Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

WESTON

DOCKET NO. 217 – Northeast Utilities Service Company application for a Certificate of Environmental Compatibility and Public Need for the construction of a 345-kV electric transmission line and reconstruction of an existing 115-kV electric transmission line between Connecticut Light and Power Company's Plumtree Substation in Bethel, through the Towns of Redding, Weston, and Wilton, and to Norwalk Substation in Norwalk, Connecticut. (Findings of Fact), (Revised Opinion), (Concurring Opinion), (Dissenting Opinion - Emerick)(Revised Dissenting Opinion, - Ashton), and (Decision and Order).

DOCKET NO. 272 – The Connecticut Light and Power Company and The United Illuminating Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV electric transmission line and associated facilities between the Scovill Rock Switching Station in Middletown and the Norwalk Substation in Norwalk, Connecticut. This includes construction of the Beseck Switching Station in Wallingford, East Devon Substation in Milford, and Singer Substation in Bridgeport and modifications to the Scovill Rock Switching Station and the Norwalk Substation and certain interconnections. (Weston) (Findings of Fact), (Appendix A), (Appendix B), (Appendix C), (Opinion), (Decision and Order), (Record)

PETITION NO. 3 – The Connecticut Light and Power Company (CL&P) petition for reconductoring a portion of an existing 115-kV line between Trumbull Junction and Norwalk Substation and a 115-kV line between Old Town Substation and Norwalk Substation and crossing facilities of Penn Central Transportation Company, The Southern New England Telephone Company, and the United Illuminating Company in Trumbull, Bridgeport, Fairfield, Easton, Weston, Wilton, and Norwalk. Approved 10/13/72

PETITION NO. 386 – Sprint Spectrum, L.P. d/b/a Sprint PCS petition that no Certificate of Environmental Compatibility and Public Need is required for proposed modifications to a Connecticut Light and Power Company high-voltage electric transmission line support structure (#924) located approximately 800 feet east of the intersection of Timber Mill Lane and Weston Road (Rt. 57) in Weston, Connecticut. Staff ReportFindings of FactOpinion and Decision & Order Approved 1/22/98

PETITION NO. 604T – AT&T Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power transmission tower located at 76 Lyons Plain Road, Weston, Connecticut.

PETITION NO. 819 – The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Weston Substation, Weston Road, Weston, Connecticut. Staff Report Approved 7/03/07

PETITION NO. 894 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing six CL&P Substations located at Tomac Avenue, Greenwich; 7 Prange Road, Brookfield; 52 Peaceable Street, Redding; 85 ½ Weston Road, Weston; 164 North Eagleville Road, Mansfield; and Roosevelt Avenue, Preston, Connecticut. Staff Report Approved 05/07/09

PETITION NO. 1287 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed Redding to Wilton Project that includes structure and conductor replacements of approximately 5 miles of its existing No. 1470 115-kilovolt electric transmission line within existing Eversource electric transmission line right of way between the existing Peaceable Substation located at 520 Peaceable Street in Redding, Connecticut and the existing Wilton Substation located at 53 Old Danbury Road in Wilton, Connecticut, and related substation and transmission line structure improvements. Approved 03/02/17

PETITION NO. 1386 – New Cingular Wireless PCS, LLC (AT&T) petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of a wireless telecommunications facility at an existing Eversource-owned electric transmission line structure (#917) within an existing Eversource electric transmission line right-of-way located at 5 Tall Pines Drive, Weston, Connecticut. Approved 01/30/20

PETITION NO. 1549 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1714 Line Rebuild Project consisting of the replacement and reconductoring of approximately 9.4 miles of its existing Nos. 1714, 1720, and 1222 115-kilovolt (kV) electric transmission lines and one structure along its 1637 line within existing Eversource electric transmission right-of-way between Eversource’s Weston Substation, 85 Weston Street in Weston and the United Illuminating Company’s Old Town Substation, 122 Kaechele Place in Bridgeport, Connecticut traversing Weston, Fairfield, Easton and Bridgeport and related electric transmission line and substation improvements.  Approved 02/16/23

PETITION NO. 1567 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 1637/1720 Lines Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along its existing 4.0 mile electric transmission line right-of-way shared by its existing 115-kilovolt (kV) Nos. 1637 and 1720 Lines between Grist Mill Road in Norwalk, Norwalk Junction in Wilton, and Weston Substation in Weston, Connecticut traversing the municipalities of Norwalk, Wilton, and Weston, and related electric transmission line and substation improvements. Approved 09/14/23

TS-BAM-157-000717 – Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications tower located at 56 Norfield Road, Weston, Connecticut.

EM-SCLP-157-000921 – Springwich Cellular Limited Partnership (SCLP) notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.

