SOUTHINGTON

DOCKET NO. 35 - Southern New England Telephone Company Certificate for telecommunication towers and associated equipment in Southington, Hartford, East Hartford, and South Windsor. (Findings of Fact),   (Opinion),  and  (Decision and Order).

DOCKET NO. 40 - Springwich Cellular Limited Partnership Certificate of Environmental Compatibility and Public Need for cellular facilities in Berlin, Middlefield, off Shuttle Meadow Road in Southington, Hartford, East Hartford, and South Windsor. (Findings of Fact)(Opinion),  and  (Decision and Order).

DOCKET NO. 191 - An application by AES Southington, LLC for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of an electric generating facility located at 149 Lazy Lane in the Town of Southington(Findings of Fact)(Opinion),  and (Decision and Order).

DOCKET NO. 455 - Cellco Partnership d/b/a Verizon Wireless application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Southington Tax Assessor Map/Lot 066053, 99 East Street, Southington, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order).

PETITION NO. 14 - Connecticut Light and Power Company petition for changes to two 115-kV lines to the Southington, Forestville, and Bristol Substations. Staff Report. Approved 2/23/73

PETITION NO. 93 - The Connecticut Light and Power Company petition for modifications to the Frost Bridge Substation-Southington Substation 345-kV transmission line in Southington and Wolcott. Staff Report.  Approved 6/20/83

PETITION NO. 129 - Northeast Utilities Service Company petition for modifications to the Southington-Hanover 115-kV line in Southington and Meriden.  Staff Reports for Petitions 129 - 136.  Approved 8/20/85

PETITION NO. 130 - Northeast Utilities Service Company petition for modifications to the Southington-Wallingford Junction 115-kV line in Southington, Meriden, and Cheshire. Staff Report.  Approved 8/20/85

PETITION NO. 131 - Northeast Utilities Service Company petition for modification of the Southington-Glen Lake Junction 115-kV line in Southington, Meriden, Wallingford, Cheshire, Hamden, and Bethany. Staff Report.  Approved 8/20/85

PETITION NO. 134 - Northeast Utilities Service Company petition to reconductor the Southington-Schwab Junction 115-kV line in Southington, Cheshire, Meriden, and Wallingford. Staff Report.Approved 8/20/85

PETITION NO. 135 - Northeast Utilities Service Company petition for the construction of the Southington-Lucchini Junction 115-kV line in Southington, Meriden, Wallingford, and Cheshire. Staff Report.  Approved 8/20/85

PETITION NO. 137HW - Solvents Recovery Service of New England, Inc. petition to replace and relocate tank storage, replace equipment, reduce storage capacity and install groundwater treatment system. Approved 9/26/85

PETITION NO. 159 - Northeast Utilities petition for the proposed modifications of a 115-kV line substation bus at Southington Substation. Staff Report.  Approved 8/4/86

PETITION NO. 184 - Connecticut Light and Power Company petition for the proposed addition of one 115-kV transformer, two 23-kV feeder positions, and a looped-line arrangement at the Canal 15Q Substation. Staff Report.  Approved 6/19/87

PETITION NO. 215 - The Connecticut Light and Power Company petition for transformer and switching equipment additions within a 345-kV Substation off Bellview Avenue. Staff Report.  Approved 8/19/88

PETITION NO. 255 - The Connecticut Light and Power Company petition for a proposed addition to its Southington 4C Substation. Staff Report.  Approved 8/22/90

PETITION NO. 363 - CL&P petition that no Certificate of Environmental Compatibility and Public Need is required for proposed additions to the CL&P’s Southington Substation in the Town of Southington. Staff Report.  Approved 11/21/96

PETITION NO. 431 - Sprint PCS petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for modification to an existing Connecticut Light & Power electric transmission facility located at 705 Andrews Street in Southington. Staff Report.  Approved 10/8/99

PETITION NO. 444 - Nextel Communications petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the modification of an existing Connecticut Light and Power electric transmission facility located between Meriden-Waterbury Turnpike (State Route 322) and Rahlene Drive in Southington, Connecticut.  Decision Letter and Staff Report  Approved 4/12/00

PETITION NO. 548 - Yankee Gas Services Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation, and maintenance of a distribution line in Southington, Berlin, and Meriden, Connecticut.   Findings of Fact,   Opinion,  and Decision and Order  Approved 08/01/02.

