CTDOT Construction Advisories

CTDOT Construction Advisories Header graphic

09/29/2023

Wrong Way Detection Installation: Route 3 and 1-91 Southbound in Wethersfield

The Connecticut Department of Transportation is announcing that Wrong Way Detection Installations will be performed on both Route 3 and I-91 southbound in Wethersfield starting on Monday, October 2, 2023, from 8:00 p.m. to 6:00 a.m.

This project is administered by CTDOT Electrical Sign Installation, District 1.

 

LANE CLOSURE INFO/DETOUR INFO

Motorists can expect closures on Route 3 south and I-91 south in Wethersfield. Traffic control personnel and signing patterns will guide motorists around the work zone.

Traffic for Route 3 south, will be detoured to I-91 south to Exit 24, right off the exit and follow detour signs back.

Traffic for I-91 south will be detoured to Exit 24 southbound, take the right off-ramp and follow detour signs.

The regular work schedule for this project is from 8:00 p.m. to 6:00 a.m. Monday.

Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.


FOR MORE INFORMATION:
860-594-2560
DOT.CustomerCare@ct.gov
Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.

 

Share this information on: