The Connecticut Department of Transportation is announcing that a resurfacing project will be performed on I-91 southbound in Hartford.
The project consists of resurfacing the left, center and right lanes of a .45-mile segment on I-91 southbound and is scheduled to occur on Saturday, November 7, 2020, from 7:00 a.m. to 4:00 p.m.
Motorists can expect lane closures on I-91 southbound between Exit 32 and Exit 28. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in this vicinity.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.