PETITION NO. 652 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to Southington 4C Substation off of Belleview Avenue, Southington, Connecticut. Staff Report.  Approved 12/9/03

PETITION NO. 691 - Southwestern Bell Mobile Systems, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of cellular antennas and associated equipment at an existing CL&P electric transmission facility on Cathy Drive in Southington, Connecticut. Staff Report.  Approved 08/26/04.

PETITION NO. 706 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a 115-kV series line reactors and associated equipment at the Southington 4C substation in Southington, Connecticut. Staff ReportApproved 04/19/05.

PETITION NO. 764 - Omnipoint Communications, Inc. (T-Mobile) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction of a ten foot (10’) extension to an existing CL&P transmission tower located at 437 Hobart Street, Southington, Connecticut. Staff Report.  Approved 5/17/06.

PETITION NO. 764A - T-Mobile Northeast LLC (T-Mobile) request to amend its declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to relocate an existing T-Mobile facility attached to an Eversource transmission line structure (#1814) onto an approved replacement electric transmission line structure (#1814) within the existing Eversource right-of-way located at 437 Hobart Street, Southington, Connecticut.  Approved 09/15/16.

PETITION NO. 862 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a temporary telecommunications facility at 500 Queen Street, Southington, Connecticut. Staff Report. Approved 8/28/08.  Extended 6/4/09.

PETITION NO. 880 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a permanent replacement flagpole tower and associated equipment located at 500 Queen Street, Southington, Connecticut. Staff Report.  Approved 01/22/09.

PETITION NO. 888 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications of an existing single-circuit 115-kV transmission line (circuit #1860) between Larson Junction United Technologies Substation in the Town of Southington, Connecticut. Staff Report.  Approved 03/12/09.

PETITION NO. 951 - The Connecticut Light and Power Company (CL&P) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing CL&P Southington substation, located at 315 Belleview Avenue, Southington, Connecticut. Staff Report.  Approved 06/17/10.

PETITION NO. 997 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to an existing Connecticut Light and Power substation located at 315 Bellview Avenue, Southington, Connecticut. Staff Report.  Approved 07/28/11

PETITION NO. 1037 – The Connecticut Light and Power Company Petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed replacement of an existing self-supporting lattice tower located at 315 Belleview Avenue, Southington, Connecticut.  Staff Report.  Approved 10/04/12.

PETITION NO. 1106 - New Cingular Wireless PCS, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required to install a rooftop telecommunications tower on an existing commercial building located at 168 Center Street, Southington, Connecticut.  Filing.  Staff Report.  Approved 10/16/14.Revision Request.   Revision Decision Letter.

PETITION NO. 1116 - The Connecticut Light and Power Company (“CL&P”) petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to CL&P’s existing Canal Substation located at 168 Canal Street, Southington, Connecticut.  Filing.Staff Report.  Semi-Annual Status of Construction Report, 12/23/16  Approved 09/18/14

PE1133-VER-20151222 - Cellco Partnership d/b/a Verizon Wireless sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 250 Meriden-Waterbury Turnpike, Southington, Connecticut. Decision. Request for Extension and CSC Approval of Request  Construction Completed.

PE1133-CING-20160829 - New Cingular Wireless PCS, LLC sub-petition for a declaratory ruling for approval of an eligible facility request for modifications to an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut. Dept. of Transportation (no comments)  Decision.Condition 1 Compliance.

PETITION NO. 1136 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing Econo Lodge Motel building located at 1843 Meriden-Waterbury Turnpike, Southington, Connecticut.  Decision Letter and Staff Report.  Decision Letter and Staff ReportCompletion LetterApproved 03/05/15

PETITION NO. 1141 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing office building located at 200 Executive Boulevard, Southington, Connecticut.  Decision Letter and Staff Report.   Completion LetterApproved 04/02/15.

PETITION NO. 1174 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.   Decision Letter and Staff Report.   Completion LetterApproved 09/03/15.

PETITION NO. 1175 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of an existing commercial building located at Bear Creek Campground at Lake Compounce Amusement Park, off Mount Vernon Road, Southington, Connecticut.   Decision Letter and Staff ReportCompletion LetterApproved 09/03/15

PETITION NO. 1201 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of approximately 1.75 miles of its existing No. 1810 115-kV transmission line from Forestville Junction in Southington to Lake Avenue Junction in Bristol, rebuilding and reconductoring of approximately 1.85 miles of its existing Nos. 1800 and 1810 115-kV transmission lines from Southington Substation in Southington to Structure No. 1815 in Southington, reinforcement of an existing transmission structure at Southington Substation in Southington, and related substation and transmission line structure improvements. Approved 01/21/16.

