The Connecticut Department of Transportation is announcing that deck end repairs will be performed on the Baldwin Bridge carrying I-95 Northbound over the Connecticut River in Old Saybrook, overnight Friday-Saturday, September 25-26, 2020.
This is Bridge # 0600A.
LANE CLOSURE INFO
Motorists can expect the high speed and left center lane closed across on the Baldwin Bridge carrying I-95 Northbound in the town of Old Saybrook, Ct. Northbound from Exit 67 to Rt. 154 off ramp to Exit 70 to Rt. 156 off ramp and Rt. 9 Southbound from Exit 2 to I-95 Northbound. Traffic control vehicles, variable message board, and signing patterns will be utilized to guide motorists through the work zone. The regular work schedule for this project is from 10:00 p.m. to 10:00 a.m. Friday, September 25, 2020 to Saturday, September 26, 2020.