Due to the personally identifying information contained in written limited appearance statements from the public, any written limited appearance statements that are received by the Council for any matter are available to be viewed at the Council’s office Monday through Friday from 8:30 a.m. to 4:30 p.m. or available to be sent via e-mail upon request. Please allow adequate time for processing.

Long Island Sound Resource and Use Inventory/Long Island Sound Blue Plan Survey

Town of South Windsor


DOCKET NO. 11  Manchester-North Bloomfield 345-kV line and reconstruction of two 115-kV transmission lines in the vicinity of the Manchester Industrial Park between Meekville Junction-Burnham Road and Pleasant Valley. (Findings of Fact) (Opinion) (Concurring Opinion) (Dissenting Opinion 1) (Dissenting Opinion 2) and (Decision and Order)

DOCKET NO. 35 Southern New England Telephone Company Certificate for telecommunication towers and associated equipment in Southington, Hartford, East Hartford, and South Windsor. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 40 Springwich Cellular Limited Partnership Certificate of Environmental Compatibility and Public Need for cellular facilities in Berlin, Middlefield, Southington, Hartford, East Hartford, and off Niederwerfer Road, South Windsor. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 137  Metro Mobile CTS of Hartford, Inc. Certificate for cellular facilities in East Hartford, off Burnham Street in South Windsor, and Windsor, Connecticut. (Findings of Fact) (Opinion) and (Decision and Order)

DOCKET NO. 518 – New Cingular Wireless PCS, LLC d/b/a AT&T and Tarpon Towers III, LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 99 Dart Hill Road, South Windsor, Connecticut.  (Findings of Fact)  (Opinion)  (Decision and Order)

PETITION NO. 201  The Connecticut Light and Power Company petition for proposed modifications to three 115-kV circuits between Manchester, South Windsor, and Barbour Hill Substations in Manchester and South Windsor. Staff Report Approved 02/17/88

PETITION NO. 269  The Connecticut Light and Power Company petition for proposed modifications to Meekville Junction to South Windsor Junction 115-kV transmission line. Staff Report Approved 05/13/91

PETITION NO. 272 Northeast Utilities Service Company petition for proposed modifications to Barbour Hill Substation, Rockville Substation, and a 115-kV circuit from Barbour Hill Substation to Rockville Substation in South Windsor and Vernon. Staff Report Approved 07/16/91

PETITION NO. 286  The Connecticut Light and Power Company petition for proposed modifications to one 345-kV line and one 115-kV line along Interstate Highway 291 in South Windsor and Manchester. Staff Report Approved 09/4/92

PETITION NO. 553 Town of South Windsor petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a fuel cell at the South Windsor High School, 161 Nevers Road, South Windsor, Connecticut. Staff Report Approved 04/03/02

PETITION NO. 710 – The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a power transformer and associated equipment at Barbour Hill Substation, South Windsor, Connecticut. Staff Report Approved 04/19/05

PETITION NO. 783 Connecticut Light & Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the Barbour Hill Substation, South Windsor, ConnecticutStaff Report Approved 09/28/06

PETITION NO. 993  Logan Energy Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 300 kW Fuel Cell project to be located at 50 Talbot Lane, South Windsor, Connecticut. Staff Report Approved 07/14/11 Decommissioned in 2017 - See Petition No. 1355

PETITION NO. 995  UTC Power Corporation petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 400 kW Fuel Cell at 195 Governors Highway, South Windsor, Connecticut.  Staff Report Status Update Approved 07/14/11

PETITION NO. 1078 South Energy Investments, LLC Town of South Windsor CTS Energy, LLC petition for  declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the installation of a 4.98 5 megawatt fuel cell facility located at 515 John Fitch Boulevard 245 Chapel Road, South Windsor, Connecticut. Staff Report Request for Modification Certification of Mailing Extension Request and Council Decision Amendment Interrogatories Responses to Amendment Interrogatories Council Amendment Decision and Staff Report Approved 12/12/13

PETITION NO. 1123 Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for a proposed rooftop telecommunications facility on an existing building located at 489 Sullivan Avenue, South Windsor, Connecticut. Filing.  Staff Report Notice of Construction Completion Approved 01/08/15

PETITION NO. 1140 – Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed reconductoring of a portion of an existing 115-kV transmission line extending from Barbour Hill Substation in South Windsor to Manchester Substation in Manchester, Connecticut and modifications to Barbour Hill Substation and Manchester Substation.  Approved 04/16/15

