Construction News from the Connecticut Department of Transportation - 2020
Page 3 of 26
-
11/9/2020
Virtual Public Information Meeting Concerning Proposed Culvert Replacements on Route 167 in Farmington
The Department of Transportation (Department) will conduct a virtual public information meeting concerning proposed culvert replacements on Route 167 in Farmington, on Thursday, December 10, 2020, at 7:00 p.m. The meeting will be live streamed via Microsoft Teams Live Event and YouTube Live. A question and answer session will immediately follow the presentation. The presentation will be recorded. Instructions on how to access the meeting and on how to provide comments or ask questions can be found at the project webpage: https://portal.ct.gov/DOTFarmington51-275.
-
11/5/2020
Public Informational Meeting Concerning the Rehabilitation of Bridge 04069 Carrying Lakeside Drive over North Stamford Reservoir in Stamford
The Connecticut Department of Transportation (Department) will conduct a virtual public informational meeting concerning the proposed rehabilitation of Bridge 04069 carrying Lakeside Drive over North Stamford Reservoir in Stamford, on December 3, 2020. The formal presentation will begin at 7:00 p.m. Refer to the project webpage for more detail: http://portal.ct.gov/DOTStamford135-343.
-
11/5/2020
Bridge Resurfacing Project on I -91 Southbound in Hartford
The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on I-91 southbound in Hartford.
-
11/5/2020
Installation of Shoulder Rumble Strip on Route 7 in Brookfield
The Connecticut Department of Transportation is announcing the installation of a shoulder rumble strip on Route 7 in Brookfield.
-
10/30/2020
Scheduled One-Night Closure of I-84 Westbound Exit 9 Ramps in Newtown
The Connecticut Department of Transportation is announcing a one-night scheduled closure of the I-84 westbound Exit 9 ramps in Newtown on Friday, November 6, 2020. The ramps will be closed starting at 8:00 PM and will reopen at 5:00 AM the following morning. The closure and detours are necessary to facilitate construction activities.
-
10/30/2020
Replacement of Bridge Carrying Route 80 Over the Deep River in the Town of Deep River
The Connecticut Department of Transportation is announcing that construction activities for the replacement of Bridge 02929, which carries Route 80 over the Deep River, is scheduled to start Monday, November 2, 2020.
-
10/28/2020
Bridge Maintenance on I-91 North in New Haven
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-91 northbound in New Haven.
-
10/28/2020
Bridge Maintenance on I-95 South in Guilford
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-95 south in Guilford.
-
10/28/2020
Pavement Preservation Project and Concrete Roadway Repairs to Ramps on Route 25 southbound in Trumbull
The Connecticut Department of Transportation is announcing that a pavement preservation project will be performed on Route 25 ramps (from Daniels Farm Rd. & Rte.#15N to Rte.#25S) southbound in Trumbull.
-
10/26/2020
Guiderail Upgrade on Route 72 Northbound and Southbound from the Merge of I-84 to the Merge of Route 9 in New Britain
The Connecticut Department of Transportation is announcing that guiderail upgrades will be performed on Route 72 northbound and southbound from .05 miles east of the I-84 Exit 35 access ramp to the merge of Route 9 northbound and southbound in New Britain.
-
10/26/2020
Public Information Meeting Regarding Proposed Replacement of Bridge 05501 Carrying Arrowhead Road over the Norwalk River in Wilton
The Connecticut Department of Transportation (Department) will conduct a virtual public information meeting concerning the proposed replacement of Bridge 05501 carrying Arrowhead Road over the Norwalk River in Wilton, on Thursday, November 12, at 7:00 p.m. The meeting will be live streamed via Microsoft Teams Live Event and YouTube Live. A question and answer session will immediately follow the presentation. The presentation will be recorded. Instructions on how to access the meeting and on how to provide comments or ask questions can be found at the project webpage: https://portal.ct.gov/DOTWilton161-143.
-
10/23/2020
Updated Detour of SR 528 for the Replacement of Bridge 05587 Carrying SR528 (Turnpike Road) over Gillettes Brook in Somers
The Connecticut Department of Transportation is announcing that SR 528 (Turnpike Road) will remain detoured from Route 190 (Main Street) to the intersection of Battle Street and Mountain Road until December 20, 2020.
-
10/23/2020
Scheduled Upcoming Closures of Route 8 Southbound in Waterbury
The Connecticut Department of Transportation is announcing upcoming scheduled closures of Route 8 southbound in Waterbury to facilitate ongoing construction activities associated with the Route 8/I-84 Interchange (Mixmaster) rehabilitation project.
-
10/23/2020
Bridge Maintenance on Route 7 Northbound in Norwalk
The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 7 northbound in Norwalk.
-
10/23/2020
Construction of Auxiliary Lane on I-95 Southbound Between Exit 6 and 7 in Stamford
The Connecticut Department of Transportation’s (Department) Office of Engineering is developing plans to construct an auxiliary lane on I-95 between Exit 6 and Exit 7 in the southbound direction in Stamford. This project also proposes to rehabilitate the existing pavement, rehabilitate bridges and address roadside safety between Bridge 00023 (I-95 over West Avenue) and Bridge 00026 (I-95 over Greenwich Avenue).