PETITION NO. 1219Quantum Biopower Southington, LLC petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, maintenance, and operation of a 1.1 megawatt anaerobic digestion and combined heat and power electric generating facility located at 49 DePaolo Drive, Southington, Connecticut. Approved 04/14/16

PETITION NO. 1283 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing Southington Substation located at 315 Belleview Avenue, Southington, Connecticut. Approved 2/16/17.

SUB-PETITION NO. 1293-SO-01 (Southington) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Completion

SUB-PETITION NO. 1293-WS-01 (Wolcott-Southington) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Completion

SUB-PETITION NO. 1293-SBMM-01 (Southington-Berlin-Meriden-Middletown) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval 2nd Extension Request and Council Approval  3rd Extension and Council Approval 4th Extension Request and Council Approval 

SUB-PETITION NO. 1293-SCMW-01 (Southington-Cheshire-Meriden-Wallingford) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision  Extension Request and Council Approval

SUB-PETITION NO. 1293-BS-01 (Bristol-Southington) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Extension Request and Council Decision  Second Extension Request and Council Decision  Request for Amendment  Council Decision on Amendment Request  Request for Amendment and Council Decision Third Extension Request and Council Decision Notice of Construction Completion

SUB-PETITION NO. 1293 - SBM-01 (Southington-Berlin-Meriden) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.   Decision Request for Extension and Council Extension Decision  Request for Amendment  Council Decision on Amendment Request Second Extension Request and Council Extension Decision Third Extension Request and Council Decision Request for Project Change and Council Decision

SUB-PETITION NO. 1293-PWS-01 (Plymouth, Wolcott, Southington) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision  Notice of Completion

SUB-PETITION NO. 1293-WS-02 (Wolcott-Southington) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.   Decision Notice of Completion

PETITION NO. 1322 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on an existing utility pole outside of the public right of way located at Mount Southington Ski Area, 396 and 412 Mount Vernon Road, Southington, Connecticut. Approved 9/28/2017

PETITION NO. 1343 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed PSEG Bridgeport Harbor Unit 5 Line Reconductoring Project consisting of conductor replacements on its existing No. 1670 115-kilovolt (kV) electric transmission line extending approximately 5.2 miles within existing Eversource electric transmission line right-of-way between the Southington Substation located at Belleview Avenue in Southington, Connecticut and Reservoir Junction located at Reservoir Road in New Britain, Connecticut, and related substation and electric transmission line structure improvements.  Approved 06/07/18.

PETITION NO. 1349 - New Cingular Wireless PCS, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed extension of an existing wireless telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut.  Approved 10/25/18

PETITION NO. 1392 – Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 300-kilowatt fuel cell facility and associated equipment to be located at the Town of Southington Water Treatment Plant, 999 Meriden Waterbury Turnpike, Southington, Connecticut. Approved 02/27/20

PETITION NO. 1416 - Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 150-kilowatt customer-side fuel cell facility and associated equipment to be located at the Home Depot, 89 Interstate Park Drive,Southington, Connecticut. Approved 08/27/20

PETITION NO. 1418 -   Bloom Energy Corporation petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a customer-side 150-kilowatt fuel cell facility and associated equipment to be located at the Home Depot, 1816 Meriden-Waterbury Turnpike, Southington, Connecticut. Approved 09/10/20

PETITION NO. 1424 - Southington Solar One, LLC  DG Connecticut Solar III, LLC  declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 4.725-megawatt AC solar photovoltaic electric generating facility located at 1012 East Street, Southington, Connecticut, and associated electrical interconnection.  Approved 05/20/21

PETITION NO. 1574 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed Southington Substation to Cook Hill Junction Rebuild Project consisting of the replacement and reconductoring of electric transmission line structures along approximately 11.2 miles of its existing electric transmission line right-of-way shared by its existing 115-kilovolt (kV) 1690, 1208, 1355 and 1610 Lines between Southington Substation in Southington and Cook Hill Junction in Wallingford including the installation of approximately 650 feet of the 1690 Line underground at Lucchini Junction in Meriden, traversing the municipalities of Southington, Cheshire, Wallingford, and Meriden, Connecticut, and related electric transmission line and substation improvements.  Approved 08/17/23

