SALISBURY

DOCKET NO. 306 - Wireless Edge Fairfield Group LLC application for a Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a cellular telecommunications facility located at 52 Library Street, Salisbury, Connecticut. (Findings of Fact),  (Opinion), and (Decision and Order).

DOCKET NO. 452 -  Homeland Towers, LLC and New Cingular Wireless PCS, LLC application for a InSite Towers Development, LLC Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at Salisbury Tax Assessor Map 16 Lot 5, 250 Canaan Road, Salisbury, Connecticut. (Record), (Findings of Fact), (Opinion), (Decision and Order)

DOCKET NO. 501 -  TowerCo 2013 LLC New Cingular Wireless PCS, LLC application for a  Certificate of Environmental Compatibility and Public Need for the construction, maintenance, and operation of a telecommunications facility located at 106 Sharon Road, Lakeville (Salisbury), Connecticut.(Findings of Fact)  (Opinion)  (Decision and Order)

PETITION NO. 45 - Haystack Cable Vision petition for an 80-foot triangular-based lattice telecommunications tower and associated concrete block equipment building on Mount Riga. Approved - No Certificate Required 12/1/78

PETITION NO. 121 - Haystack Corporation petition for modification of a CATV head-end facility on Mount Riga. Staff Report.  Approved 12/20/84

PETITION NO. 1193 - Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed installation of a small cell telecommunications facility at Lime Rock Park, 497 Lime Rock Road, Lakeville, Connecticut.  Staff Report and Decision LetterApproved 11/12/15.

PETITION NO. 1331 Cellco Partnership d/b/a Verizon Wireless petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed installation of two small cell wireless telecommunications facilities located at Lime Rock Park, 497 Lime Rock Road, Lakeville (Salisbury), Connecticut. Approved 12/7/17

PETITION NO. 1371 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 667 Line Rebuild Project consisting of the replacement and reconductoring of approximately 6.1 miles of its existing No. 667 69-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between Falls Village Substation in Falls Village (Canaan) and Salisbury Substation in Salisbury, Connecticut, traversing Canaan, Sharon and Salisbury, and related substation and electric transmission line structure improvements. Approved 06/06/19

PETITION NO. 1457 - The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 690 Line Rebuild Project consisting of: a) replacement and reconductoring of approximately 1.6 miles of its existing No. 690 69-kilovolt (kV) electric transmission line structures within existing Eversource electric transmission line right-of-way between Salisbury Substation in Salisbury and Central Hudson Gas and Electric Corporation's electric transmission system at the Connecticut/New York state line in Sharon, Connecticut; (b) installation of temporary backup electric generation at Falls Village Substation in Canaan and Salisbury Substation in Salisbury, Connecticut; and (c) related substation and electric transmission line structure improvementsApproved 9/23/21

Haystack Cablevision notice of intent to modify an existing telecommunications facility located in Salisbury.

PETITION NO. 1575 The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for proposed modifications to its existing Salisbury Substation located at 316 Indian Mountain Road, Salisbury, Connecticut, and related electric transmission line structure improvements.  Approved 08/31/23

TCI Cablevision of Northwestern Connecticut notice of intent to modify an existing telecommunications facility located at Bunker Hill Road in Salisbury.

EM-VER-122-090401 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.
EM-VER-122-120430- Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.

 

EM-CING-122-121102 – New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.

 

EM-CL&P-122-130730 – The Connecticut Light and Power Company notice of intent to modify an existing energy facility located at 384 Indian Mountain Road, Salisbury, Connecticut.

 

EM-VER-122-130823 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. 

 

EM-ATC-122-140611 - American Tower Corporation (“ATC”) notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. DecisionNot Constructed.

 

EM-T-MOBILE-122-161026- T-Mobile notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.  Incomplete Letter. (See tower share TS-T-MOBILE-122-161128)

 

TS-T-MOBILE-122-161128 - T-Mobile Northeast LLC request for an order to approve tower sharing at an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. Signed/Stamped Structural Decision Notice of Completion Letter

 

EM-AT&T-122-191107 – AT&T Mobility, LCC notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. Incomplete LetterResponse to Incomplete and Council AcknowledgementDecision  Notice of Completion Letter

 

EM-EVER-122-201214 - The Connecticut Light and Power Company d/b/a Eversource Energy  notice of intent to modify an existing telecommunications facility located at 316 Indian Mountain Road, Salisbury, Connecticut. Decision  Notice of Completion

 

EM-T-MOBILE-122-210524 - T-Mobile notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. Decision  Notice of Completion

 

EM-ATC-122-210901 – American Tower Corporation (ATC) notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut  Decision

 

EM-VER-122-210929 – Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.  Decision  Extension Request and Council Extension Approval  Notice of Project Cancellation

 

EM-T-MOBILE-122-221014 – T-Mobile notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut. Decision  Condition Submission  Notice of Commencement Notice of Construction Completion

EM-VER-122-240229 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 52 Library Street, Salisbury, Connecticut.  Decision