Irving Oil Terminals Inc, Revere, MA

Commonwealth of Massachuessetts 
Department of Environmental Protections 
Bureau of Air and Waste
Northeast Regional Office
150 Presidental Way, Suite 300, Woburn 01801

PUBLIC NOTICE

Notice is hereby given that the Department of Environmental Protection, acting in accordance with the provisions of M.G.L. chapter 111, Section 142A through 142E, will offer for public comment the following draft Operating Permit issued pursuant to 310 CMR 7.00: Appendix C.

The draft RENEWAL Operating Permit for Irving Oil Terminals Inc. is being issued in accordance with 310 CMR 7.00: Appendix C(6). The resulting permit includes changes made since the last Operating Permit was issued, such as the language included in previously-issued Plan Approval MBR-10-IND-018, the addition of requirements from federal regulations such as 40 CFR Part 63 to Tables 4, 5, 6, and 8, an updated Table 7 reflecting non-subject requirements, and other updates as requested by Irving Oil Terminals Inc. The purpose of the Operating Permit is to codify all of the facility's applicable requirements under the state and federal Clean Air Act, including monitoring, record keeping requirements and emission limitations, into a renewable Operating Permit. This action is required by the U.S. Environmental Protection Agency as stated in its final rule approving the Department's Operating Permit program (Federal Register Vol. 61, No. 95 Wednesday May 15, 1996).

The draft RENEWAL Operating Permit is for: 

FACILITY NAME: Irving Oil Terminals Inc. 

APPLICANT: Irving Oil Terminals Inc.

ADDRESS: 41 Lee Burnbank Highway, Revere, MA 02151 

APPLICATION/TRANSMITTAL NO.: W044530

MassDEP’s draft Renewal is available on the MassDEP Website at https://www.mass.gov/info-details/massdep-permits-approvals- for-comment. The Renewal Application, MassDEP’s proposed decision, and the administrative record also are available for inspection at MassDEP’s Office at the above letterhead address. Comments may be submitted via electronic mail to NERO.Air@mass.gov, or via mail to the letterhead address above.

The public comment period will extend until December 29, 2023. Under the provisions of 310 CMR 7.00: Appendix C(6)(f), a public hearing may be requested by any person by submitting a written request to the Regional Office, stating the nature of the issues to be raised at a public hearing. Based on the written request, the Department will determine if a public hearing will be held and a 30 day written notice will be given. The duration of the public comment period shall automatically extend to the close of the public hearing as provided for at 310 CMR 7.00: Appendix C(6)(g).

Comments may be presented in writing until 5:00 PM on December 29, 2023. Please submit written testimony via electronic mail or regular mail to

Department of Environmental Protection 
NORTHEAST REGIONAL OFFICE
150 PRESIDENTAIL WAY, SUITE 300, WOBURN 01801 
ATTENTION: PERMIT CHIEF
Edward.Braczyk@mass.gov


Draft permit