Date |
Time Allowed |
Town |
Lane Closure |
Monday, April 27, 2020 |
9:00AM-3:00PM |
Berlin; Meriden; Wallingford |
Right shoulder closures Route 9 NB between Exits 22 and 24 and Route 9 SB between Exits 25 and 23. Right shoulder closures on I-691 SB between Exits 7 and 6 and I-691 NB between Exits 7 and 8. Shoulder closures on Route 15 SB on-ramp from Route 5 (North Colony Road) and Route 15 NB between Exits 65 and 66. |
Monday, April 27, 2020 |
9:00AM-3:00PM |
Norwich |
Lane shifting on local road (Wawecus Street) between Otrobando Avenue and Browing Street. |
Monday, April 27, 2020 |
9:00AM-3:00PM |
Farmington |
Alternating single and double lane closures on I-84 between Exits 37 and 39. |
Monday, April 27, 2020 |
9:00AM-3:00PM (single) and 9:00AM-12:00PM (NB - double), 10:00AM- 1:00PM (SB - double) |
Enfield |
Alternating double left and right lane closures and ramp lane shifts on I-91 NB and SB between exit 46 and 49. |
Monday, April 27, 2020 |
9:00AM-3:00PM |
Norwalk |
Alternating right and left lane closures on I-95 NB and SB, Exit 14-17. |
Tuesday, April 28, 2020 |
9:00AM-2:00PM |
Waterbury |
Right lane closures on I-84 between Exits 17 & 20. |
Tuesday, April 28, 2020 |
9:00AM-3:00PM |
New Haven |
Right shoulder closure/Lane shifting on I-91 SB on-ramp from State Street and Right shoulder closure/Lane shifting on I-91 SB off-ramp at Exit 3. |
Tuesday, April 28, 2020 |
9:00AM-3:00PM |
Farmington |
Alternating single and double lane closures on I-84 between Exits 37 and 39. |
Tuesday, April 28, 2020 |
9:00AM-2:00PM (NB) and 10:00AM-2:00PM (SB) |
Windsor |
Alternating double left and right lane closures and HOV lane shifts on I-91 NB and SB between exits 33 and 36. |
Tuesday, April 28, 2020 |
9:00AM-3:00PM |
Norwalk |
Alternating right and left lane closures on I-95 NB and SB, Exit 14-17. |
Wednesday, April 29, 2020 |
9:00AM-2:00PM (NB) and 10:00AM-2:00PM (SB) |
Windsor |
Alternating double left and right lane closures and HOV lane shifts on I-91 NB and SB between exits 33 and 36. |
Wednesday, April 29, 2020 |
9:00AM-3:00PM |
Norwalk |
Alternating right and left lane closures on I-95 NB and SB, Exit 14-17. |
Wednesday, April 29, 2020 |
9:00AM-3:00PM |
Greenwich |
Alternating right and left lane closures on I-95 NB and SB, NY State Line to Exit 3. |
Thursday, April 30, 2020 |
9:00AM-3:00PM |
Norwalk |
Alternating right and left lane closures on I-95 NB and SB, Exit 14-17. |
Thursday, April 30, 2020 |
9:00AM-3:00PM |
Greenwich |
Alternating right and left lane closures on I-95 NB and SB, NY State Line to Exit 3. |
Friday, May 1, 2020 |
9:00AM-3:00PM |
Essex |
Alternate right shoulder/lane shift on Route 153 between Ramps. |
Friday, May 1, 2020 |
9:00AM-3:00PM |
Meriden |
Shoulder closures / lane shifts on Bunker Avenue between Camp Street and Warren Street. |
Friday, May 1, 2020 |
9:00AM-3:00PM |
Windsor |
Local lane shifts and shoulder closures on Briarwood Drive. |
Friday, May 1, 2020 |
9:00AM-3:00PM |
Bridgeport |
Shoulder closures on |