PETITION NO. 1612 – TRITEC Americas, LLC notice of election to waive exclusion from Connecticut Siting Council jurisdiction, pursuant to Connecticut General Statutes §16-50k(e), and petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 0.999-megawatt AC solar photovoltaic electric generating facility located at 37 Hunters Lane, Southington, Connecticut, and associated electrical interconnection.  Approved 06/20/24

Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Birch Mountain Rd., Glastonbury; Shuttle Meadow Rd., Southington; Town Farm Rd., Enfield; Prestige Park Rd., East Hartford; 55 Trumbull St., Hartford; Mountain Rd., Hartford; Beckley Rd., Berlin; Kikapoo Rd., Middlefield; and 391 Niederwerfer Rd., South Windsor Complete File

TS-SCLP-131-990317 - Springwich Cellular Ltd. Partnership request for an order to approve tower sharing at an existing telecommunications facility located off 250 Meriden-Waterbury Turnpike in Southington.

TS-BAM-131-990520 - Bell Atlantic Mobile request for an order to approve tower sharing at an existing telecommunications facility located at 625 Spring Street in Southington.

TS-SCLP-131-990317 - Springwich Cellular Limited Partnership request for an order to approve tower sharing at an existing telecommunications facility located off 250 Meriden-Waterbury Turnpike in Southington.

EM-NEXTEL-131-000404 - Nextel Communications notice of intent to modify an existing telecommunications facility located at 625 Spring Street in Southington, Connecticut.  

TS-NEXTEL-131-010323 - Nextel Communications, Inc. request for an order to approve tower sharing at an existing telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut.

TS-AT&T-131-010326 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless Services request for an order to approve tower sharing at an existing telecommunications facility located at 626 Spring Street, Southington, Connecticut.

TS-AT&T-131-010523 - AT&T Wireless PCS, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut.

TS-AT&T-131-020319 - AT&T Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 250 Meriden Waterbury Road, Southington, Connecticut.

TS-VER-131-020403 - Cellco Partnership d/b/a/ Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at Meriden-Waterbury Road, Southington, Connecticut.

EM-CING-082-083-089-110-131-148-020702 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in Middlefield, Middletown, Plainville, New Britain, Southington, and Wallingford.

EM-AT&T-131-020801 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at Shuttle Meadow Road, Southington, Connecticut.

EM-AT&T-033-105-110-131-155-020905 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities located at Christian Hill Road, Cromwell; 10 Sparks Street, Plainville; 38 Hatchetts Hill Road, Old Lyme; 626 Spring Street, Southington; and 13258 New Britain Avenue, West Hartford, Connecticut. Decision

EM-CING-028-077-101-131-137-145-164-020925 - Southwestern Bell Mobile Systems, LLC notice of intent to modify existing telecommunications facility located in Colchester, Manchester, North Haven, Southington, Stonington, Union, and Windsor.

EM-AT&T-077-031-037-021010 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities located at 205 Spencer Street, Manchester, 500 Queen Street, Southington, and 86 Voluntown Road, Stonington, Connecticut.

EM-AT&T-"UNIVERSAL"-030221 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.

EM-AT&T-"UNIVERSAL"-030520 - AT&T Wireless PCS LLC d/b/a AT&T Wireless notice of intent to modify existing telecommunications facilities throughout Connecticut.

TS-T-MOBILE-131-030626 - Omnipoint Communications, Inc. request for an order to approve tower sharing at an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike (Route 322), Southington, Connecticut.

EM-VER-131-040624 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 675 Spring Street, Southington, Connecticut.
 
EM-VER-008-020-025-108-130-131-050315 -Cellco Partnership d/b/a Verizon Wireless notice of intent to modify existing telecommunications facilities located at 719 George Washington Turnpike, Burlington; Meriden-Waterbury Road, Southington; 751 Higgins Road, Cheshire; 133 Horse Fence Road, Southbury; 93 Old Amity Road, Bethany; and 338 Oxford Road, Oxford, Connecticut.
 
TS-T-MOBILE-131-060411 - Omnipoint Communications, Inc. (T-Mobile) request for an order to approve tower sharing at an existing telecommunications facility located at 440 Old Turnpike Road, Southington, Connecticut.
 
EM-CING-023-131-047-155-056-061130 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 14 Canton Spring Road, Canton; Shuttle Meadow Road, Southington; 232 South Main Street, East Windsor; 3114 Albany Avenue, West Hartford; and 15 North Granby Road, Granby, Connecticut. 
 