EM-CING-015-034-035-051-057-085-103-117-126-135-138-157-158-161-020917 – Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facilities located in Bridgeport, Danbury, Darien, Fairfield, Greenwich, Monroe, Newtown, Norwalk, Redding, Shelton, Stamford, Stratford, Weston, Westport, and Wilton, Connecticut.

TS-AT&T-157-020830 AT&T Wireless PCS, LLC d/b/a AT&T Wireless request for an order to approve tower sharing at an existing telecommunications facility located 56 Norfield Road, Weston, Connecticut.

EM-T-MOBILE-157-021127 Omnipoint Communications, Inc. d/b/a T-Mobile notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.

EM-VER-084-118-157-161-040219 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 623 Honey Spot Road, Milford; 56 Norfield Road, Weston; 79 East Ridge Avenue, Ridgefield; and Mather Street, Wilton, Connecticut.

 

EM-CING-057-103-158-157-144-051004 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1081 North Street, Greenwich; 50 Rockland Road, Norwalk; 20 Post Office Lane, Westport; 56 Norfield Road, Weston; and Indian Ledge Park, Trumbull, Connecticut.

 

TS-NEXTEL-157-060516 – Sprint Nextel Corporation request for an order to approve tower sharing at an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.

 

TS-T-MOBILE-157-060907 – Omnipoint Communications, Inc. request for an order to approve tower sharing at an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. 

 

EM-CING-011-054-105-130-157-070220 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1021 Blue Hills Avenue, Bloomfield; Dickenson Road, Glastonbury; 38 Hatchetts Hill Road, Old Lyme; 231 Kettletown Road, Southbury; and 56 Norfield Road, Weston, Connecticut. Decision Letter

 

EM-VER-157-090206 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 237 Godfrey Road, Weston, Connecticut.  Decision

EM-VER-157-100422 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.

EM-CING-157-110729 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.

EM-CING-157-120127 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. 

EM-VER-157-120504 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  
 
EM-SPRINT-157-130213 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.   
 
EM-SPRINT-157-130701 Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.

EM-T-MOBILE-157-140228 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. DecisionNotice of Construction Completion  
 
EM-VER-157-140423 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. Decision Request for Extension and CSC Decision

EM-T-MOBILE-157-140318 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  Decision Notice of Construction Completion

EM-VER-157-140721 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion
 
EM-SPRINT-157-141105 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. Decision.  Decision Status Letter and CSC Response  
     
EM-SPRINT-157-141217 Sprint PCS notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.  Decision Not Constructed
 
EM-T-MOBILE-157-150429 T-Mobile notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-AT&T-157-151112 – AT&T notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Extension Request and CSC Decision2nd Extension Request and CSC Decision3rd Extension Request and CSC Decision4th Extension Request and CSC Decision

EM-VER-157-160915 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Condition 1 Compliance Extension Request and CSC Decision Notice of Construction Completion

EM-AT&T-157-161206 – AT&T notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.  Decision Notice of Construction Completion

EM-T-MOBILE-157-170214 – T-Mobile notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  Extension for Comments. Decision Notice of Construction Completion

EM-SPRINT-157-170811 Sprint notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-SPRINT-157-171103 – Sprint notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-CING-157-180326 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Incomplete Letter Extension Request and Council Approval Response and Council Acknowledgement Decision Completion Status Sheet Notice of Construction Completion

EM-CING-157-181106 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Revised Structural Analysis Notice of Construction Completion

EM-T-MOBILE-157-190605 – T-Mobile notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road East, Weston, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

EM-VER-157-190918 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-AT&T-157-200406 – AT&T notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision  Notice of Construction Completion

EM-T-MOBILE-157-201109 – T-Mobile notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion

EM-T-MOBILE-157-210107 – T-Mobile notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-T-MOBILE-157-210512 – T-Mobile notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.  Decision Notice of Cancellation

EM-VER-157-211124 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut.  Decision Notice of Construction Completion

EM-VER-157-220510Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  Decision Extension Request and Council Extension Approval Notice of Cancellation

EM-AT&T-157-220707 – AT&T notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Notice of Construction Completion

EM-VER-157-231006 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  Decision Notice of Construction Commencement Request for Extension and Council Decision

EM-VER-157-231101 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 56 Norfield Road, Weston, Connecticut. Decision Extension Request and Council Extension Approval

EM-ATT-157-231106 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 5 Tall Pines Drive, Weston, Connecticut. Decision Notice of Construction Completion

EM-VER-157-240408 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 237 Godfrey Road, Weston, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Approval

EM-EVER-157-250613e The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located at Weston Road, Weston, Connecticut.