be performed on Route 157 from the Middlefield Town Line to Route 66 (Washington Street) in Middletown beginning Monday, May 4, 2020.
The project consists of milling and resurfacing a 1.64 mile segment of Route 157 from the Middlefield Town Line to Route 66 (Washington Street) in Middletown. This project is scheduled to begin milling on Monday, May 4, 2020 to Wednesday, May 6, 2020. The resurfacing segment of this project is anticipated to begin on Tuesday, May 20, 2020 to Friday, May 22, 2020.
This project is included in the Department of Transportation’s 2020 Vendor Resurfacing Program.
LANE CLOSURE INFO
Motorists can expect lane closures on Route 157 from the Middlefield Town Line to Route 66 (Washington Street) in Middletown. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is 7:00 a.m. to 5:00 p.m. (Monday – Friday).
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.