EM-CING-007-062-084-131-152-070517 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1684 Chamberlain Highway, Berlin; 890 Evergreen Avenue, Hamden; 234 Melba Street, Milford; 88-100 Cathy Drive, Southington; and 1 Palmer Road, Waterford, Connecticut.  Decision Letter
 
EM-CING-002-044-131-164-164-070716 - New Cingular Wireless PCS LLC notice of intent to modify existing telecommunications facilities located at 401 Wakelee Avenue, Ansonia; 259 Commerce Street, East Haven; 626 Spring Street, Southington; 99 Day Hill Road, Windsor; and 1170 Matianuck Avenue, Windsor, Connecticut.
 
EM-CING-081-126-131-164-165-070808 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 1021 Straits Turnpike, Middlebury; 70 Platt Road, Shelton; 1394 (a/k/a 250) Meriden Waterbury Road, Southington; 404 Hayden Station Road, Windsor; and 4 (a/k/a
2) Volunteer Drive, Windsor Locks, Connecticut.
 
EM-CING-045-059-124-131-152-070914 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at Flanders Road, East Lyme; 725 (a.k.a. 741) Flanders Road, Groton; 6 Progress Avenue; Seymour; Shuttle Meadow Road, Southington; and 41 Manitock Hill Road, Waterford, Connecticut.
 
EM-CING-047-052-131-142-164-071004 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 232 South Main Street, East Windsor; 319-321 New Britain Avenue, Farmington; 250 Meriden-Waterbury Turnpike, Southington; 5 Barbara Road, Tolland; and 750 Rainbow Road, Windsor, Connecticut.
 
EM-CING-131-080530 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Road, Southington, Connecticut.
 
EM-POCKET-131-080909 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.
 
EM-POCKET-131-081021 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at Shuttle Meadow Road, Southington, Connecticut.
 
EM-T-MOBILE-131-090409 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 1349 Route 322, Southington, Connecticut.
 
EM-CLEARWIRE-131-090930 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.
 
TS-POCKET-131-091110- Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications request for an order to approve tower sharing at an existing telecommunications facility located at 440 Old Turnpike Road, Southington, Connecticut.
 
EM-CLEARWIRE-131-091130 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.
 
EM-VER-131-091130 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.
 
EM-CING-131-110325 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 96 Cathy Drive, Southington, Connecticut.
 
TS-METROPCS-131-110720MA - MetroPCS Massachusetts, LLC d/b/a MetroPCS request for an order to approve tower sharing at an existing telecommunications facility located at 1394 Route 322 (Meriden-Waterbury Turnpike), Southington, Connecticut.
 
EM-CING-131-120501 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.

 

EM-AT&T-131-120517 – AT&T Mobility (AT&T) notice of intent to modify an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut.

 

EM-AT&T-131-120621 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.

 

EM-AT&T-131-120705 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut.

 

EM-CING-131-120831 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.

 

EM-VER-131-120906 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.

 

EM-METROPCS-131-121231A-MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.

 

EM-METROPCS-131-121231B-MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.

 

EM-METROPCS-131-130125MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 1394 Meriden-Waterbury Turnpike (Route 322), Southington, Connecticut.

 

EM-METROPCS-131-130307MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 440 Old Turnpike Road, Southington, Connecticut.

 

EM-VER-131-130322 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.

 

EM-SPRINT-131-130617 - Sprint Nextel notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.

 

EM-SPRINT-131-130624 – Sprint Nextel notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. 

 

EM-SPRINT-131-140124Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 705 Andrews Street, Southington, Connecticut.  DecisionExtension Request and CSC Decision.

 

EM-T-MOBILE-131-140327 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 1394 Route 322, Southington, Connecticut.  DecisionCompletion Letter.

 

EM-CING-131-140509New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 250 Meriden/Waterbury Turnpike, Southington, Connecticut.  DecisionCompletion Letter.

 

EM-VER-131-140814 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.   DecisionCompletion Letter.

 

EM-T-MOBILE-131-140917 - T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 440 Old Turnpike Road, Southington, Connecticut.   Decision  Completion Letter.

 

EM-T-MOBILE-131-140929 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 437 Hobart Street, Southington, Connecticut. DecisionCompletion Letter.

 

EM-SPRINT-131-141022 - Sprint PCS notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.  Decision.  Status/Expiration Letter.

