The Connecticut Department of Transportation (CTDOT) is announcing that a safety improvement project will be performed on Interstate 91 in Wallingford.
This project consists of an attenuator installation on a 0.05 mile segment of I-91 Northbound in Wallingford. This work is scheduled to occur Monday May 23, 2022.
This project is being performed by Atlas Industrial Services.
LANE CLOSURE INFO
Motorists can expect left lane closures on Interstate 91 Northbound, between exit 12 (Washington Ave) and exit 14 (Woodhouse Ave) in Wallingford. The regular work schedule for this project is from Monday through Friday from 8 a.m. to 3:30 p.m. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.