PLANS, STUDIES, and REPORTS

 

 

Long Range Transportation Plan

 

The Long Range Transportation Plan is the State's high-level blueprint for guiding transportation decision-making and investments. https://portal.ct.gov/-/media/DOT/documents/dpolicy/lrp/2018lrp/FINALConnecticutSLRTP20180313pdf.pdf

 

 

Modal Plans

 

Active Transportation (non-motorized)

  • Active Transportation Plan (2019)

o   Plan -http://www.ctbikepedplan.org/documents/CTActiveTransPlan_01-09-2019.pdf

o   Appendices -http://www.ctbikepedplan.org/documents/CTActiveTransPlan_Appendix2_01-08-2019.pdf

 

Freight

 

Performance Measures and Asset Management

 

Rail

 

Safety

 

Other

 

State Transportation Improvement Program (STIP)

 

STIP is a staged, multi-year, statewide, intermodal program of transportation projects funded by the Federal Highway Administration or the Federal Transit Administration.https://portal.ct.gov/DOT/PP_Bureau/ConnDOT-Plans/State-Transportation-Improvement-Program

 

 

Studies

 

PELs (Planning and Environmental Linkages)

For many of the State’s major initiatives, the Department is conducting Planning and Environmental Linkages (PEL) studies. PEL is a process approach that considers environmental, community and economic goals in the very early planning phase of a transportation program. It is generally conducted before any project construction phasing is identified and before specific problems and solutions are known.

  • Active

o    Greater Hartford Mobility Study https://www.hartfordmobility.com/

o    I-95 East (Branford to Rhode Island) https://www.i95easternct.com/

o    I-95 Stamford https://www.i95stamford.com/

o    I-84 Danbury https://www.i84danbury.com/

o    I-84 Waterbury https://hntb.mintznet.com/

 

  • PEL Resource links

o    FHWA links https://www.environment.fhwa.dot.gov/env_initiatives/PEL.aspx

 

 

Public Transportation

  • Active

o    Eastern Connecticut Rail and Transit Feasibility Study https://portal.ct.gov/DOT/PP_Bureau/ECRTS-Feasibility-Study-Home

 

  • Concluded

o    Wall Street Rail Station Study (2022) https://portal.ct.gov/-/media/DOT/PLNG_STUDIES/WallStreetFeasibilityStudyFinal.pdf

o    Niantic Rail Station Feasibility Study (2021) https://portal.ct.gov/-/media/DOT/PLNG_STUDIES/Niantic_CTRail_FinalReport_072621.pdf

o    Appendices https://portal.ct.gov/-/media/DOT/PLNG_STUDIES/Niantic_Appendices.pdf

o    Move New Haven Transit Mobility Study (2019) https://portal.ct.gov/-/media/DOT/documents/dpolicy/MoveNewHavenStudyFinalReportFINAL09272019.pdf

o    Connecticut Statewide Bus Study (2018) https://portal.ct.gov/-/media/DOT/PLNG_STUDIES/CT_STATEWIDE_BUS/CTStatewideBusStudyFinalReportFebruary2018v2pdf.pdf

  

NEPA/CEPA

  • Active

o    Route 7/15 Interchange – Norwalk – EA/Draft Section 4(f) Evaluation/ EIE (102-358)    portal.ct.gov/-/media/DOT/documents/denviro/EnvMonitor/Norwalk-EIE/7-15-Norwalk-EA-EIE--May-2023.pdf

o    Appendices for Route 7/15 Interchange EA/ Draft Section 4(f) Evaluation/ EIE (102-358) 7-15 Norwalk

 

  • Concluded

o    Walk Bridge Replacement Project – Norwalk – FRA Finding of No Significant Impact (301-176) April 2022    portal.ct.gov/-/media/DOT/documents/denviro/walk-bridge-fra-signed-fonsi-w-attachments.pdf

o    Seaview Avenue Corridor – Bridgeport – Finding of No Significant Impact (15-371) July 2018     https://portal.ct.gov/-/media/DOT/documents/denviro/FONSI_Signed_by_FHWA_Seaview_Ave_Bridgeport_15-371_July_24_2018.pdf

o    Seaview Avenue Corridor – Bridgeport – Environmental Assessment (15-371) January 2018     FinalSignedEAJan2018SeaviewBridgeport15371pdf.pdf (ct.gov)

o    Walk Bridge Replacement – Norwalk – Finding of No Significant Impact (301-176) July 2017    https://portal.ct.gov/-/media/DOT/documents/denviro/NorwalkRiverRailroadBridgeFONSIpdf.pdf

o    Walk Bridge Replacement – Norwalk – CEPA ROD & Determination of Adequacy (301-176) June/July 2017    https://portal.ct.gov/-/media/DOT/documents/denviro/WalkBridgeFinalROD6162017OPMCopywAppendicespdf.pdf

o    Relocation of I-91 NB Interchange 29 and Widening I-91 NB and Route 5/15 NB to I-84 EB – Hartford and East Hartford – Environmental Assessment and Finding of No Significant Impact (63-703) July 2016/August 2016    https://portal.ct.gov/-/media/DOT/documents/denviro/FinalSignedEnvironmentalAssessment63703andFONSIpdf.pdf

 

Road/Highway

 

Other

 

Sustainability & Resiliency Programs