 

EM-SPRINT-131-141112 - Sprint PCS notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  Decision. Completion Letter.   

 

EM-AT&T-131-150220 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.  Incomplete Letter. Decision.  Completion Letter.

 

EM-AT&T-131-150414 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.   Decision. Extension Request and CSC Decision.Completion Letter

 

EM-VER-131-150805 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  DecisionExtension Request & Approval2nd Extension Request and CSC ApprovalWill Not Complete Letter

 

EM-EVER-131-150825eEversource Energy notice of intent to modify an existing energy facility located at 168 Canal Street, Southington, Connecticut.  Decision Letter.

EM-T-MOBILE-131-151203 - T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at Shuttle Meadow Road, Southington, Connecticut. Decision. Completion Letter.

EM-T-MOBILE-131-151204 - T-Mobile notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Completion Letter.

EM-AT&T-131-160225AT&T notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. DecisionExtension Request and CSC Decision2nd Extension Request and CSC Decision3rd Extension Request and CSC Decision

EM-AT&T-131-160603 - AT&T notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. DecisionCompletion LetterOutstanding ConditionCondition Compliance

EM-AT&T-131-161215 - AT&T notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.  DecisionCompletion letter

EM-VER-131-170403 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. DecisionExtension Request and CSC Approval LetterWill Not Complete Letter

EM-AT&T-131-170505 – AT&T notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. DecisionExtension Request and CSC DecisionStatus UpdateCompletion Status SheetCompletion Letter

EM-AT&T-131-170518 – AT&T notice of intent to modify an existing telecommunications facility located at 102 Cathy Drive, Southington, Connecticut. DecisionCompletion Letter

EM-AT&T-131-170626 – AT&T notice of intent to modify an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut. IncompleteResponse to IncompleteDecision  Completion

EM-CING-131-170703 (cow) - New Cingular Wireless PCS, LLC notice of intent to install a temporary telecommunications facility located at the 2017 Apple Harvest Festival, 37 Main Street, Southington, Connecticut. Decision

EM-AT&T-131-170719 – AT&T notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. DecisionCompletion Letter

EM-SPRINT-131-171026 - Sprint notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. DecisionCompletion Letter

EM-AT&T-131-180410 - AT&T Mobility, LLC notice of intent to modify an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut.  Decision  Completion Status SheetCompletion Letter

EM-CING-131-180727(cow) -  AT&T notice of intent to install a temporary telecommunications facility located at the 2018 Apple Harvest Festival, 37 Main Street, Southington, Connecticut. Decision

EM-VER-131-180919 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 200 Executive Boulevard, Southington, Connecticut. DecisionWill Not Complete Letter

EM-VER-131-181030 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Completion Letter

EM-T-MOBILE-131-181127 - T-Mobile notice of intent to modify an existing telecommunications facility located at 437 Hobart Street, Southington, Connecticut. Decision Completion Letter

EM-T-MOBILE-131-181214 - T-Mobile notice of intent to modify an existing telecommunications facility located at 440 Old Turnpike Road, Southington, Connecticut. Decision  Cancellation Letter

EM-VER-131-190201 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Incomplete Letter2nd Incomplete Letter Decision - Denial

EM-AT&T-131-190204 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

EM-AT&T-131-190207 - AT&T notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Condition Submission

EM-SPRINT-131-190404 - Sprint Spectrum, LP notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

EM-AT&T-131-190411 - AT&T notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. Decision Notice of Construction Completion

EM-VER-131-190412 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Decision Notice of Construction Completion

EM-ATC-131-190627 - American Tower Corporation, Inc. (ATC) notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. Decision Notice of Construction Completion

EM-EVER-131-190919e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located at 315 Belleview Avenue, Southington, Connecticut. Decision Notice of Construction Completion

EM-VER-131-191217 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

TS-VER-131-191226 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. Town Letter Incomplete Letter Response to Incomplete and 2nd Incomplete Letter Extension Request and Council Approval Response to Incomplete and Council Acknowledgement Council Extension Request Extension of Decision Deadline to May 29, 2020 Decision Notice of Construction Completion

TS-CING-131-200326 - New Cingular Wireless PCS, LLC (AT&T) request for an order to approve tower sharing at an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Proof of Email Submission to Town Town Letter Decision Completion/Compliance Letter

TS-T-MOBILE-131-200413 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Town Letter Decision Notice of Construction Completion

