SHERMAN
DOCKET NO. 134 – Iroquois Gas Transmission System, L.P. application for a Certificate of Environmental Compatibility and Public Need to construct, operate, and maintain an Interstate Natural Gas Transmission Pipeline from Sherman to Milford and Long Island Sound. (Findings of Fact), (Opinion), and (Decison and Order).
DOCKET NO. 134A - Iroquois Gas Transmission System, L.P. request for an amendment to a Certificate of Environmental Compatibility and Public Need to construct, operate, and maintain an Interstate Natural Gas Transmission Pipeline from Sherman to Milford and Long Island Sound. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 134B - Iroquois Gas Transmission System, L.P. amendment to a Certificate of Environmental Compatibility and Public Need to construct, operate, and maintain an Interstate Natural Gas Transmission Pipeline from Sherman to Milford and Long Island Sound. (Findings of Fact), (Opinion), and (Decision and Order).
PETITION NO. 413 - Iroquois Gas Transmission System, L.P. petition that no Certificate of Environmental Compatibility and Public Need is required for the installation of ground beds adjacent to the existing natural gas pipeline located in the Town of Sherman and Shelton. Staff Report. Approved 7/15/99
DOCKET NO. 499 - Infra Towers, LLC Homeland Towers, LLC and New Cingular Wireless PCS, LLC d/b/a AT&T application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 16 Coote Hill Road, Sherman, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order)
PETITION NO. 1216 - Eversource Energy petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to its existing Long Mountain Switching Station located at Long Mountain Road, New Milford, Connecticut and the reconductoring of approximately 5.3 miles of its existing No. 398 345-kV transmission line from Long Mountain Switching Station to the New York/Connecticut state line in New Milford, Sherman, and Kent, Connecticut, and related transmission line structure improvements. Approved 03/31/16.