The Connecticut Department of Transportation is announcing that bridge maintenance activities will be performed on Bridge 01682 carrying Route 82 over Route 9 in Chester.
The work will take place from Friday, October 30, 2020, through approximately Friday, December 4, 2020, between the hours of 8 AM and 4 PM.
Motorists can expect a various lane closure on Route 9 northbound from the Route 148 on-ramp to the Route 82 on-ramp to Route 9, and southbound between the Exit 8 on-ramp to the Exit 7 off-ramp.
Traffic control personnel and signing patterns will be utilized to guide motorists through the work zone.
Motorists should be aware that modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving in this vicinity.