Construction News from the Connecticut Department of Transportation - 2020

Page 26 of 26

  • 2/4/2020 Replacement of Boombridge Road Bridge over the Pawcatuck River in North Stonington and Westerly

    The Connecticut Department of Transportation is announcing the start of construction on the Boombridge Road Bridge (Bridge 04744), spanning the Pawcatuck River, located in North Stonington, Connecticut and Westerly, Rhode Island. The bridge is owned and maintained by the respective towns.

  • 2/3/2020 Eversource Utility Project on Interstate 95 Southbound in Greenwich

    The Connecticut Department of Transportation is announcing that an Eversource utility project on Interstate 95 southbound in Greenwich at the Exit 4 Off-Ramp, will occur nightly from 9 PM to 5 AM, through Friday morning, February 7, 2020. During the work hours, motorists can expect the Interstate 95 southbound Exit 4 off-ramp to be closed.

  • 1/31/2020 Lane Closures for Bridge Inspections - February 3 -8

    Lane closures will be required for bridge safety inspections and evaluations around Connecticut, February 3 – 8, 1, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)

  • 1/28/2020 Rehabilitation of Bridge 01602 Carrying SSR 454 over Indian Hole Brook in Shelton

    The Connecticut Department of Transportation is announcing that Bridge 01602 has been reduced to one lane with alternating one-way traffic to facilitate the start construction to rehabilitate the structure. This lane reduction and traffic pattern will be in effect until the completion of the project, on or about November 16, 2020.

  • 1/24/2020 Lane Closures for Bridge Inspections - January 25 - February 1

    Lane closures will be required for bridge safety inspections and evaluations around Connecticut, January 25 – February 1, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)

  • 1/21/2020 Roadway Lighting Replacement

    The Connecticut Department of Transportation's (Department) Office of Engineering is developing plans for the replacement of existing high pressure sodium (HPS) type roadway lighting fixtures with new light emitting diode (LED) type fixtures on Interstate 95 in Bridgeport, and the replacement of existing roadway lighting systems on Interstate 91 in New Haven, North Haven and Wallingford, Route 40 in North Haven and Hamden, Route 22 and Route 5 in North Haven, State Road 702 in Wallingford, and Route 25 and Route 111 in Trumbull.

  • 1/17/2020 Lane Closures for Bridge Inspections - January 20 - 24

    Lane closures will be required for bridge safety inspections and evaluations around Connecticut, January 20 – 24, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)

  • 1/15/2020 Rehabilitation of Bridge 00901 Carrying U.S. Route 202 and Route 67 over the Housatonic River in New Milford

    The Connecticut Department of Transportation is announcing the start of construction activity for the rehabilitation of Bridge 00901 which carries U.S. Route 202 and Route 67 over the Housatonic River in New Milford.

  • 1/10/2020 Lane Closures for Bridge Inspections, January 11 - 17, 2020

    Lane closures will be required for bridge safety inspections and evaluations around Connecticut, January 11 – 17, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)

  • 1/7/2020 Replacement of Bridge 00069 Carrying Beachside Avenue over Interstate 95 in Westport

    The Connecticut Department of Transportation is announcing the start of construction, on or about January 23, 2020, for the project to replace Bridge 00069, which carries Beachside Avenue over Interstate 95 in Westport.

  • 1/3/2020 Lane Closures for Bridge Inspections - January 6 - 11, 2020

    Lane closures will be required for bridge safety inspections and evaluations around Connecticut, January 6 – 11, 2020, weather permitting. View the complete list and plan ahead. (NB and SB mean northbound and southbound; EB and WB mean eastbound and westbound.)