PRESTON
DOCKET NO. 70 - Southeastern Connecticut Regional Resource Recovery facility Application to generate electricity by mass-burning municipal solid waste. Withdrawn.
DOCKET NO. 74 - The Connecticut Resources Recovery Authority, Southeastern Connecticut Regional Resources Recovery Authority, and American REF-FUEL Company Certificate for the construction of a Southeastern Connecticut Regional Resources Recovery facility to generate electricity by mass-burning municipal solid waste. (Findings of Fact), (Opinion), (Dissenting Opinion), and (Decision and Order).
DOCKET NO. 106 - Connecticut Light and Power Company application for a Certificate of Environmental Compatibility and Public Need for the construction of a 69 kV transmission line to interconnect the 14 MW Southeastern Connecticut Regional Resources Recovery Authority Project in Preston, Connecticut. Withdrawn.
DOCKET NO. 108 - The Connecticut Light and Power Company Certificate for the construction of a 69-kV transmission line to interconnect the 14 MW Southeastern Connecticut Regional Resources Recovery Authority project in Preston, Connecticut. (Findings of Fact), (Opinion), and (Decision and Order).
DOCKET NO. 133 - Intercon Gas, Inc. application for a Certificate of Environmental Compatibility and Public Need for the proposed construction and operation of the Thames River Pipeline. Dismissed.
PETITION NO. 170 - CRRA, SCRRA, and American Refuel petition for an electric generating facility fueled by mass-burning municipal solid waste, in Preston. Withdrawn 12/1/86 .
PETITION NO. 278 - Northeast Utilities Service Company and the City of Groton Department of Utilities petition for proposed modifications to existing 69-kV transmission lines and substations in Montville, Ledyard, Preston and Groton. Staff Report. Approved 1/6/92
PETITION NO. 871 - Algonquin Gas Transmission Company Federal Energy Regulatory Commission (FERC) application (Docket No. 08-426) for the construction and operation of the HubLine/East to West Project located in Massachusetts, Connecticut, Rhode Island and New Jersey. Connecticut segment includes replacement of 11 miles of existing pipeline, appurtenant infrastructure, and installation of access roads in the Towns of Norwich, Preston, Ledyard, and North Stonington as well as upgrades to an existing compressor station in Cromwell. Final EISStaff Report. Approved 12/18/08.
PETITION NO. 894 - The Connecticut Light and Power Company petition for a declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for the proposed modifications to the existing six CL&P Substations located at Tomac Avenue, Greenwich; 7 Prange Road, Brookfield; 52 Peaceable Street, Redding; 85 ½ Weston Road, Weston; 164 North Eagleville Road, Mansfield; and Roosevelt Avenue, Preston, Connecticut. Staff Report. Approved 05/07/09.
SUB-PETITION NO. 1293-PLCPB-01 (Preston, Lisbon, Canterbury, Plainfield, Brooklyn) - Eversource Energy declaratory ruling that no Certificate of Environmental Compatibility and Public Need is required for all transmission facility asset condition maintenance improvements statewide to comply with the updated National Electrical Safety Code clearance requirements. Decision Request for Access Road Change Revision Decision Request for Extension with CSC Decision Completion Letter
PETITION NO. 1384 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed replacement of electric transmission line structures along approximately 18 miles of its existing No. 1505/1607 115-kilovolt (kV) double-circuit electric transmission line within existing Eversource electric transmission line right-of-way between the existing Tunnel Substation in Preston, the existing Fry Brook Substation in Plainfield and the existing Brooklyn Substation in Brooklyn, Connecticut, traversing Preston, Canterbury, Plainfield and Brooklyn, and related electric transmission structure improvements. Approved 11/21/19
PETITION NO. 1486 – The Connecticut Light and Power Company d/b/a Eversource Energy petition for a declaratory ruling, pursuant to Connecticut General Statutes §4-176 and §16-50k, for the proposed 400/500 Lines Rebuild Project consisting of the upgrade of the existing No. 400 69-kilovolt (kV) electric transmission line to 115-kV and the replacement and reconductoring of electric transmission line structures along 8.6 miles of the existing No. 400 electric transmission line within existing Eversource electric transmission line right-of-way between Ledyard Junction in Ledyard and Tunnel Substation in Preston; and the replacement and reconductoring of electric transmission line structures along approximately 4.9 miles of the existing No. 500 69-kV electric transmission line within existing Eversource electric transmission line right-of-way between Hallville Junction in Ledyard and Tunnel Substation in Preston Connecticut, and related electric transmission line and substation improvements. Approved 05/12/22
TS-VER-114-001117 - Cellco Partnership d/b/a Verizon Wireless request for an order to approve tower sharing at an existing telecommunications facility located at 389 Route 2, Preston, Connecticut.
EM-T-MOBILE-114-151204 - T-Mobile notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision. Completion Letter.
EM-VER-114-160201 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 101A Pierce Road, Preston, Connecticut. DecisionWill Not Complete Modifications Letter
EM-SPRINT-114-170118 - Sprint notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision
EM-VER-114-170117 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. DecisionRequest for Extension and CSC ApprovalWill Not Complete
EM-SPRINT-114-170403 – Sprint notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision
EM-VER-114-180208 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 101 Pierce Road, Preston, Connecticut. Decision Completion Letter
EM-CING-114-180411 - New Cingular Wireless PCS, LLC notice of intent to modify an existing telecommunications facility located at 101 Pierce Road, Preston, Connecticut. Decision Completion Notice
EM-SPRINT-114-180613 – Sprint notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision. Completion LetterConstruction Complete
EM-SPRINT-114-180813 - Sprint notice of intent to modify an existing telecommuncations facility located at 101 Pierce Road, Preston, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision
EM-AT&T-114-180816 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. DecisionCompletion Status Sheet
EM-AT&T-114-181203 - AT&T Mobility notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision Notice of Completion
EM-EVER-114-200204e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located along Route 2A, Preston, Connecticut. Decision Extension Request and Council Approval Notice of Completion
EM-AT&T-114-200922 - AT&T notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision Notice of Completion
EM-T-MOBILE-114-210416 - T-Mobile notice of intent to modify an existing telecommunications facility located at 101 Pierce Road, Preston, Connecticut. Decision Notice of Completion
EM-T-MOBILE-114-211018 - T-Mobile notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Incomplete Letter Response to Incomplete and Council Acknowledgement Decision Notice of Cancellation
EM-VER-114-211105 - Cellco Partnership d/b/a Verizon Wireless notice of intent to modify an existing telecommunications facility located at 101 Pierce Road, Preston, Connecticut. Mount Analysis Decision Notice of Project Cancellation
TS-DISH-114-220531 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Town Letter Decision Notice of Completion
TS-DISH-114-220622 - Dish Wireless, LLC request for an order to approve tower sharing at an existing telecommunications facility located at 101 Pierce Road, Preston, Connecticut. Town Letter Decision Notice of Completion
EM-T-MOBILE-114-220822 – T-Mobile notice of intent to modify an existing telecommunications facility located at 389 Route 2, Preston, Connecticut. Decision Notice of Construction Completion
EM-EVER-114-241120e – The Connecticut Light and Power Company d/b/a Eversource Energy notice of intent to modify an existing energy facility located at 72 Roosevelt Avenue, Preston, Connecticut.