The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on Route 7 northbound in Norwalk.
This work consists of bridge deck repairs to the Route 7 northbound Bridge over the Norwalk River in Norwalk. The work is scheduled to occur the morning of Monday, November 16, 2020, to the afternoon of Friday, November 20, 2020. The regular work schedule for this project is from 8:00 am to 4:00 pm.
This project is included in the Department of Transportation’s 2020 bridge maintenance program, the work is being performed by Hammonasset Construction LLC.
Motorists can expect lane closures on Route 7 northbound between Exit 1 and Exit 2 in Norwalk.
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in and near the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.