The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Bridge 00220 carrying Nod Road over I-95 north and southbound in Clinton. Work activity is scheduled to occur from Monday, April 19, 2021, through Friday, May 28, 2021, between the hours of 8 PM and 5 AM.
Motorists can expect various lane closures on I-95, southbound between the Exit 63 off-ramp and Bridge 00220, and northbound from the Exit 62 off-ramp to Bridge 00220.
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in this vicinity.