CTDOT Construction Advisories
09/26/2023
Thin Surface Treatment: Route 109 from Steeples Road to Route 109/47 in Washington
The Connecticut Department of Transportation (CTDOT) is announcing that a thin surface treatment prior to a 2024 resurfacing project will be performed on Route 109 in Washington starting on Friday, September 29, 2023.
This project will be included in CTDOT’s 2024 Vendor Resurfacing Program
LANE CLOSURE INFO
Motorists can expect delays and one lane alternating Traffic. Traffic control personnel and signing patterns will guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 4:00 p.m., Monday through Friday)
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this area.
FOR MORE INFORMATION:
860-594-2560
DOT.CustomerCare@ct.gov
Operating Hours: Monday - Friday 8:00 a.m. to 4:30 p.m.
Share this information on: