SOUTH WINDSOR

DOCKET NO. 11 - Manchester-North Bloomfield 345-kV line and reconstruction of two 115-kV transmission lines in the vicinity of the Manchester Industrial Park between Meekville Junction-Burnham Road and Pleasant Valley. (Findings of Fact)(Opinion)(Concurring Opinion)(Dissenting Opinion 1)(Dissenting Opinion 2),  and  (Decision and Order).

DOCKET NO. 35 - Southern New England Telephone Company Certificate for telecommunication towers and associated equipment in Southington, Hartford, East Hartford, and South Windsor(Findings of Fact),   (Opinion),  and  (Decision and Order).

DOCKET NO. 40 - Springwich Cellular Limited Partnership Certificate of Environmental Compatibility and Public Need for cellular facilities in Berlin, Middlefield, Southington, Hartford, East Hartford, and off Niederwerfer Road, South Windsor. (Findings of Fact)(Opinion),  and  (Decision and Order).

DOCKET NO. 137 - Metro Mobile CTS of Hartford, Inc. Certificate for cellular facilities in East Hartford, off Burnham Street in South Windsor, and Windsor, Connecticut. (Findings of Fact)(Opinion),  and  (Decision and Order).

DOCKET NO. 518 – New Cingular Wireless PCS, LLC d/b/a AT&T and Tarpon Towers III, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 99 Dart Hill Road, South Windsor, Connecticut.  (Findings of Fact)  (Opinion)  (Decision and Order)

PETITION NO. 201 - The Connecticut Light and Power Company petition for proposed modifications to three 115-kV circuits between Manchester, South Windsor, and Barbour Hill Substations in Manchester and South Windsor. Staff Report.  Approved 2/17/88

PETITION NO. 269 - The Connecticut Light and Power Company petition for proposed modifications to Meekville Junction to South Windsor Junction 115-kV transmission line. Staff Report.  Approved 5/13/91

PETITION NO. 272 - Northeast Utilities Service Company petition for proposed modifications to Barbour Hill Substation, Rockville Substation, and a 115-kV circuit from Barbour Hill Substation to Rockville Substation in South Windsor and Vernon. Staff Report.  Approved 7/16/91

PETITION NO. 286 - The Connecticut Light and Power Company petition for proposed modifications to one 345-kV line and one 115-kV line along Interstate Highway 291 in South Windsor and Manchester. Staff Report.  Approved 9/4/92

PETITION NO. 553 - Town of South Windsor petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a fuel cell at the South Windsor High School, 161 Nevers Road, South Windsor, Connecticut. Staff Report.  Approved 04/03/02

PETITION NO. 710 -The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a power transformer and associated equipment at Barbour Hill Substation, South Windsor, Connecticut. Staff ReportApproved 04/19/05.

PETITION NO. 783 - Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Barbour Hill Substation, South Windsor, ConnecticutStaff Report.  Approved 9/28/06

PETITION NO. 993 - Logan Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 300 kW Fuel Cell project to be located at 50 Talbot Lane, South Windsor, Connecticut. Staff Report.  Approved 07/14/11 Decommissioned in 2017 - See Petition No. 1355

PETITION NO. 995 - UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell at 195 Governors Highway, South Windsor, Connecticut.  Staff Report.  Status UpdateApproved 07/14/11

PETITION NO. 1078 - South Energy Investments, LLC Town of South Windsor CTS Energy, LLC petition for  declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 4.98 5 megawatt fuel cell facility located at 515 John Fitch Boulevard 245 Chapel Road, South Windsor, Connecticut. Staff Report.  Request for Modification.  Certification of Mailing. Request for Extension.  Amendment InterrogatoriesResponses to Amendment Interrogatories. Council Amendment Decision and Staff Report Approved 12/12/13.

PETITION NO. 1123 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 489 Sullivan Avenue, South Windsor, Connecticut. Filing.  Staff Report.  Completion Letter. Approved 01/08/15

PETITION NO. 1140 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of a portion of an existing 115-kV transmission line extending from Barbour Hill Substation in South Windsor to Manchester Substation in Manchester, Connecticut and modifications to Barbour Hill Substation and Manchester Substation.  Approved 04/16/15.

PETITION NO. 1171 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing South Windsor Public Library building located at 1550 Sullivan Avenue, South Windsor, Connecticut. Decision Letter and Staff ReportCompletion Letter. Approved 09/03/15.

PETITION NO. 1238 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements. Approved 10/27/16.

PETITION NO. 1261 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing Verizon Wireless retail store building located at 70 Buckland Road, South Windsor, Connecticut.  Approved 12/8/16.

PETITION NO. 1284 - Bloom Energy Corporation, as an agent for FedEx Ground, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the FedEx Ground building, 40 Kennedy Road, South Windsor, Connecticut. Approved 2/16/17.

SUB-PETITION NO. 1293-ES-01 (East Windsor-South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Completion Letter

SUB-PETITION NO. 1293 – EEWSW-01 (Enfield, East Windsor, South Windsor) Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Completion Letter

SUB-PETITION NO. 1293-BWSWM-01 (Bloomfield, Windsor, South Windsor, Manchester) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval  2nd Extension Request and Council Approval  Notice of Completion

SUB-PETITION NO. 1293-SW-01 (South Windsor) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval Notice of Completion

SUB-PETITION NO. 1293-SWEWES-01 (South Windsor, East Windsor, Ellington, Somers) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Approval Completion Letter

SUB-PETITION NO. 1293-SWV-01 (South Windsor, Vernon) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision  Notice of Completion

SUB-PETITION NO. 1293-SW-02 (South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision  Notice of Completion

PETITION NO. 1355 - Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Carla’s Pasta, 50 Talbot Lane, South Windsor, Connecticut. Approved 12/06/18

PETITION NO. 1374 – Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility and associated equipment to be located at Carla’s Pasta, 280 Nutmeg Road, South Windsor, Connecticut. Approved 08/15/19

PETITION NO. 1622 – C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.66-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 186 Foster Street, South Windsor, Connecticut, and associated electrical interconnection. Withdrawn 08/28/24

SNET Cellular, Inc. - Notice Pursuant to Regulations of State Agencies 16-50j-73 of Intent to Modify Exempt Towers and Associated Equipment operated by SNET Cellular, Inc., located on Aspetuck Ave., New Milford; off Fairfield Dr., Newtown; 405 Brushy Plain Rd., Branford; 4 Hoffmann Rd., Canton; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; 170 Ingham Hill Rd., Old Saybrook; 391 Niederwerfer Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr., Waterbury; Miner La., Waterford; 180A Bayberry La., Westport, Connecticut.

BANM notice of intent to modify existing telecommunications facilities located on Burnham St., South Windsor; and Forbes St., East Hartford.

Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Birch Mountain Rd., Glastonbury; Shuttle Meadow Rd., Southington; Town Farm Rd., Enfield; Prestige Park Rd., East Hartford; 55 Trumbull St., Hartford; Mountain Rd., Hartford; Beckley Rd., Berlin; Kikapoo Rd., Middlefield; and 391 Niederwerfer Rd., South Windsor. Complete File 

EM-CROWN-132-990701 - Crown Atlantic LLC notice of intent to modify an existing telecommunications facility located at 190 Burnham Street in South Windsor.

TS-CING-132-020205 - SNET Mobility, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-CING-132-020326 - SNET Mobility, LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-VER-132-020508 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-AT&T-132-020513 - AT&T Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-NEXTEL-132-020604 - Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-CING-043-064-119-132-155-159-164-020617 - SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in East Hartford, Hartford, Rocky Hill, South Windsor, West Hartford, Wethersfield, and Windsor, Connecticut.
EM-AT&T-132-020701 - AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 300 Governor's Highway, South Windsor, Connecticut.

