The Connecticut Department of Transportation is announcing that a nighttime pavement preservation project will be performed on Route 349 northbound and southbound in Groton on the expressway and non expressway portions, from I-95 to Shennecossett Road, beginning on August 3rd 2020.
The project consists of milling and repaving 4.06 miles of Route 349 including roadway ramps within the project limits:
- NB Exit to US 1(001)
- NB ACC to SB I-95 (TR 821)
- NB ACC to SB US 1 (005)
- SB Exit to US 1 (003)
- SB ACC FR US 1 (002)
Temporary traffic impacts (consisting of daily shoulder and/or single lane closures) may occur for project completion.
Motorists are urged to obey the posted speed limit, to remain alert,and to use caution in the work zone.