PETITION NO. 1171 Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility on the roof of the existing South Windsor Public Library building located at 1550 Sullivan Avenue, South Windsor, Connecticut. Decision and Staff Report Notice of Construction Completion Approved 09/03/15

PETITION NO. 1238  Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the 1779 transmission line traversing the municipalities of Hartford, East Hartford, and South Windsor, Connecticut, and related transmission line structure improvements. Approved 10/27/16

PETITION NO. 1261  Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell wireless telecommunications facility on the roof of an existing Verizon Wireless retail store building located at 70 Buckland Road, South Windsor, Connecticut.  Approved 12/08/16

PETITION NO. 1284  Bloom Energy Corporation, as an agent for FedEx Ground, petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the construction, operation and maintenance of a Customer-Side 250-Kilowatt Fuel Cell Facility to be located at the FedEx Ground building, 40 Kennedy Road, South Windsor, Connecticut. Approved 02/16/17

SUB-PETITION NO. 1293-ES-01 (East Windsor-South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293 – EEWSW-01 (Enfield, East Windsor, South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-BWSWM-01 (Bloomfield, Windsor, South Windsor, Manchester) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Second Extension Request and Council Decision Notice of Construction Completion

SUB-PETITION NO. 1293-SW-01 (South Windsor)  Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion

SUB-PETITION NO. 1293-SWEWES-01 (South Windsor, East Windsor, Ellington, Somers) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Extension Request and Council Decision Notice of Construction Completion

SUB-PETITION NO. 1293-SWV-01 (South Windsor, Vernon) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Notice of Construction Completion

SUB-PETITION NO. 1293-SW-02 (South Windsor) – Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements.  Decision Notice of Construction Completion

PETITION NO. 1355 Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility to be located at Carla’s Pasta, 50 Talbot Lane, South Windsor, Connecticut. Approved 12/06/18

PETITION NO. 1374 – Doosan Fuel Cell America, Inc. petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 440-kilowatt customer-side combined heat and power fuel cell facility and associated equipment to be located at Carla’s Pasta, 280 Nutmeg Road, South Windsor, Connecticut. Approved 08/15/19

PETITION NO. 1622 – C-Tec Solar, LLC petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed construction, maintenance and operation of a 1.66-megawatt AC solar photovoltaic electric generating facility and associated equipment to be located at 186 Foster Street, South Windsor, Connecticut, and associated electrical interconnection. Withdrawn 08/28/24

SNET Cellular, Inc.  Notice Pursuant to Regulations of State Agencies 16-50j-73 of Intent to Modify Exempt Towers and Associated Equipment operated by SNET Cellular, Inc., located on Aspetuck Ave., New Milford; off Fairfield Dr., Newtown; 405 Brushy Plain Rd., Branford; 4 Hoffmann Rd., Canton; Town Farm Rd., Enfield; Birch Mountain Rd., Glastonbury; Tanner Marsh Rd., Guilford; 139 Morris Hubbard Rd., Haddam; Mountain St., Hartford; Kikapoo Rd., Middlefield; 438 Bridgeport Ave., Milford; 170 Ingham Hill Rd., Old Saybrook; 391 Niederwerfer Rd., S. Windsor; 555 Main St., Stamford; Farmdale Dr., Waterbury; Miner La., Waterford; 180A Bayberry La., Westport, Connecticut.

BANM notice of intent to modify existing telecommunications facilities located on Burnham St., South Windsor; and Forbes St., East Hartford.

Springwich Cellular Ltd. Partnership notice of intent to modify existing telecommunications facilities located on Birch Mountain Rd., Glastonbury; Shuttle Meadow Rd., Southington; Town Farm Rd., Enfield; Prestige Park Rd., East Hartford; 55 Trumbull St., Hartford; Mountain Rd., Hartford; Beckley Rd., Berlin; Kikapoo Rd., Middlefield; and 391 Niederwerfer Rd., South Windsor. Complete File

EM-CROWN-132-990701  Crown Atlantic LLC notice of intent to modify an existing telecommunications facility located at 190 Burnham Street in South Windsor.

TS-CING-132-020205 SNET Mobility, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-CING-132-020326  SNET Mobility, LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-VER-132-020508  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-AT&T-132-020513  AT&T Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-NEXTEL-132-020604  Nextel Communications Inc. notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

EM-CING-043-064-119-132-155-159-164-020617 SNET Mobility, LLC notice of intent to modify existing telecommunications facilities located in East Hartford, Hartford, Rocky Hill, South Windsor, West Hartford, Wethersfield, and Windsor, Connecticut.  
 
EM-AT&T-132-020701  AT&T Wireless PCS, LLC d/b/a AT&T Wireless notice of intent to modify an existing telecommunications facility located at 300 Governor's Highway, South Windsor, Connecticut.  
 
EM-CING-132-030728 Southwestern Bell Mobile Systems, LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Street, South Windsor, Connecticut.   
 
EM-T-MOBILE-132-040304  Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.   
 
EM-T-MOBILE-132-040420 Omnipoint Communications, Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.  
 
EM-T-MOBILE-132-040510  Omnipoint Communications Inc. (T-Mobile) notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.  
 
EM-VER-132-050210 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  
 
EM-VER-132-050210-A Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  
 
EM-CING-052-132-060609 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 263 Farmington Avenue, Farmington; and 67 McGuire Road, South Windsor, Connecticut.  
 
EM-CING-145-167-132-011-060828 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 23 Holland Road, Union; 1055 Wintergreen Avenue, Woodbridge; 300 Governors Highway, South Windsor; and 785 Park Avenue, Bloomfield, Connecticut.  
 
EM-CING-013-105-132-158-083-061221  New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 3 Polly Lane, Bozrah; 62-1 Boggy Hill Road, Old Lyme; 151 Sand Hill Road, South Windsor; 2 Sunny Lane, Westport; and 290 Preston Avenue, Middletown, Connecticut.  Decision
 
TS-SPRINT-NEXTEL-132-061208  Sprint Nextel Corporation request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.  Decision
 
EM-CING-048-077-132-151-151-070717 – New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 101 Burbank Road, Ellington; 53 Slater Street, Manchester; 391 Niederwerfer Road, South Windsor; Farmdale Drive, Waterbury; and 229 Sheffield Street, Waterbury, Connecticut.  Decision
 
EM-CING-132-134-152-165-166-070726 New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 151 Sand Hill Road, South Windsor; 30 Old Country Road, Stafford; 53 Dayton Road, Waterford; 20 Spring Street, Windsor Locks; and 1233 Wolcott Road, Wolcott, Connecticut.  
 
EM-CING-008-049-080-132-151-070904  New Cingular Wireless PCS, LLC notice of intent to modify existing telecommunications facilities located at 719 Amity Road, Bethany; Bright Meadow Boulevard, Enfield; 462 (a/k/a 450-478) West Main Street, Meriden; 300 Governors Highway, South Windsor; and 670 Captain Neville Drive, Waterbury, Connecticut.  
 
EM-POCKET-132-080925 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  
 
EM-POCKET-132-081016 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 67 McGuire Road, South Windsor, Connecticut.  
 
EM-POCKET-132-081119 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  
 
TS-POCKET-132-090108 – Youghiogheny Communications-Northeast, LLC d/b/a Pocket Communications request for an order to approve tower sharing at an existing telecommunications facility located at 90 Brookfield Street, South Windsor, Connecticut.  
 
EM-T-MOBILE-132-090406 Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.  
 
EM-T-MOBILE-132-090515 Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  
 
EM-VER-132-090514 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.  
 
EM-T-MOBILE-132-090526 Omnipoint Communications, as subsidiary of T-Mobile USA, Inc., notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.   
 
EM-VER-132-100125  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  
 
EM-VER-132-100216  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  
 
EM-CLEARWIRE-132-100326 Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.   
 
EM-CLEARWIRE-132-100602 Clearwire Corporation notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.   
 
TS-CLEARWIRE-132-100916 Clear Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  
 
EM-AT&T-132-120427 AT&T Mobility notice of intent to modify an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut.

 

EM-CING-132-120601 New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 67 McGuire Road, South Windsor, Connecticut.

 

EM-VER-132-120605 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.

 

EM-CING-132-120629 New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-AT&T-132-120907 AT&T Mobility notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-VER-132-121009 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-SPRINT-132-121126 – Sprint Spectrum notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-METROPCS-132-121228A-MA  MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.

 

EM-METROPCS-132-121228B-MA  MetroPCS Massachusetts, LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.

 

EM-SPRINT-NEXTEL-132-130201  Sprint Nextel Corporation notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.

 

EM-SPRINT-132-130920 Sprint Spectrum, L.P. notice of intent to modify an existing telecommunications facility located at 300 Governor’s Highway, South Windsor, Connecticut.

 

EM-AT&T-132-131230  American Telephone and Telegraph Company notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.