EM-VER-131-200612 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 2450 Mount Vernon Road, Southington, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council ApprovaAdditional Extension Request and Council Approval Notice of Cancellation

EM-CING-131-200813 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Decision Notice of Construction Completion

EM-AT&T-131-200909 - AT&T notice of intent to modify an existing telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Notice of Construction Completion

TS-VER-131-201005 Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

EM-T-MOBILE-131-210222 – T-Mobile notice of intent to modify an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Construction Start Notice of Construction Completion

EM-T-MOBILE-131-210324 - T-Mobile notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  Decision Notice of Construction Completion

EM-CING-131-210511 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 500 Queen Street, Southington, Connecticut.  Decision Notice of Construction Completion

EM-T-MOBILE-131-210726 – T-Mobile notice of intent to modify an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Incomplete Letter Response to Incomplete 2nd Incomplete Letter Response and Council Acknowledgement Decision Notice of Construction Completion

EM-VER-131-210805 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 135 East Street (a/k/a 99) Southington, Connecticut.  Decision Notice of Construction Completion

TS-DISH-131-210819 - DISH Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Structural Analysis Town Letter Decision Notice of Construction Completion

EM-DISH-131-210920 - DISH Wireless LLC notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.  Corrected Filing Incomplete Letter Structural Analysis Mount Analysis Council Acknowledgement Decision Notice of Construction Completion

EM-VER-131-211105 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  Structural Analysis Decision Extension Request and Council Approval Notification of Completion Received/Additional Condition Requirement Outstanding Outstanding Condition Submission

EM-T-MOBILE-131-211117 - T-Mobile  notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Notice of Cancellation

EM-ATC-131-211222 - American Tower Corporation (ATC) notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.  Decision Notice of Construction Completion

EM-AT&T-131-220307 - AT&T notice of intent to modify an existing telecommunications facility located 625 Spring Street, Southington, Connecticut. Decision Notice of Construction Completion Engineer's Certification of Completion

EM-VER-131-220321 - Cellco Partnership d/b/a Verizon notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision

TS-DISH-131-220321 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut. Town Letter Decision Extension Request and Council Extension Approval 

EM-AT&T-131-220413 AT&T notice of intent to modify an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut.  Decision Notice of Construction Completion

TS-DISH-131-220516 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion

EM-VER-131-220708 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 250 Meriden-Waterbury Turnpike, Southington, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Extension Request and Council Extension Approval Notice of Construction Completion

EM-AT&T-131-220728 – AT&T notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut.   Decision Notice of Construction Completion Extension Request and Council Approval

EM-T-MOBILE-131-220822T- Mobile notice of intent to modify an existing telecommunications facility located at 1394 Meriden Waterbury Turnpike, Southington, Connecticut. Decision Notice of Construction Completion

EM-AT&T-131-221005 - AT&T notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut. Decision Notice of Construction Completion

EM-T-MOBILE-131-221017 - T-Mobile notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut. Incomplete Letter Response to Incomplete 2nd Incomplete Letter  Response to Incomplete and Council Acknowledgement Decision  Extension Request and Council Extension Approval  Notice of Construction Commencement Notice of Construction Completion

EM-AT&T-131-230303 – AT&T notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.  Decision Notice of Construction Completion

EM-AT&T-131-230323 – AT&T notice of intent to modify an existing telecommunications facility located at 435 Mill Street, Southington, Connecticut. Decision Notice of Construction Completion

EM-EVER-131-230427e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located at 315 Belleview Avenue, Southington, Connecticut.  Decision Request for Extension and Council Extension Approval

EM-ATT-131-230607 – AT&T notice of intent to modify an existing telecommunications facility located at 250 Meriden Waterbury Turnpike, Southington, Connecticut.  Decision Extension Request and Council Extension Approval Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-230830 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  Decision Project Change and Council Project Change Decision Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-230915Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 250 Meriden-Waterbury Turnpike, Southington, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-231012Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 135 East Street (a/k/a 99) Southington, Connecticut.   Decision Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-240104 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 625 Spring Street, Southington, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-240124 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located 435 Mill Street, Southington, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion

EM-VER-131-240325 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 1394 Meriden-Waterbury Turnpike, Southington, Connecticut.  Decision Notice of Construction Commencement

EM-VER-131-240628
- Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 250 Meriden-Waterbury Turnpike, Southington, Connecticut. Decision

EM-VER-131-240729 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 80 Shuttle Meadow Road, Southington, Connecticut.  Decision