The Connecticut Department of Transportation (CTDOT) is announcing that roadway ramp preparations for wrong-way detection system installations will be performed at the Exit 6 off-ramp from Interstate 395 northbound to Route 163 in Montville, the Exit 88 off-ramp from Interstate 95 southbound to Route 117 in Groton, and the Exit 3 off-ramp from Route 349 northbound to Route 1 in Groton.
The work is scheduled for Thursday, November 10, 2022, with a rain date of Friday, November 11, 2022.
RAMP INFO:
Motorists can expect lane shifting to occur on these locations. Variable message boards will be set up approximately one (1) week prior to the work beginning. One (1) state trooper, crash attenuator vehicles and signing patterns will be utilized to guide motorists through the work zone. The work schedule for this project is from 8 a.m. to 4 p.m.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.