 

EM-SPRINT-132-140124 Sprint Spectrum L.P. notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Decision Notice of Construction Completion

 

EM-T-MOBILE-132-140307 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision

 

EM-VER-132-140325 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  Decision Notice of Construction Completion

 

EM-T-MOBILE-132-140326 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.  Decision Notice of Construction Completion

 

EM-VER-132-140609 Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion

 

EM-T-MOBILE-132-140902 – T-Mobile Northeast LLC notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Revised Filing Decision Notice of Construction Completion

 

EM-VER-132-140902  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  Decision Notice of Construction Completion   

 

EM-CROWN-132-150420  Crown Castle International notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Notice of Construction Completion

 

EM-VER-132-150429  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Extension Request Council Extension Decision Notice of Construction Completion 

 

EM-VER-132-150505  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion

 

EM-T-MOBILE-132-150608  T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Notice of Construction Completion

 

EM-T-MOBILE-132-150116  T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Notice of Construction Completion

 

EM-T-MOBILE-132-150813 T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-T-MOBILE-132-151215  T-Mobile notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-132-160202 AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Withdrawn  
 
EM-AT&T-132-160330 AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-132-170112 – AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-SPRINT-132-170123 – Sprint notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision  
 
EM-SPRINT-132-170224 SPRINT notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Incomplete Letter Response to Incomplete Decision Notice of Construction Completion
 
EM-SPRINT-132-170925  Sprint notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-CING-132-171208 New Cingular Wireless, PCS, LLC notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
TS-SIGFOX-132-180423 – Sigfox NIP LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-132-180618 – AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion Completion Status Sheet
 
EM-T-MOBILE-132-181102  T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-SPRINT-132-190116  Sprint notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-132-190430 – AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Incomplete Letter Extension Request and Council Decision Decision
 
EM-T-MOBILE-132-190723 – T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-AT&T-132-190725 – AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Decision Condition Submission
 
EM-CING-132-200129 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-T-MOBILE-132-210108  T-Mobile notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-T-MOBILE-132-210111  T-Mobile notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
EM-CING-132-210216 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-AT&T-132-210219  AT&T notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-T-MOBILE-132-210226  T-Mobile notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion
 
EM-CING-132-210426 – New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut.  Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Commencement Notice of Construction Completion PE Letter Submission
 
EM-VER-132-211006  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut. Decision Extension Request and Council Decision Notice of Cancellation
 
TS-DISH-132-211118  Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut. Town Letter Decision Notice of Construction Completion
 
TS-DISH-132-211202  Dish Wireless LLC request for an order to approve tower sharing at an existing telecommunications facility located at 391 Niederwerfer Road, South Windsor, Connecticut. Town Letter Supplemental Submission Property Card Decision Notice of Construction Completion
 
EM-VER-132-211214  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Decision Extension Request Council Extension Decision Notice of Construction Completion
 
EM-CING-132-220106  New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located 151 Sand Hill Road, South Windsor, Connecticut. Decision Notice of Construction Completion
 
TS-DISH-132-220323  Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut. Town Letter Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
EM-VER-132-220708 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision Notice of Construction Completion
 
EM-AT&T-132-220922 (Filing Part 1)  AT&T notice of intent to modify an existing telecommunications facility located at 151 Sand Hill Road, South Windsor, Connecticut  Filing Part 2 Incomplete Letter Extension Request Council Extension Decision Response to Incomplete and Council Acknowledgement Decision Notice of Construction Completion
 
TS-DISH-132-230413 – Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 575 Pleasant Valley Road, South Windsor, Connecticut.  Town Letter Decision Extension Request and Council Decision Additional Extension Request and Council Decision  
 
TS-VER-132-240509  Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 575 Pleasant Valley Road, South Windsor, Connecticut. Town Letter Decision Minor Modification Request Council Decision on Minor Modification Extension Request and Council Decision  Notice of Construction Commencement  


EM-VER-132-240703  Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 190 Burnham Street, South Windsor, Connecticut.  Decision Notice of Construction Commencement Notice of Construction Completion

TS-VER-132-240927  Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an approved telecommunications facility located at 99 Dart Hill Road, South Windsor, Connecticut.  Town Letter Decision Notice of Construction Commencement  

EM-ATT-132-250410 – AT&T notice of intent to modify an existing telecommunications facility located at 59 McGuire Road, South Windsor, Connecticut.  Decision

EM-VER-132-250626 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision  

EM-ATT-132-250722  New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located 300 Governors Highway, South Windsor, Connecticut.  Decision

EM-ATT-132-251016 New Cingular Wireless PCS, LLC (AT&T) notice of intent to modify an existing telecommunications facility located at 300 Governors Highway, South Windsor, Connecticut.  Decision