience (23 U.S.C. 176(e)). A Resilience Improvement Plan can reduce Non-Federal match by up to 10% for both PROTECT Formula and Discretionary Grant projects (23 U.S.C. 176(e)(1)(B)).
Contact Us: DOTresilience@ct.gov
Link to FHWA wepage on Resilience Improvement Plans
PowerPoint Presentation on CTDOT RIP