EM-CING-132-030728 - Southwestern Bell Mobile Systems, LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Street, South Windsor, Connecticut.

EM-T-MOBILE-132-040304 - Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-T-MOBILE-132-040420 - Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.
EM-T-MOBILE-132-040510 - Omnipoint Communications Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.
EM-VER-132-050210 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.
EM-VER-132-050210-A - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.
EM-CING-052-132-060609 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 263 Farmington Avenue, Farmington; and 67 McGuire Road, South Windsor, Connecticut. 
EM-CING-145-167-132-011-060828 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 23 Holland Road, Union; 1055 Wintergreen Avenue, Woodbridge; 300 Governors Highway, South Windsor; and 785 Park Avenue, Bloomfield, Connecticut.
EM-CING-013-105-132-158-083-061221 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 3 Polly Lane, Bozrah; 62-1 Boggy Hill Road, Old Lyme; 151 Sand Hill Road, South Windsor; 2 Sunny Lane, Westport; and 290 Preston Avenue, Middletown, Connecticut.  Decision Letter.
TS-SPRINT-NEXTEL-132-061208 - Sprint Nextel Corporation request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.  Decision Letter.
EM-CING-048-077-132-151-151-070717 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 101 Burbank Road, Ellington; 53 Slater Street, Manchester; 391 Niederwerfer Road, South Windsor; Farmdale Drive, Waterbury; and 229 Sheffield Street, Waterbury, Connecticut.  Decision Letter.
EM-CING-132-134-152-165-166-070726New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 151 Sand Hill Road, South Windsor; 30 Old Country Road, Stafford; 53 Dayton Road, Waterford; 20 Spring Street, Windsor Locks; and 1233 Wolcott Road, Wolcott, Connecticut.
EM-CING-008-049-080-132-151-070904 - New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 719 Amity Road, Bethany; Bright Meadow Boulevard, Enfield; 462 (a/k/a 450-478) West Main Street, Meriden; 300 Governors Highway, South Windsor; and 670 Captain Neville Drive, Waterbury, Connecticut.
EM-POCKET-132-080925 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.
EM-POCKET-132-081016 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 67 McGuire Road, South Windsor, Connecticut.
EM-POCKET-132-081119 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.
TS-POCKET-132-090108 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications request for an order to approve tower sharing at an existing telecommunications facility located at 90 Brookfield Street, South Windsor, Connecticut.
EM-T-MOBILE-132-090406 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.
EM-T-MOBILE-132-090515 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.
EM-VER-132-090514Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.
EM-T-MOBILE-132-090526 - Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.
EM-VER-132-100125 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.

EM-VER-132-100216 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-CLEARWIRE-132-100326 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.
EM-CLEARWIRE-132-100602 – Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.
TS-CLEARWIRE-132-100916 - Clear Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.
EM-AT&T-132-120427 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut.

 

EM-CING-132-120601 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 67 McGuire Road, South Windsor, Connecticut.

 

EM-VER-132-120605 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.

 

EM-CING-132-120629 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-AT&T-132-120907 – AT&T Mobility notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-VER-132-121009 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-SPRINT-132-121126 –Sprint Spectrum notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-METROPCS-132-121228A-MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.

 

EM-METROPCS-132-121228B-MA - MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-SPRINT-NEXTEL-132-130201 - Sprint Nextel Corporation notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.

 

EM-SPRINT-132-130920Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.

 

EM-AT&T-132-131230 - American Telephone and Telegraph Company notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-SPRINT-132-140124Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  DecisionCompletion Letter.

 

EM-T-MOBILE-132-140307 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision.

 

EM-VER-132-140325Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  DecisionCompletion Letter.

 

EM-T-MOBILE-132-140326 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.  DecisionCompletion Letter.

 

EM-VER-132-140609Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. DecisionCompletion Letter.

 

EM-T-MOBILE-132-140902 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Revised FilingDecisionCompletion Letter.

 

EM-VER-132-140902 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  DecisionCompletion Letter.   

