The Connecticut Department of Transportation is announcing that a bridge maintenance project will be performed on I-91 northbound in New Haven.
The project consists of expansion joint installation on the following structures: Bridge 03087 over Humphrey St., Bridge 03088 over Humphrey St., Bridge 03092 over Clinton Ave., Bridge 03094 over Amtrak RR, and Bridge 03095 over Little River.
This project is scheduled to occur the evening of Monday September 21, 2020, to the morning of Wednesday, November 25, 2020. Work will occur between the hours of 8 PM and 5 AM.
Motorists can expect lane closures on I-91 northbound between Exit 5 (Rt.5, State St., Fair Haven) and Exit 9 (Montowese Ave.) in New Haven. Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists are advised to remain alert, drive cautiously, and to maintain a safe speed when driving in and near the work zone.
The work is included in the Department of Transportation’s 2020 bridge maintenance program to support state forces with bridge repairs and is being performed by Dynamic Surface Applications.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions.