CTDOT CONNECT DDE GUIDE VOLUME 4 - OPENROADS DESIGNER SURVEY
Module 6 - Plans Production
Description
Coming Soon
Objectives
Coming Soon
Quick Steps
Border and Title Block
Annotation
Cells
Additional Line Work
Grids Ticks and Lines
Before attempting to open or create DGN files users should make sure the following is in place:
- CTDOT users should have the CTDOT CONNECT DDE synced through SharePoint with the COMPASS Project Synced along with the CAD Configuration follow Volume 1 - Module 3 - CTDOT Employee DDE Sync.
- Consultants should have one of the following set up: Volume 1 - Module 1 - Consultant DDE Install or Volume 1 - Module 2 - Consultant DDE Sync.
- Set up your Interface follow the steps in Volume 1 - M.6.2 Setting Up the Interface (ct.gov).
Border and Title Block
Coming Soon
Annotation
Coming Soon
Cells
Coming Soon
Additional Line Work
Coming Soon
Grids Ticks and Lines
Coming Soon