 

EM-CROWN-132-150420 - Crown Castle International notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision.  Completion Letter.

 

EM-VER-132-150429 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision.  Extension Request.  Extension Approval.  Completion Letter

 

EM-VER-132-150505 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision.  Completion Letter.

 

EM-T-MOBILE-132-150608 - T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. DecisionCompletion Letter.

 

EM-T-MOBILE-132-150116 - T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. DecisionCompletion Letter.

 

EM-T-MOBILE-132-150813 - T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  DecisionCompletion Letter

EM-T-MOBILE-132-151215 - T-Mobile notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. DecisionCompletion Letter

EM-AT&T-132-160202 - AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. WITHDRAWN.

EM-AT&T-132-160330AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision  Completion Letter

EM-AT&T-132-170112 – AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Decision  Completion Letter

EM-SPRINT-132-170123 – Sprint notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Denied.

EM-SPRINT-132-170224SPRINT notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Incomplete Letter  Response to Incomplete  Decision  Completion Letter

EM-SPRINT-132-170925 - Sprint notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision  Completion Letter

EM-CING-132-171208New Cingular Wireless, PCS, LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision  Completion

TS-SIGFOX-132-180423  – Sigfox NIP LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision  Completion Letter

EM-AT&T-132-180618 – AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision  Completion Letter  Completion Status Sheet

EM-T-MOBILE-132-181102 - T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision  Completion Letter

EM-SPRINT-132-190116 - Sprint notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision  Completion Letter

EM-AT&T-132-190430 – AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Incomplete Letter  Extension Letter  Decision - Denial

EM-T-MOBILE-132-190723 – T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision  Completion Letter

EM-AT&T-132-190725 – AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision  Condition Submission

EM-CING-132-200129 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut. Decision Notice of Completion

EM-T-MOBILE-132-210108 - T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision  Notice of Construction Commencement  Notice of Completion

EM-T-MOBILE-132-210111 - T-Mobile notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision  Notice of Completion

EM-CING-132-210216 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Incomplete Letter  Response to Incomplete and Council Acknowledgement  Decision    Notice of Completion

EM-AT&T-132-210219 - AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision   Notice of Construction Commencement  Notice of Completion

EM-T-MOBILE-132-210226 - T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Notice of Construction Start  Notice of Completion

EM-CING-132-210426 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Incomplete Letter  Response to Incomplete and Council Acknowledgement  Decision  Notice of Construction Commencement Notice of Completion  PE Letter Submission

EM-VER-132-211006 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut. Decision  Extension Request and Council Extension Approval Notice of Cancellation

TS-DISH-132-211118 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Town Letter  Decision  Notice of Completion

TS-DISH-132-211202 - Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut. Town Letter  Supplemental Submission  Property Card  Decision  Notice of Completion

EM-VER-132-211214 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision  Extension Request Council Extension Approval Notice of Construction Completion

EM-CING-132-220106 - New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located 151 Sand Hill Road, South Windsor, Connecticut. Decision  Notice of Completion

TS-DISH-132-220323 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Town Letter  Incomplete Letter  Response to Incomplete and Council Acknowledgement Decision  Notice of Completion

EM-VER-132-220708 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision  Notice of Completion

EM-AT&T-132-220922 (Filing Part 1) - AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut  Filing Part 2  Incomplete Letter  Extension Request  Council Extension Approval  Response to Incomplete and Council Acknowledgement  Decision  Notice of Completion

TS-DISH-132-230413 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 575 Pleasant Valley Road, South Windsor, Connecticut.  Town Letter  Decision  Extension Request and Council Extension Approval

TS-VER-132-240509 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 575 Pleasant Valley Road, South Windsor, Connecticut. Town Letter Decision

EM-VER-132-240703 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  Decision Notice of Construction Commencement

TS-VER-132-240927 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an approved telecommunications facility located at 99 Dart Hill Road, South Windsor, Connecticut.  Town Letter  Decision